Laserfiche WebLink
10 of 25 <br /> Wednesday, March 23, 2022 <br /> SCOREOF WORK FOUNDATION •SPECIALJST <br /> Crew will install 3" Helical Piles, 3"Stabil-Loc Piers, as well as 4x4 Adjustable Post Bases with Pads, and lift home to maximum <br /> practical recovery. Crew will drive piles to a maximum 25'after there will be a $20 a foot charge per pile. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed <br /> with a maximum pile spacing of 8v'-0"o.c. per the attached SSK-01 &SSK-02. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile <br /> installation provided that no two adjacent spans exceed the spacing limitation of 8'-0"o.c. UNO. <br /> 2. End piles are to be placed within 3'-0"from corner as specified below UNO. <br /> LEVEL SURVEY <br /> 23.5' <br /> r--e <br /> -1 1/4 -1 3/4 -1 1/4 <br /> co . cc) <br /> 8' 1.5' <br /> 1 3/4 -1 3/4 -3/4 -1 1/4 <br /> -3/4 <br /> 1 1/2 =3" Helical Pile <br /> Crac -1 1/2 ¢ =3"Stabil-Loc Pier <br /> -1 3/8" = 4x4 Post Base <br /> » ,. wan Pa <br /> x 0 <br /> -1/2 <br /> 0 2 3/8 <br /> q I -1 3/47* <br /> -1U2 <br /> co <br /> \ <br /> aCra k -Gas <br /> 2 5/+ 1 <br /> L� ATE PILE 4 1 /2 (3)PILES @ <br /> _3 WI HIN •• 0 7' 0"OC MAX <br /> Fib ORNEI i 18 1 / <br /> 7.5' <br /> \ 3YPlLES @ 8'-0"OC MAX <br /> _ 1 . <br /> 6 12 7 <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> interior elements,exterior decks,and deck supporting elements are outside of L120's contract and scope and are not addressed in this package.-L120 <br />