My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
620 112TH ST SE SPACE 1 2025-11-07
>
Address Records
>
112TH ST SE
>
620
>
620 112TH ST SE SPACE 1 2025-11-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 1:48:32 PM
Creation date
3/24/2025 10:55:15 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
620
Unit
SPACE 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2407-055 Description: New Deck <br /> Applied:7/22/2024 Approved:8/23/2024 Site Address: 620 112TH ST SE SPC 1 <br /> Issued:8/23/2024 Finaled: City,State Zip Code: EVERETT,WA 98208-8031 <br /> Status: PERMIT ISSUED-ONLINE Applicant: EVERGREEN HOME EXTERIORS <br /> Parent Permit: Owner: LAGO DE PLATA VILLA LLC <br /> Parent Project: Contractor: EVERGREEN HOME EXTERIORS <br /> Details: <br /> Build new free standing deck off the side of mobile home <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/11/2024 10/11/2024 BLDG 02- Matt Schreifels APPROVAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK <br /> Notes: <br /> 10/9/2024 11:19 AM EVERGREEN HOME EXTERIORS <br /> Contact Name:EVERGREEN HOME EXTERIORS <br /> Site Address:620 112TH ST SE SPC 1 <br /> Phone:2538882607 <br /> e-Mail:jenna@evergreenhomeexteriors.com <br /> OK to place concrete <br /> 10/30/2024 10/30/2024 BLDG 08-FRAMING Matt Schreifels CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 1.Replace post caps at all four corners with Simpson hardware EPCZ as approved on plan2.Add blocking over beam near house per plan details.3.Install <br /> H2 clips at joist to beam connections at all locations per approved plans4. Install H2.5 clips at roof rafter to beam connections at all locations per <br /> approved plansReschedule for framing inspection once corrections have been addressed. <br /> 11/4/2024 11/4/2024 BLDG 08-FRAMING Matt Schreifels PARTIAL see notes <br /> APPROVAL <br /> Notes: <br /> 11/1/2024 6:58 AM EVERGREEN HOME EXTERIORS <br /> Contact Name:EVERGREEN HOME EXTERIORS <br /> Site Address:620 112TH ST SE SPC 1 <br /> Phone:2538882607 <br /> e-Mail:josiah@evergreenhomeexteriors.com <br /> Excludes framing for deck stairs.To be inspected at final. <br /> 11/7/2024 11/7/2024 BLDG 08-FRAMING Matt Schreifels APPROVAL see notes <br /> Notes: <br /> Stair framing <br /> I <br /> Printed:Thursday, 14 November,2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.