Laserfiche WebLink
Hi Thad . Question with the pervious surface. We are removing a 18x20 garage and it's being replaced by <br /> the 22x20 adu so would that eliminate the storm water report need?There will only be 80sq ft of new <br /> impervious surface . <br /> Caleb Widen <br /> 4253749409 <br /> On Mar 20, 2023, at 12:30 PM,Thad Newport<TNewport@ eve rettwa.gov>wrote: <br /> Hello, <br /> I am doing the Public Works reviewer for your building permit B2302-115, DADU-New <br /> Construction. It appears that this project is adding more than 200SF (440 SF)of new <br /> impervious surface area and requires you to prepare a drainage report using the Small <br /> Project Stormwater Report Template for Combined Area (PDF). Please complete all 5 <br /> steps of the linked form and email it back to me to continue the review process. A <br /> revised site plan may also be required depending on the stormwater management <br /> triggered from the report. If you have any questions please feel free to call or email me. <br /> <image002.png> <br /> Thad Newport <br /> Associate Engineer I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2 d Floor, Everett, WA 98201 <br /> Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to <br /> disclosure pursuant to the Public Records Act. <br />