Laserfiche WebLink
8" BRACKET ARM VERTICAL <br /> CONDUIT STUB UP, SEE LIGHTING FIXTURE <br /> FINISH GRADE OR (AS SAFETY PERMITS) <br /> • SONO-TUBE SCHEDULE, TYR TOP OF PAVING <br /> ° CONCRETE FORM <br /> WARNING TAPE <br /> • 0 • O N <br /> ANCHOR BOLT CIRCLE, z <br /> COOED WITH POLE <br /> • FOR BOLT, TYR COMPACT <br /> FIXTURES SHOWN FOR REFERENCE N EARTH <br /> ONLY. REFER TO SITE PLAN FOR BACKFILL <br /> PLAN QUANTITY AND ORIENTATION <br /> z SCH 80 PVC <br /> EXISTING LIGHT POLE�\ CONDUIT v <br /> ,. <br /> & BASE PLATE, SEE/ L ' 3 <br /> 1/2" Cu DRAIN TUBE 3" CLR SAND <br /> I I _ 2 <br /> I NON-SHRINK GROUT � AS RED BEDDING <br /> 4" PROJECTION BETWEEN BASE PLATE <br /> AND FOUNDATION <br /> " HAMFER A-A SQUARE CONCRETE POLE <br /> II II 3" MIN. COVER A-A TRENCH SECTION <br /> II II SCALE: NTS E506-3 <br /> II I I PROVIDE ANCHOR BOLTS FIELD <br /> II VERIFY SIZE, COORD WITH STRUCT <br /> UNDISTURBED EARTH, TYP N <br /> NDHOLE W/ COVER. 120 VAC <br /> o z <br /> N 1-1/4" RCS CONDUIT •BASE COVER <br /> z <br /> R1 <br /> PE <br /> R1-1 <br /> 40 PVC CONDUIT, SEE DETAIL C1 <br /> SEE PLAN <br /> S TO PVC COUPLING <br /> AREA ILLUMINATION ASSEMBLY SPARE <br /> #3 TIES 12" O.C. D ETAI L CKT #1 —020° h�i TO BLDG 40-58 EAST CANOPY LIGHTS <br /> SCALE: NTS `J CKT #3 200 TO BLDG 40-58 EAST CANOPY LIGHTS <br /> #6 x 8'-0" CKT #5 �200 ��TO BLDG 40-58 EAST CANOPY LIGHTS <br /> IN-LINE TRON FUSES IN <br /> BUSSMA 'IRON"" WEATHERPROOF 20 CKT #7 0TO BLDG 40-58 EAST CANOPY LIGHTS <br /> BU <br /> FUSE HOL ERS #HEB-AD WITH <br /> #KTK FU S (SIZE AS REQUIRED). 2%6" GASKETED HANDHOLE CKT #9 �200--����TO BLDG 40-58 EAST CANOPY LIGHTS LIGHT STANDARD LIGHT STANDARD <br /> FUSE A RE SEPARATELY CKT #II TO BLDG 40-58 EAST CANOPY LIGHTS TENON MOUNT TENON MOUNT <br /> ROUND STEEL POLE 20 <br /> 1" OMINAL I SCALE: NTS E506-3 SCALE: NTS E506-3 <br /> N -SHRINK GROUT MFR SUPPLIED ANCHOR CKT #13 TO BLDG 40-58 EAST CANOPY LIGHTS <br /> 24 4SED <br /> OLTS- LOCATE PER MFR 20 I <br /> CHA PER1�0PECIFICATIONS CKT #15�' I i I TO BLDG 40-58 EAST CANOPY LIGHTS <br /> ED S 1 <br /> ELEVATION PLATE BOLT CIRCLE CKT #17�20o--r� TO BLDG 40-58 EAST CANOPY LIGHTS <br /> I I C <br /> CKT 2 o I TO COURTYARD PEDESTRIAN POLE LIGHTSNOTE: COORDINATE POLE BASE DEPTH AND GRADE # 20REINFORCING