Laserfiche WebLink
Hi Tad . Question with the pervious surface.We are removing a 18x20 garage andi's being replaced by the 22x20 adu <br /> so would that eliminate the storm water report need?There will only be 80sq ft of new impervious surface . <br /> Caleb Widen <br /> 4253749409 <br /> On Mar 20, 2023,at 12:30 PM,Thad Newport<TNewport@everettwa.gov>wrote: <br /> Hello, <br /> I am doing the Public Works reviewer for your building permit B2302-115, DADU-New Construction. It <br /> appears that this project is adding more than 200SF(440 SF)of new impervious surface area and <br /> requires you to prepare a drainage report using the Small Project Stormwater Report Template for <br /> Combined Area (PDF). Please complete all 5 steps of the linked form and email it back to me to continue <br /> the review process.A revised site plan may also be required depending on the stormwater management <br /> triggered from the report. If you have any questions please feel free to call or email me. <br /> <image002.png> <br /> Thad Newport <br /> Associate Engineer I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> 2 <br />