CALEB WIDEN <br /> 2310 VIRGINIA AVE <br /> B2302-115 <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations (if applicable). <br /> d. One copy of the geotechnical report (if applicable). <br /> Submittal documents should contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted building codes. Upon submittal of the revised documents, your <br /> application will be given priority and the review will recommence. <br /> General: <br /> 1. Thank you for addressing most of the comments from last round! We appreciate your effort! <br /> Architectural (Reviewer: Yin Lu) <br /> 1. In response letter you mentioned "The CO alarms have been addressed regarding <br /> interconnected and hard wired with battery back up on each floor, PG 10 Framing floor <br /> plans"— Firstly, there is no Framing floor plans on Page 10. Please correct the note. <br /> Secondly, I noticed you marked up CO alarm on your ground level floor plan on Page 4. <br /> However, Level 2 bedroom CO alarm is missing. Please add accordingly. <br /> 2. R-21 is required for wall assembly like you noted on Page 7, however, there is no wall <br /> assembly schedule showing that the wall is 2x6 stud wall. R-21 is about 5 1/2"thick and will <br /> not fit in a 2x4 stud wall. If you are using some special insulation material, please be <br /> specific. If not, please add note showing that wall is 2x6 stud at least, with vapor barrier <br /> and 1/2" GWB min at interior side. Schedule of wall assembly is encouraged but not <br /> necessary if text note can explain. I believe you know what you are doing, but our inspector <br /> needs a confirmed and written text to do inspection. <br /> 3. No additional action. <br /> 4. Vented attic area is 440sf (20'x22'), so 2.93 sf (equals to 421.9 square inches). I assumed <br /> the gable means the attic windows showing on the elevations, which is 12"x16". However, <br /> there is no roof jacks showing on any of the drawings. Eaves vent equals to 100 square <br /> inches plus the attic window, it is not adequate to meet the ventilation area requirement. <br /> Could you please clarify your ventilation calculation? <br /> 5. You would like to claim Heating Option number 2 which is available for an initial heating <br /> system using a heat pump that meets federal standards for the equipment listed in Table <br /> C403.3.2(1)C or C403.3.2(2) or air to water heat pump units that are configured to provide <br /> both heating and cooling and are rated in accordance with AHRI 550/590. This is <br /> commercial grade heat pump, if this is the design intent, please provide specification of this <br /> heat pump. <br /> 3200 Cedar Street © 425.257.8810 O permitservices@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 2 of 4 <br />