Laserfiche WebLink
�q w <br /> ENVELOPE COMPLIANCE SUMMARY 1p r <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Pe OP •. stered by:©2022 NEEA,All rights reserved <br /> Project Title TerraPower-TI-2018 WSEC For Building Departtrifa e: Date: Apr 12,2022 <br /> Project Address Seaway West Bld B,3301 Seaway BLVD ,( SQL V �v Lj <br /> Project&Applicant Everett,WA 98203 • /Ces ,�i, <br /> Information Applicant Name Randy Brown <br /> Applicant Phone 206-228-8000 <br /> Applicant Email Randy.Brown@synthesispllc.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Warehouse,General Storage Building Cond.Floor Area 7,210 <br /> Project Cond.Floor Area 2,744 <br /> Project Scope Change in Space Conditioning(Semi-heated converted to Fully Conditioned) Space Conditioning Categories Fully Conditioned Floors Above Grade 1 <br /> Compliance Method Compliance Method 1-General • <br /> Envelope Project Description Tenant Improvement-Office Space in an existing Industrial Tilt Up shell Building <br /> Envelope Scope Space Conditioning Category Compliance Method WVVR/SRR UA Calculation Adjustment Fenestration Alternates Compliance Verification <br /> Compliance per Category <br /> Scope and Change in Space ConditioningFullyConditioned Componentperformance 25.85%/0% Change of space conditioning allowance No alternates selected COMPLIES <br /> Method g p p (UA 10%higher than WSEC target) <br /> Air Barrier Testing I Air barrier testing included in project scope Air Barrier Comments <br /> Project Title TerraPower-TI-2018 WSEC Date Apt 12,2022 <br /> Scope&Space Conditioning CHANGE IN SPACE CONDITIONING-FULLY CONDITIONED Compliance Verification COMPLIES <br /> Window-to-wall Ratio 25.85% Skylight-to-roof-ratio I 0% Vertical Fenestration Alternate No alternates selected <br /> Opaque Envelope Assemblies <br /> Insulation R-Values <br /> Roof/Ceiling Location in Documents Assembly ID Assembly Location Cavity o Continuous 2nd Layer U-Factor Net Area(SF) <br /> (%penetration) (MB Roof) <br /> Attic and other A2.1&A3.2 Suspended Insulation grid Exterior R-0 R-30(<0.04%) U-0.032 2,648 <br /> U-Factor Source:WSEC Appendix A U-Factor Source Description:Table 102.1 <br /> Roof Framing Type(Standard,Advanced):Advanced Roof Framing Material:Other material • <br /> Ceiling/Attic Venting:Vented Is this assembly exterior or interior?:Exterior <br /> Is assembly new,upgraded or unaltered existing?:New assembly <br /> Walls Location in Documents Assembly ID Assembly Location Cavity Continuous Insulated Wall U-Factor Net Area(SF) <br /> (%penetration) Furring <br /> Steel-framed-Commercial A2.1&A3.2 warehouse wall 6"metal stud wall-upto 16ft Interior partition R-21 R-5(<0.04%) U-0.069 1,344 <br /> U-Factor Source: U-Factor Source Description:Table A103.3.6.1(1) <br /> Framing Depth:2x6 Framing Spacing:16"o.c <br /> Is this assembly exterior or interior?:Interior partition Is assembly new,upgraded or unaltered existing?:New assembly <br /> Steel-framed-Commercial A2.1 I Existing demising wall I Interior partition R-21 I R-0(<0.04%) I I U-0.106 I 515 <br /> U-Factor Source:WSEC Appendix A U-Factor Source Description:Table A103.3.6.1(1) <br /> Framing Depth:2x8 Framing Spacing:16"o.c. <br /> Is this assembly exterior or interior?:Interior partition Is assembly new,upgraded or unaltered existing?:Upgraded existing assembly <br /> Mass(precast concrete)-Commercial A2.1&A3.2 I upto 12'-6"-(3.5"metal furring @ 24"O.C) I Yes R-21 I R-0(<0.04%) I Yes I U-0.090 I 1,232 <br /> Does assembly include wall furring?:Yes Wall Furring Material:Steel-frame <br /> Framing Depth:2x4 Framing Spacing:24"o.c. <br /> v\ a <br />