My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW 2025-04-07
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 10:46:00 AM
Creation date
3/24/2025 10:58:59 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO ROSENAU & ASSOCIATES, INC. <br /> Geotechnical Engineering, Construction Inspection & Materials Testing <br /> REINFORCING STEEL INSPECTION REPORT <br /> Report Number: RS3290296 <br /> Project Name: Helion Energy Precast Pit Structure Infill Job Number: 24-0811 <br /> Project Address: 1313 75th St SW, Bldg. B, Everett Permit: B2407-044 <br /> Client Name: Helion Energy, Inc. <br /> Description <br /> Grade: 60 Manufacturer: Cascade <br /> Type of Bar: W A-615 ❑ A-706 ❑ N/A Special Ductile Quality(SDQ) Steel: No <br /> Inspector: John Fraser(WABO#: SI 02055) Inspection Date: 8/1/2024 <br /> Stuctural Elements/ Location / Grid Lines <br /> On site for ORA at contractor's request for reinforcing steel installation inspection. Inspection covers the requirements <br /> for material identification and condition of steel elements. Inspections cover requirements set forth in engineer's <br /> specifications, ACI 318 and approved construction documents. <br /> Reinforcing steel inspections were performed on the following: <br /> Ref Peterson Structural Engineers job#2202-0023, sheet S2 of 2 <br /> -Vault/Pit Lid @ Gym K.6-L/2.3-2.4 lines per plan <br /> All structural elements have been installed per approved construction documents, have proper clearances from <br /> earthwork and forms, and have been secured from movement during concrete placement. <br /> This scope of work conforms to ACI 318 criteria and typical mechanical slab details. <br /> Conforms <br /> Copies to: Isaac Ruoff Date: 2024.12.06 <br /> ❑ Client ❑ Engineer ❑ Others Technical Responsibility: 1 0:09:37 -08 00 <br /> ❑ Owner ❑ Contractor <br /> Isaac Ruoff, Project Manager <br /> ❑ Architect ❑ Building Dept <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. Reproduction of this <br /> report except in full,without written permission from our firm is strictly prohibited. <br /> 6747 M.L. King Way S.,Seattle,Washington 98118—Phone(206)725-4600—Fax(206)723-2221 <br /> Form No.:ADMIN-76-03(Rev 01124) Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.