My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD TERRA POWER 2025-08-20
>
Address Records
>
SEAWAY BLVD
>
3301
>
TERRA POWER
>
3301 SEAWAY BLVD TERRA POWER 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 7:09:45 AM
Creation date
3/21/2025 12:02:54 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
TERRA POWER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
670
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 10/27/2022 10/27/2022 BLDG 16-FINAL KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 10/26/2022 10:51 AM Sebastian Hajmiragha <br /> Contact Name:Sebastian Hajmiragha <br /> Site Address:3301 SEAWAY BLVD BLDG B <br /> Phone:2064238135 <br /> e-Mail:sebastianh@pattisongc.com <br /> Obtain final on electrical permit under fire alarm. <br /> Reschedule for building final when ready. <br /> Note:request for final does not include warehouse.See note on electrical permit regarding use of temporary power. <br /> 10/28/2022 10/28/2022 TEMP CERTIFICATE KURT KECK APPROVAL TCO 30 days <br /> OF OCCUPANCY <br /> Notes: <br /> 10/27/2022 8:03 AM Sebastian Hajmiragha <br /> Contact Name:Sebastian Hajmiragha <br /> Site Address:3301 SEAWAY BLVD BLDG B <br /> Phone:2064238135 <br /> e-Mail:sebastianh@pattisongc.com <br /> TCO 30 days <br /> 2/2/2023 2/2/2023 TEMP CERTIFICATE KURT KECK APPROVAL 60 days <br /> OF OCCUPANCY <br /> Notes: <br /> Contractor requested extention due to unavailability of parts and shipping delays <br /> TCO additional 60 days <br /> 3/31/2023 3/31/2023 TEMP CERTIFICATE RAKEEB KHAN APPROVAL 60 days <br /> OF OCCUPANCY <br /> Notes: <br /> Contractor requested extention due to unavailability of parts and shipping delays <br /> TCO additional 60 days <br /> 5/30/2023 5/30/2023 TEMP CERTIFICATE RAKEEB KHAN APPROVAL 90 days <br /> OF OCCUPANCY <br /> Notes: <br /> Contractor requested extention due to unavailability of parts and shipping delays <br /> TCO additional 90 days <br /> 9/12/2023 9/12/2023 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT As noted <br /> FINAL <br /> Notes: <br /> BRENT <br /> 206-850-5876 <br /> BRENTE@ADDISONGC.COM <br /> Previous final corrections from 10/27/2022 made. Note did not perform final inspection. <br /> I <br /> Printed: Monday, 18 March, 2024 3 of 4 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.