My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1101 GRANDVIEW AVE 2025-08-07
>
Address Records
>
GRANDVIEW AVE
>
1101
>
1101 GRANDVIEW AVE 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 3:48:59 PM
Creation date
3/20/2025 10:07:08 AM
Metadata
Fields
Template:
Address Document
Street Name
GRANDVIEW AVE
Street Number
1101
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NO. SHEET NO. <br /> /41111/4 <br /> ! S221116-1XR <br /> PROJECT 1101 Grand View Dr, Everett, WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY KJ DATE 12-9-22 <br /> LOAD ANALYSIS:IBC 2015-2-STORY <br /> BUILDING <br /> Typical Pile 6'-0"Span(piles 26): \ / <br /> Roof LL(snow ground):25 psf V <br /> Floor LL:40psf L/2 ,' L/2 <br /> Floor/Roof DL:15psf <br /> Wall DL:12psf <br /> Stemwall DL:100 psf(8"wall) <br /> Floor Trib:0.5*24'max span=12' <br /> Typical FIr Ht:10'*2story=20'-0" <br /> Case 2:Uniform Load: <br /> WoL=15psf*(12')+12psf*(20')=0.42k1f <br /> WDLtstemwel0=0.25k1f(2.5ft stem) <br /> Wu_=40psf*(12')=0.48 klf <br /> 2'-2" <br /> Wn=DL+SL+LL= <br /> 0.42k1f+0.48k1f=0.9 klf two stemwslll <br /> 18"+ 8") <br /> 0.42k1f+0.48k1f+0.25k1f=1.15klf(wstemwall) <br /> Case 1:Point Load(6'-0"span): <br /> PDL=0.42krf*6'-0"=2.52 kips Pile and connection requirements per Pile and connection requirements per <br /> PDL(stemwalil=0.25k1f*6'-0"=1.5 kips contractor contractor <br /> PLL=0.48k1f 6'-0"=2.88 kips <br /> Additional PL from FOR plans at post=2.2k <br /> 6'-0" max <br /> PTL two stemma!DL)=0.9k1f*6'-0"=5.4k+2.2k=7.6k <br /> PTL tw stemwan IX)=1.15*6'-0"=6.9k+2.2k=9.1k <br /> Refer to attached calculations for analysis. <br /> NOTES: <br /> 1. Both uniform and point loads analyzed in the following calculations.Uniform loads are <br /> assumed to be standard due to load distribution from bearing walls,however,the additional <br /> point load is conservatively considered here for any major beam supports from above. <br /> 2. Maximum loading on the grade beam was determined by inspection of the building <br /> geometry and through conservative assumptions regarding span lengths and support <br /> wall/foundation. All concrete walls assumed full tributary span of floor and roof members. <br /> Conclusion: <br /> Based on the loading and geometry of the structure we conclude that the foundation <br /> may be stabilized through the use of piles and connections per R&R. These are to be <br /> attached to the stem-wall(grade-beam)at an on-center(o.c.)spacing no greater than <br /> 6'-0", spanning pile-to-pile. <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.