Laserfiche WebLink
, ; PROJECT NO. SHEET NO. <br /> .i..\ <br /> � S221116-1XR <br /> i <br /> i <br /> � PROJECT 1101 Grand View Dr, Everett, WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY KJ DATE 12-9-22 <br /> ScopeeObjective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These findings <br /> have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure <br /> above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations based <br /> upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the <br /> structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings. The interior crawl-space support <br /> system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, <br /> adjustable post-base hardware, and/or the addition of taller wood support members. Settlement in these interior support areas shall be <br /> monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous cast-in-place concrete stem wall and concrete strip footings. Below the footings, <br /> piles are to be spaced at a distance no larger than 6'-0"on-center at the locations indicated on the attached Level Survey. In addition, the <br /> existing residence will undergo a remodel. New piles locations will be required under new point load locations per Structural Remodel Plans <br /> provided by BTL Engineering(EOR). Reference the attached Level Survey for coordination of pile locations. Refererence SSK-01 & <br /> SSK-02. <br /> -End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 3'-0". <br /> -A maximum allowable loading of 2,130 plf was utilized in this analysis.This was determined through inspection of building geometry and <br /> conservative span/tributa loadin. assumptions based on standard construction •ractices <br /> The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment <br /> >assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Exterior/Perimeter Piles @ 6'-0"o.c. (Pile#12, 17-20) 11 kip minimum vertical capacity(allowable load) <br /> Exterior/Perimeter Piles @ 6'-0"o.c. (Pile#1-2,4) 13 kip minimum vertical capacity(allowable load) <br /> Exterior/Perimeter Piles @ 6'-0"o.c. (Pile#3, 5-7, 10-11, 13, 21) 9 kip minimum vertical capacity(allowable load) <br /> Interior Piles @ 6'-0"o.c. (Pile#8, 27) ......... 15 kip minimum vertical capacity(allowable load) <br /> Interior Piles @ 6'-0"o.c. (Pile#14, 22) 7 kip minimum vertical capacity(allowable load) <br /> Interior Piles @ 6'-0"o.c. (Pile#9,28, 30)...... 17 kip minimum vertical capacity(allowable load) <br /> Interior Piles @ 6'-0"o.c. (Pile#15-16, 24-25, 29) 14 kip minimum vertical capacity(allowable load) <br /> Interior Piles @ 6'-0"o.c. (Pile#26) 10 kip minimum vertical capacity(allowable load) <br /> . Interior/Exterior Piles @ 6'-0"and 8'-0"o.c. (Pile#1PC-13PC) 20 kip minimum vertical capacity(allowable load) <br /> Note: Refer to the attached General Notes for additional requirements. <br /> Y As determined by R&R, the site appears to have no lateral(horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or <br /> -xpected additional structural analysis will be required. <br /> - t c ra ec•m en.a I•ns co ai e• in is •ac ag- are base. on site p otograp s •a ed 8/ - 28 2, .y 'V. o t e knowe•ge o <br /> L120, a geotechnical investigation was not performed on this site. Consequently, all structural recommendations assume adequate soil <br /> conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by, may conflict with, or otherwise compromise the recommendations <br /> contained within this package, including, but not limited to,water drainage, slope stability,existing structural damage, or existing subsurface <br /> obstructions. In this instance,the structural assumptions, recommendations, and scope for this project will need to be revisited to consider <br /> and address the new findings <br /> L120 ENGINEERING&DESIGN <br /> Refer to the following pages for pile and connection specifications. <br />