My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 EDGEMOOR LN 2025-04-25
>
Address Records
>
EDGEMOOR LN
>
1605
>
1605 EDGEMOOR LN 2025-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2025 3:15:49 PM
Creation date
3/21/2025 9:56:04 AM
Metadata
Fields
Template:
Address Document
Street Name
EDGEMOOR LN
Street Number
1605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> 4 Kmzan&Associates, lnc. Field <br /> Geotechnical Engineering.Environmental Engineering Report NO.:09622267DFRO20924DK <br /> Construction Testing and Inspection <br /> DATE: 03/29/2024 Set Count: CONTRACTOR: Hinz-Yeager <br /> PROJECT#: 09622267 PERMIT#: <br /> PROJECT: Devon Yeager INSPECTOR: Don Keller <br /> LOCATION: 1605 Edgemoor Lane JURISDICTION• Everett <br /> KA P.M.: WEATHER: TEMP: <br /> Arrived on site @ 1:30 for scheduled 2:00 inspection.Met with contractor and reviewed approved plans. <br /> Inspected the size,spacing,and placement of ASTM A615 GR60 reinforcing steel and Simpson HDU CBSQ post base <br /> for Exterior Isolated Pilasters and ftgs.for 6' deck. 1/SC4,4/SC6,GSN, SC2.Rev. 2;26/24. <br /> Verified mix#Standard P 3500 psi concrete provided by Green Dot Concrete.Observed the placement of(1.5)cubic <br /> yards of concrete for areas stated above. Concrete placed continuously,within 90 minutes of batch time,and with no <br /> interruptions greater than 1 hour.Concrete discharged into and conveyed with wheelbarrow and placed manually.Concrete <br /> placed monolithically and mechanically consolidated at time of placement.HDU CBSQ post base set while concrete was in a <br /> plastic state and forms tapped for additional consolidation. <br /> Cast 1 set of(5)4x8 concrete specimens @2:15,mix 72,air 48,slump 4". <br /> Reviewed By: ASTM Test#: Asset Numbers <br /> ):T <br /> To the best 6f my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519•Poulsbo(360)598-2126•Tacoma(253)939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Kra tan&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by other;on site.The test results apply only to the specific locations,and items inspected or tested.Template date 12/8/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.