Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2402-003 Description:Adding 4 duct runs. <br /> Applied:2/1/2024 Approved: 2/1/2024 Site Address: 708 91ST PL SE <br /> Issued:2/1/2024 Finaled:4/8/2024 City,State Zip Code: EVERETT,WA 98208-3340 <br /> Status: FINALED Applicant: PARAGON HTG/(CONST)HM CRFT SLTNS LLC <br /> Parent Permit: B2210-071 Owner: DEBEB MESFIN&HAILU AZEB <br /> Parent Project: Contractor:PARAGON HTG/(CONST)HM CRFT SLTNS LLC <br /> Details: <br /> ductwork-homeowner was told needed by City of Everett inspector. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/7/2024 2/7/2024 MECH 04-ROUGH JEFF M RHODE APPROVAL see notes <br /> IN <br /> Notes: <br /> 2/6/2024 12:00 PM PARAGON HTG/(CONST)HM CRFT SLTNS LLC <br /> Has to be in morning.H/O works in the afternoon. <br /> Contact Name:PARAGON HTG/(CONST)HM CRFT SLTNS LLC <br /> Site Address:708 91ST PL SE <br /> Phone:4252521807 <br /> e-Mail:info@paragonheating.com <br /> jmr changed Inspection Type from MECH 08-FINAL**to MECH 04-ROUGH IN <br /> -relocated 4 ceiling registers on existing forced air furnace <br /> 4/4/2024 4/4/2024 MECH 08-FINAL** JEFF M RHODE CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 4/3/2024 1:00 PM Mesfin Debeb <br /> Contact Name:Mesfin Debeb <br /> Site Address:708 91ST PL SE <br /> Phone:2068614268 <br /> e-Mail:mesfinberhanu69@yahoo.com <br /> -furnace cannot have direct communication to bedroom irc g2406.2 <br /> 4/5/2024 4/5/2024 MECH 08-FINAL** JEFF M RHODE CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 4/4/2024 10:36 PM Mesfin Debeb <br /> Contact Name:Mesfin Debeb <br /> Site Address:708 91ST PL SE <br /> Phone:2068614268 <br /> e-Mail:mesfinberhanu69@yahoo.com <br /> -corrections not made from previous inspection <br /> I <br /> Printed:Wednesday, 19 March, 2025 1 of 2 rk <br /> SUPERION <br />