My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 OAKES AVE 2025-04-07
>
Address Records
>
OAKES AVE
>
6101
>
6101 OAKES AVE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 7:50:56 AM
Creation date
3/19/2025 3:21:54 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
6101
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PLUMB 02- CORRECTION <br /> 4/5/2023 4/5/2023 GROUND JEFF M RHODE REQUIRED see notes <br /> WORK/SLAB <br /> Notes: <br /> 4/3/2023 7:07 PM Tyler Ackley <br /> Contact Name:Tyler Ackley <br /> Site Address:6101 OAKES AVE <br /> Phone:4253453984 <br /> e-Mail:tyler.s.ackley@aol.com <br /> -water test for ground work <br /> 712.2 Water Test <br /> The water test shall be applied to the drainage and vent systems either in its entirety or in sections.Where the test is applied to the entire system, <br /> openings in the piping shall be tightly closed,except the highest opening,and the system filled with water to the point of overflow.Where the system is <br /> tested in sections,each opening shall be tightly plugged,except the highest opening of the section under test,and each section shall be filled with <br /> water,but no section shall be tested with less than a 10 foot head of water(30 kPa). In testing successive sections,not less than the upper 10 feet(3048 <br /> mm)of the next preceding section shall be tested,so that no joint or pipe in the building(except the uppermost 10 feet(3048 mm)of the system)shall <br /> have been submitted to a test of less than a 10 foot head of water(30 kPa).The water shall be kept in the system,or in the portion under test,for not <br /> less than 15 minutes before inspection starts.The system shall then be tight at all points. <br /> -2"waste for kitchen sink 702.1 Trap Size sub note 2 <br /> PLUMB 02- <br /> 4/10/2023 E <br /> 0/2023 GROUND JEFF M RHODE APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> 4/8/2023 10:11 PM Tyler Ackley <br /> Contact Name:Tyler Ackley <br /> Site Address:6101 OAKES AVE <br /> Phone:4253453984 <br /> e-Mail:tyler.s.ackley@aol.com <br /> -water test on underground waste ok-will require water test on rough plumbing <br /> 4/28/2023 F4/28/2023 PLUMB 03-ROUGH I JEFF M RHODE APPROVAL eTRAKiT Inspection Request <br /> IN <br /> Notes: <br /> 4/27/2023 12:25 PM Tyler Ackley <br /> Contact Name:Tyler Ackley <br /> Site Address:6101 OAKES AVE <br /> Phone:4253453984 <br /> e-Mail:tyler.s.ackley@aol.com <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 10/18/2023 10/18/2023 (REASON <br /> GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> FAMILY SET BACK <br /> I <br /> Printed:Wednesday, 19 March, 2025 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.