My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
708 91ST PL SE 2025-08-20
>
Address Records
>
91ST PL SE
>
708
>
708 91ST PL SE 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 3:32:43 PM
Creation date
3/19/2025 3:35:22 PM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
708
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# (O —Oil <br /> BUILDING _ANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone 12--1 <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use _ <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit • Proposed No. of Dwelling Units: <br /> Bldg/TI/Addy m Size) (641 SF/Lot -LJR-- Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size ` Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No nYes Fi /Unfin School Impact Fee: Total $ <br /> Type of Construction 3CLC., Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: DUpdate Existing Chew System 'lot Req'd Park Impact Fee Total$ <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ONew System '1Not Req'd Permit Technicians:Apply Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: • 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes Ea No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add!RCW 64.55 docs required prior to final? DYes J No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ 6b/004:5 Additional Notes: <br /> Approved By:itte R f jy 7 A Date: I I/) t-I 2 Z <br /> PUBLIC WORKS , <br /> Additional Notes: {-t ��Zj�2S/oJ.� Intake OK by: 6 Date:\ [DUI t l 2IZ__ <br /> c=0,331—Yi )34t> Intake Comments: <br /> LO JIY- ca PF.Rl�i•VEr 0�y PW Worksheet Needed if: <br /> pPFCL C_ae L ❑Sys Dev Eval ❑Traffic Mit Eval <br /> Approved By: 'Q N Date: 1142073 ❑Site Work or Drainage Proposed <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate 1 Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder • <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Public Works has no scope---PW Not Required , <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: 4 /11/1 � ` • M• 1'071v <br /> Approved By: Date: Approved By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.