Laserfiche WebLink
DocuSign Envelope ID: F87788EB-A740-406C-B664-CCCE613F3A30 <br />9 of 32 <br />Friday, July 22, 2022 <br />,SOB PHOTOS <br />f { ' <br />J F <br />r: 'r <br />FOUNDATION SPECIAUST <br />.. t b — -- -. — — <br />Crew <br />Crew will be installing helical piles #1-2 along the Crew will be installing helical #3-7 along the East side of <br />North side of home's foundation. Crew will be home's foundation. Crew will be installing 6" C <br />excavating 2x2 area's in locations where piles will be channeling along home's foundation in designated <br />placed. Crew will lay plastic down for all excavated locations to strengthen and reinforce home's <br />soils and debris. foundation. <br />Crew will be removing 11 existing 46 posts and will <br />Rhoda hammer & place adj. 44 bracket into <br />existing strip footing with pressure treated 4x6 <br />posts and positive connections from beam to post. <br />Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as building geometry, tributary areas, and <br />loading were determined through examination of these photographs and industry knowledge of standard construction practices. - L120 <br />