Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/4/2023 12/4/2023 BLDG 08-FRAMING Matt Schreifels PARTIAL <br /> APPROVAL <br /> Notes: <br /> 206-883-9757 <br /> russell@showtimehomerenovations.com <br /> Upper floor framing only.Ok to insulate.Schedule framing inspection for main and lower floor once RFI/memo is received from the structural engineer <br /> on alternate structural connections. <br /> BLDG 09-FIRE PARTIAL <br /> 12/4/2023 12/4/2023 STOPPING/BLOCKIN Matt Schreifels APPROVAL <br /> G <br /> Notes: <br /> Fire Stopping/Blocking approved for upper floor only.Schedule Fire Stopping/Blocking inspection for main and lower floor once framing inspection is <br /> approved. <br /> 12/6/2023 12/6/2023 BLDG 08-FRAMING Matt Schreifels CORRECTION <br /> REQUIRED <br /> Notes: <br /> 425-736-7049 <br /> RUSSELL@SHOWTIMEHOMERENOVATION.COM <br /> Upload revised engineering for beam to beam connection at main floor and reschedule framing inspection.Schedule for fire stopping/blocking <br /> inspection when ready. <br /> 12/7/2023 12/7/2023 BLDG 08-FRAMING Matt Schreifels CORRECTION <br /> REQUIRED <br /> Notes: <br /> 425-736-7049 <br /> RUSSELL@SHOWTIMEHOMERENOVATION.COM <br /> Upload revised engineering to permit portal&have available on site for beam to beam connection at main floor and reschedule framing inspection. <br /> 12/12/2023 12/12/2023 BLDG 08-FRAMING Matt Schreifels PARTIAL <br /> APPROVAL <br /> Notes: <br /> 425-736-7049 <br /> RUSSELL@SHOWTIMEHOMERENOVATION.COM <br /> Received updated engineering.See RFI's in attachments.Excludes exterior decks and/or porches.Schedule framing inspection prior to cover. <br /> 12/12/2023 12/12/2023 BLDG 12- Matt Schreifels APPROVAL <br /> INSULATION <br /> Notes: <br /> 425-736-7049 <br /> RUSSELL@SHOWTIMEHOMERENOVATION.COM <br /> 6/3/2024 6/5/2024 BLDG 16-FINAL Matt Schreifels CORRECTION See Notes <br /> REQUIRED <br /> Notes: <br /> 425-736-7049 <br /> RUSSELL@SHOWTIMEHOMERENOVATION.COM <br /> Public Works permit PW2401-010 has not received final approval.Unable to final building at this time until Public Works permit is resolved/final <br /> approved. <br /> I <br /> Printed:Tuesday,08 October, 2024 4 of 5 rk <br /> SUPERION <br />