Laserfiche WebLink
DAILY FIELD REPORT Inspection <br /> Date <br /> r AAR TESTING AND INSPECTION, INC. 11/22/2024 <br /> Report <br /> 7126 180th Ave NE, Suite C101, Redmond, WA 98052 1 425-881-5812 Number <br /> JAH112224B <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Dillan Dean Project No. 24-736 <br /> Company Toyota Lift Northwest Project Name Fast Signs (PO#2181380) <br /> Address Address 5900 36th Ave S <br /> City City Everett <br /> Contractor Permit No. B2410-024 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> Proprietary Anchors- Mechanical Pallet racks on GL D/3-6 <br /> Weather Temperature (OF) Start Time End Time <br /> Rainy 46 08:30 AM 11:30 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> Project drawings sheet SED 1 of 1 and ESR Report 3037. <br /> INSPECTION OBSERVATION / REMARKS <br /> As requested, I was on site to inspect the installation of the 1/2"x5 1/2"Simpson Strong Bolt 2 wedge anchors into existing concrete at the <br /> above noted locations for the pallet racks on GL D/3-6. When on site, I reviewed the project drawings sheet SED 1 of 1 and ESR Report 3037. <br /> I verified that the approved anchors were installed to the required embedment depth of 3 1/4"inches. <br /> I used a calibrated torque wrench to verify tightening torque on the anchor nuts and found that the nuts were tightened to at least 60 foot <br /> pounds. <br /> Work was performed per ESR Report 3037, manufacturer's directions and the project plans. <br /> Items inspected are in conformance with approved plans,specifications,and jurisdictional requirements <br /> Inspectors Inspectors Name Report Date Reviewers Reviewed By Reviewed Date <br /> SignatureJames Huggins 11/22/2024 Signature Teajalam (TJ) 11/26/2024 <br /> Gounden <br /> 68A2540D-105B-41DF-A000-9AFF3B421006 <br />