My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MONROE AVE 2025-04-16
>
Address Records
>
MONROE AVE
>
1920
>
1920 MONROE AVE 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 2:35:43 PM
Creation date
3/20/2025 10:47:56 AM
Metadata
Fields
Template:
Address Document
Street Name
MONROE AVE
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet •(FOR PERMIT STAFF ONLY • PERMIT# 3 ZZ 1 ( -/ I <br /> , nnBUILDING , t PLANNING <br /> -�Intake OK by: R�( Date: Intake OK by: Assign To:jeS S i CC,& Date: I‘)17/ZZ <br /> Intake Comments: t Intake Comme t�sZyr-) plvmbrny/mect-Icon al/elec�rtccA t� <br /> Aass ice+. <br /> Zone <br /> Overlay/Agreement 111/F4 <br /> ❑ Route to Commercial Building Nonresidential Use N/A <br /> IFRRoute to Residential Building Residential Use S F iZ <br /> ❑ Make this a"W"Permit Proposed No. of Dwelling Units: Ill/A <br /> ''�1 I/Add em 7'7© Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes,No <br /> Number of Stories ( "In Lieu"Fee:Type: Amount$ <br /> Basement Flo ❑Yes , Fin/Unfin S hool Impact Fee: Total $ <br /> Type of Construction $�-(. Calcula • Credit: <br /> Occupancy Group Tj2-e DEverett Sch Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees fo ermits applied for afte /2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System Not Req'd Park Impact Fee Total$ ue after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calcula' ea : <br /> Fire Alarm: ❑Update Existing ❑New System ENot Req'd Permit Technician U nly:Apply Phase-In C ' Per EMC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100% edit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes No 0 0%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes g\lo 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ 50j0 Additional Notes:v1O add i+:oa1 aA vnt+s +•-:c3ger:<1q 'es- <br /> Approved By:/`` Date: II/17/ZZ- <br /> f <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> ❑Sys Dev Eval(Util/Sw) ❑Traffic Mit Eval <br /> Approved By: e }Q Date: tA/V;r/ zin4c ❑Site Work/Drainage ❑Address Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑ This Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑ A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.