Laserfiche WebLink
'i; , <br /> JOB PHOTOS <br /> FOUNDATION <br /> 00 <br /> ` "S' <br /> �y <br /> � E <br /> r4 1/ t <br /> 4 <br /> PI <br /> -... :,mx . , "I'Lt e killi <br /> ft- <br /> • <br /> piles#1-4 will be installed along the West Crew will be install helical piles#5-11 along the North <br /> foundation wall of home to lift and stabilize home. foundation wall of home. Crew will have to remove and <br /> replace concrete in slab for piles#5-9. Crew will <br /> remove and replace existing posts supporting framing <br /> of home and place a 20" composite pad with an <br /> adjustable 4x4 bracket. <br /> Y. <br /> i <br /> !liS <br /> v <br /> Hi' I i IN pHUowl �.. M`"' <br /> /0 <br /> 11 , .,, 2._ <br /> Crew will install piles#12-20 along the East Crew will be installing helical pile#22 along this 6x6 <br /> foundation wall of home crew will have to remove post in basement to help lift interior as crew lifts and <br /> and replace existing posts supporting home. Crew stabilizes foundation. Crew will also be drilling 3/8's <br /> will install pile#21 along the South foundation wall holes into the interior slab to lift and void slab with a <br /> of home. Crew will be removing and replacing polyurethane foam injection. <br /> Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as <br /> building geometry, tributary areas, and loading were determined through examination of these <br /> photographs and industry knowledge of standard construction practices. - L120 <br />