Laserfiche WebLink
Page 1 of 1 <br /> 4 Kmzan&Associates, lnc. Field <br /> Geotechnical Engineering.Environmental Engineering Report NO.:09622267DFRO20924DK <br /> Construction Testing and Inspection <br /> DATE: 03/29/2024 Set Count: CONTRACTOR: Hinz-Yeager <br /> PROJECT#: 09622267 PERMIT#: <br /> PROJECT: Devon Yeager INSPECTOR: Don Keller <br /> LOCATION: 1605 Edgemoor Lane JURISDICTION• Everett <br /> KA P.M.: WEATHER: TEMP: <br /> Arrived on site @ 1:30 for scheduled 2:00 inspection.Met with contractor and reviewed approved plans. <br /> Inspected the size,spacing,and placement of ASTM A615 GR60 reinforcing steel and Simpson HDU CBSQ post base <br /> for Exterior Isolated Pilasters and ftgs.for 6' deck. 1/SC4,4/SC6,GSN, SC2.Rev. 2;26/24. <br /> Verified mix#Standard P 3500 psi concrete provided by Green Dot Concrete.Observed the placement of(1.5)cubic <br /> yards of concrete for areas stated above. Concrete placed continuously,within 90 minutes of batch time,and with no <br /> interruptions greater than 1 hour.Concrete discharged into and conveyed with wheelbarrow and placed manually.Concrete <br /> placed monolithically and mechanically consolidated at time of placement.HDU CBSQ post base set while concrete was in a <br /> plastic state and forms tapped for additional consolidation. <br /> Cast 1 set of(5)4x8 concrete specimens @2:15,mix 72,air 48,slump 4". <br /> Reviewed By: ASTM Test#: Asset Numbers <br /> ):T <br /> To the best 6f my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519•Poulsbo(360)598-2126•Tacoma(253)939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Kra tan&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by other;on site.The test results apply only to the specific locations,and items inspected or tested.Template date 12/8/2023 <br />