Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2401-006 Description: New construction ADU <br /> Applied: 1/4/2024 Approved: 1/11/2024 Site Address: 2310 VIRGINIA AVE <br /> Issued: 1/12/2024 Finaled:4/4/2024 City,State Zip Code: EVERETT,WA 98201-3127 <br /> Status: FINALED Applicant:Widen Construction LLC <br /> Parent Permit: B2302-115 Owner:Caleb M Widen <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 1/19/2024 1/19/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> CALEB WIDEN cmwiden@yahoo.com <br /> -Multiple code corrections,list is not exhaustive:-Vents that offset below flood rim must have approved drainage fittings per chap 9 UPC.-Cannot tie <br /> vents for separate fixture together below flood rim per chap 9.-Non code low heel San tee used on its back for lav tie in.Cannot tie a waste outlet into <br /> closet bend.Per chap 3 and 7 UPC.-Must use approved drainage fittings for tailpiece offset on tub. Per chap 7.-Missing nail plates per chap 3.-No test <br /> on waste system.-Cold water line is undersized to bathroom per chap 6.-Install code approved end of line cleanout and kitchen sink cleanout as well as <br /> end of line clean out for AW drain. <br /> 1/26/2024 1/26/2024 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> CALEB WIDEN cmwiden@yahoo.com <br /> -Leak on upstairs lav and kitchen vent tie in.Vent tie in is also back-graded and connections are stressed.UPC chap 3 and 9.-Use approved glue on ABS <br /> per UPC 705.1.2-Leak on tub waste and overflow at shoe connection to bottom of tub.-Kitchen sink vent must be have drainage fittings as it offsets less <br /> than 6"above fixture flood rim per UPC chap 9-Use approved wye fitting for end of line clean-out in crawlspace.Must have 30"of horizontal clearance <br /> in front of plug and 18"of vertical clearance to floor.Per UPC chap7-Missing nail plates on DWV and water piping.UPC chap 3-Use 1/2"by 1/2"by 3/4" <br /> pex tee fitting to bring 3/4"cold water supply all they way to 1/2"intersection per UPC chap 6. <br /> 1/29/2024 T1/29/2024 PLUMB 03-ROUGH JASON APPROVAL see notes <br /> IN MORRISSEY <br /> Notes: <br /> CALEB WIDEN cmwiden@yahoo.com <br /> Rough DWV and water piping ok. <br /> Rough DWV and water piping ok. <br /> 4/2/2024 4/2/2024 PLUMB 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> CALEB WIDEN cmwiden@yahoo.com <br /> -Install seismic straps on water heater per UPC chap 6.-Install 90 on termination for water heater relief and water heater condensate.-Clamp <br /> condensate tube for water heater and shorten tube to establish grade.-Caulk all upstairs bath fixtures to adjoining surfaces,shower trim and toilet. <br /> I <br /> Printed: Friday, 21 March,2025 1 of 2 rk <br /> SUPERION <br />