My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007 VIRGINIA AVE 2025-04-09
>
Address Records
>
VIRGINIA AVE
>
2007
>
2007 VIRGINIA AVE 2025-04-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:01:30 AM
Creation date
3/24/2025 10:49:59 AM
Metadata
Fields
Template:
Address Document
Street Name
VIRGINIA AVE
Street Number
2007
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2408-013 Description: Kitchen remodel and interior non-bearing wall demo <br /> Applied:8/7/2024 Approved:9/6/2024 Site Address: 2007 VIRGINIA AVE <br /> Issued:9/9/2024 Finaled: City,State Zip Code: EVERETT,WA 98201-2444 <br /> Status: PERMIT ISSUED-ONLINE Applicant:Alexzander B Sibuma <br /> Parent Permit: Owner:Alexzander B Sibuma <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 9/20/2024 9/20/2024 BLDG 01 Matt Schreifels OTHER See Notes <br /> CONSULTATION <br /> Notes: <br /> Building inspector was scheduled for a BUILDING FINAL inspection on 9/20/24 and arrived on site at approximately 9:30am after researching the current <br /> status of the permits and inspection. Building Inspector meet with the contact on site and informed him that the project is not ready for a FINAL <br /> inspection at this time. He was informed of the status of each issued permit and that they need to obtain a mechanical permit for the exhaust venting <br /> as stated in the Plumbing Rough in correction notes from the inspection on 7/30/24. <br /> They were advised of the sequence and requirements of the permits and inspections to proceed forward... <br /> 1.Obtain Mechanical permit <br /> 2.Uncover/expose all areas of work that have been covered without inspections <br /> 3.Schedule for rough in inspections for Electrical,Mechanical&Plumbing permits <br /> 4.Once Rough in approvals have been received for all sub-permits(DO NOT COVER ANY WORK AT THIS TIME)schedule for Building inspections as <br /> follows... <br /> 4.1)Framing inspection <br /> 4.2)Fire Stopping/Blocking inspection <br /> 4.3)Insulation inspection <br /> 4.4)Drywall Nailing inspection <br /> 5.Once Drywall nailing inspection is approved inspections will move back to the Sub-permits(Mechanical,Electrical and Plumbing)for you to schedule <br /> for final inspections <br /> 6.After all of the Sub-permits have received FINAL approvals schedule for BUILDING FINAL INSPECTION. <br /> 9/20/2024 9/20/2024 BLDG 16-FINAL Matt Schreifels NOT READY See Notes <br /> Notes: <br /> 9/18/2024 8:31 PM Alexzander Sibuma <br /> Contact Name:Alexzander Bibeau Sibuma <br /> Site Address:2007 Virginia Ave <br /> Phone:2069307256 <br /> e-Mail:besibuma@hotmail.com <br /> Not ready for FINAL inspections <br /> Requirements to proceed forward on permit... <br /> -Obtain Mechanical permit for exhaust fan. <br /> -Plumbing permit has CORRECTIONS REQUIRED for the rough in inspection that need to be addressed and rescheduled for Rough-In inspection prior to <br /> moving forward. <br /> -Electrical permit has been issued but no inspections have been scheduled as of 9/20/24. <br /> See CONSULTAION inspection results and notes on 9/20/24 for additional info. <br /> I <br /> Printed:Wednesday, 27 November, 2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.