My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1213 HOYT AVE 2025-04-17
>
Address Records
>
HOYT AVE
>
1213
>
1213 HOYT AVE 2025-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 4:12:13 PM
Creation date
3/20/2025 11:13:31 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1213
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J O 12ol`y <br /> Thursday, September 29, 20224- -10 <br /> SCOPE OF WORK FOUNDATION SPECIALIST <br /> 00 <br /> 4 <br /> Crew will install 3" Helical Piles, 3" Stabil-Loc Piers, 4x6 Post with Concrete Footing, as well as 6x6 Adjustable Post Base with <br /> Composite Pad, and may lift a little but mainly wants to stabilize except front porch. Crew will drive piles to a maximum 25'after <br /> there will be a $20 a foot charge per pile. Whomever represents home will need be onsite for crew arrival and or job completion. <br /> Homeowner to pay 25% deposit, then 25% 1 month before project starts, &50% due upon job completion. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and piles are installed <br /> with a maximum pile spacing of 6'-0"o.c. per the attached SSK-01 & SSK-04. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile <br /> installation provided that no two adjacent spans exceed the spacing limitation of 6'-0"o.c. UNO. <br /> 2. End piles are to be placed within 3'-0"from corner as specified below UNO. <br /> EVEN/ATI n NI M A P <br /> 26' <br /> 1 -1/2 -7/8 <br /> Basemen <br /> -1/2 Slab ei_7/8 <br /> -1 1/4 -1/2•' <br /> -1/2 1 ■i 1 3/4 ® = Existing Post <br /> . caw <br /> -t - = 3" Helical Pile <br /> CP <br /> 1/4 �1 3/4 00 , . }- = 3" Stabil-Loc Pier <br /> ►.;6, cn <br /> 1 I 1/2 = 6x6 Post Base <br /> -1 with Pa <br /> X Ni. - 0 = New 4x6 Post with <br /> LOCATE PILE ' 7/8 <br /> 8' \ Concrete Footing <br /> pas— -2 BETWEEN <br /> EXISTING —6'-0"OC MAX <br /> 0 2 SUPPORTS 2 ,.► 7/8 <br /> zo - 5/: <br /> © .wl Space <br /> LOCATE ES • 13 N <br /> J -2 7/8 WITHIN 2 "OF ' - LOCATE PILE UNDER <br /> a. 3/ CHIMNE IDES CHIMNEY FTG AT <br /> S CHIMNEY/STRIP FTG <br /> CORNER <br /> 4. <br /> -4 3/8 0 -5 in <br /> S r LOCATE PILE <br /> CENTER PILE CENTER PIL: ON <br /> �, ' WITHIN 1'-0" <br /> j BETWEEN cO EXISTING P I STS • •` FROM CORNER <br /> CORNER 1/8 . 5/8 c 7/: LOCATE PILE <br /> i WITHIN 3'-0" <br /> 6 0' 8 FROM CORNER <br /> NOTE: L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> interior elements,exterior decks,and deck supporting elements are outside of L120's contract and scope and are not addressed in this package.-L120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.