My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
708 91ST PL SE 2025-04-09
>
Address Records
>
91ST PL SE
>
708
>
708 91ST PL SE 2025-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:36:14 AM
Creation date
3/19/2025 3:35:22 PM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
708
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Need mechanical permit.Need all sub permit rough in approval prior to framing inspection.New header specified on drawings at kitchen.Existing floor <br /> beam in place but is not continuous over kitchen opening and cantilevers about 32".Fireproof all penetrations. Note all wood in contact with concrete <br /> requires to be p.t. or min 1"off the slab. <br /> 2/7/2024 2/7/2024 BLDG 07-EXTERIOR RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> SHEAR <br /> Notes: <br /> 2/6/2024 11:55 AM Mesfin Debeb <br /> Contact Name:Mesfin Debeb <br /> Site Address:708 91st PL SE, <br /> Phone:2068614268 <br /> e-Mail:mesfinberhanu69@yahoo.com <br /> Previously approved <br /> 2/7/2024 2/7/2024 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/6/2024 11:55 AM Mesfin Debeb <br /> Contact Name:Mesfin Debeb <br /> Site Address:708 91st PL SE, <br /> Phone:2068614268 <br /> e-Mail:mesfinberhanu69@yahoo.com <br /> Please see attached picture regarding floor beam.Floor beam is not continuous and terminates midspan over the new kitchen opening.Proved <br /> engineering or new header spanning full length of the opening. <br /> 2/8/2024 2/8/2024 BLDG 08-FRAMING RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 2/7/2024 1:59 PM Mesfin Debeb <br /> Contact Name:Mesfin Debeb <br /> Site Address:708 91ST PL SE <br /> Phone:2068634268 <br /> e-Mail:mesfinberhanu69@yahoo.com <br /> Waiting on beam to be repaired.All other walls OK. <br /> BLDG 09-FIRE <br /> 2/8/2024 2/8/2024 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL as noted <br /> G <br /> Notes: <br /> Contractor finishing fireproofing in walls at soffit <br /> I <br /> Printed:Wednesday, 10 April, 2024 2 of 4 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.