Laserfiche WebLink
10 of 30 <br /> Wednesday, November 30, 2022 <br /> SCOPE OF WORK FOUNDATION <br /> SPECUUJST <br /> I <br /> Crew will install 3" Helical Piles, as well as 3" Concentric Piers, and lift home to maximum practical recovery. Crew will drive <br /> piles to a maximum 25'after there will be a $20 a foot charge per pile. Crew will remove and replace concrete. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a maximum pile <br /> spacing of 6'-0"o.c.and 8'-0"o.c.as noted on the level survey,is achieved. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile installation <br /> provided that no two adjacent spans exceed the spacing limitation of 6'-0"o.c and 8'-0"o.c.. <br /> 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance of 3'-0"as marked. <br /> 3. Helical pile caps will be placed on helical piles 3 and 4. <br /> LEVEL SURVEY <br /> 3' 12' <br /> 3, 0 -1 <br /> 0 <br /> 3' <br /> -1/4 <br /> 13' 1R = Existing Post <br /> = 3" Helical Pile <br /> = 3" Concentric Pier <br /> ❑ = Polyurethane Lift <br /> -5/8 -7/8 -7/8 <br /> LOCATE PILES -518 <br /> UNDER -1 3,8 <br /> 8 <br /> EXISTING <br /> En POST• . 10 \ <br /> CO 1 w <br /> -3/4 N <br /> LONE -1 3/4 <br /> HEk AL PILE ewer0 <br /> PS UNDER L 1 '1/2 ac _; 9 <br /> EXISTING t 3 iN <br /> cj POST -1 1/2 <br /> 1} �4 <br /> b • i'-1 4 PILES 6'-0"O.C.MAX <br /> LOCATE PILE WITHIN 2F�MAX OF ( ) �° <br /> cO CORNER --`8 <br /> Cd1 LOCATE PILE <br /> rack WITHIN 4FT MAX Y <br /> wOF CORNER e LOCATE PILE WITHIN <br /> a - 2-1 2 3 1FT MAX OF <br /> ry - U _ -2 1/4 _• U `3 5/8 ��� CORNER <br /> 28' 5 <br /> (4)PILES @ 6-0"O.C.MAX <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> exterior decks and deck supporting elements are outside of L120's contract and scope and are not addressed in this package. -L120 <br />