My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 BAKER AVE 2025-04-07
>
Address Records
>
BAKER AVE
>
2022
>
2022 BAKER AVE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 9:34:08 AM
Creation date
3/24/2025 9:10:57 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2022
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2410-010 Description: Exp Permit-C0411-007 Convert Back Porch to Bathroom <br /> Applied: 10/5/2024 Approved: 10/21/2024 Site Address: 2022 BAKER AVE <br /> Issued: 10/22/2024 Finaled: 12/24/2024 City,State Zip Code: EVERETT,WA 98201-2510 <br /> Status: FINALED Applicant: Megan Wilaby <br /> Parent Permit: Owner: Megan Wilaby <br /> Parent Project: Contractor: EVOLUTION PROPERTIES LLC <br /> Details: <br /> Jan 2005-All Rough and Finish Is Final C0411-007 Except for the FINAL building <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 11/22/2024 11/26/2024 BLDG 16-FINAL RAKEEB KHAN VIOLATION eTRAKiT Inspection Request <br /> Notes: <br /> 11/18/2024 5:43 PM Megan Wilaby <br /> Final Building Inspection for bathroom add <br /> Contact Name:Megan Wilaby <br /> Site Address:2022 BAKER AVE <br /> Phone:2065500671 <br /> e-Mail:meganjenniferwilaby@gmail.com <br /> Need all final approvals on sub permits. <br /> Attic has been converted to habitable space.Structure appears to be compromised.Additional load has been added to the rafters and ceiling joist. <br /> Attic has been converted to habitable space.Structure appears to be compromised.Additional load has been added to the rafters and ceiling joist. <br /> 12/9/2024 12/9/2024 CONSULTATION BLDG 01- RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> Notes: <br /> 12/6/2024 9:20 AM Megan Wilaby <br /> Remove Drywall&sub floor from attic <br /> Contact Name:Megan Wilaby <br /> Site Address:2022 BAKER AVE <br /> Phone:2065500671 <br /> e-Mail:meganjenniferwilaby@gmail.com <br /> Attic exposed.Removed additional drywall and furred out knee walls.Appears collar ties were not present/removed and appears existing framing is <br /> present.Some existing knee walls were replaced with new walls. Recommend removing insulation in rafter space as no ventilation is provided and place <br /> insulation on top of ceiling. <br /> 12/24/2024 12/24/2024 BLDG 12- RAKEEB KHAN APPROVAL <br /> INSULATION <br /> Notes: <br /> Attic insulation only. <br /> I <br /> Printed:Thursday,02 January, 2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.