WITH STRUCTURAL ENGINEERBASED ACTUAL SOIL CONDITIONS. CKT #4 o I TO COURTYARD TREE GRATE UPLIGHTS <br /> T 20DE AL w SPARE <br /> SCALE: NTSfill L <br /> M CD �m CONTACTOR G, CONSTRUCTION NOTES <br /> PRECAST POLYMER GONG �= LIGHTING CONTROL PANEL <br /> C WEATHERPROOF GFI BOX WITH HINGED COVER - 3 [j::�, PROVIDE STEEL BULLHORN TENON MOUNTING BRACKET <br /> CONDUI DUPLEX RECEPTACLE LABEL "ELECTRIC" �� T, SIZED <br /> (6) #6 REBAR !-- LCP—CYO 6 (MODEL#: LITHONIA LIGHTING SMACBT 14/8T RNDX <br /> W/ IN-USE COVER EQUALLY SPACED AS NOTED > SCALE: NTS E50`6-3 DDBXD OR EQUIVALENT) ON POLE. CONTRACTOR TO <br /> MEASURE POLE DIAMETER AT POINT WHERE HEIGHT OF <br /> �� FLOOD LIGHT IS AT 30' AFF AND RETURN TO BOEING <br /> III - -1 #4 REBAR SPIRAL — AUGER HOLE, POUR ELECTRICAL ENGINEER TO FINALIZE MOUNTING BRACKET <br /> GRS �' = 6" PITCH CONCRETE AGAINST ORDER. <br /> CONDUIT- o' UNDISTURBED SOIL <br /> STUB-UP PROVIDE STEEL BULLHORN TENON MOUNTING BRACKET <br /> (MODEL #: LITHONIA BS28 TXX TD20 DDBXD OR <br /> FREE L BASE PL BOLT CIRCLE CIA EQUIVALENT). ONTRACTOR TO MEASURE POLE DIAMETER <br /> DRAINING <br /> + 6" (16" CIA MIN.) AT AFFPOINT WHERE AAND RETURN TO <br /> HT OF OBOEING EEC T IS AT O RICALENGINE R TO <br /> GRAVEL NOTE: FINALIZE MOUNTING BRACKET ORDER. <br /> COORDINATE POLE BASE DEPTH AND REINFORCING WITH <br /> STRUCTURAL ENGINEER BASED ON ACTUAL SOIL CONDITIONS. FIXTURES SHOWN FOR REFERENCE ONLY. REFER TO <br /> PVC SITE PLAN FOR QUANTITY AND ORIENTATION <br /> CONDUIT LIGHT STANDARD <br /> IN-GRADE RECEPTACLE DETAIL CONCRETE BASE C <br /> SCALE: NTS E506-3 SCALE: NTS E506-3 <br /> SYM REVISION BY APPROVED DATE SYM REMSION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> A RECORD SET 11484927 URS GIBBON 11.05.12 ACCEPTABILITY MAC 11.22.11 LIGHTING POLE DETAILS <br /> THIS DESIGN AND/OR CHECKED W9118435 C 08.25.23 0 <br /> SPECIFICATION IS APPROVED LAMPA 11.22.11 SHEET <br /> BOE//VG ENGINEER E506 3 <br /> B 40-058 SITE UTILITIES - RECORD DWG W2534622 SAZAN KWA 07.31.16 ® APPROVED BY DEPT. DATE MAC 11.22.11 _ m <br /> C 40-53 LIGHTING REPLACEMENT W9118435 CSL MDK 08.25.23 CHECKED <br /> GIBBON 11.22.11 40-YD APPROVED JOB N0. COMP NO. <br /> NEWTON 11.22.11 3 <br /> APPROVED ELECTRICAL MASTER EVERETT, WA DWG NO. 40-YD-E506-3 <br />