Laserfiche WebLink
Operable Partitions MODEL 3030 PART3-EXECUTION <br /> K II <br /> 3.01 INSPECTION 3.03 ADJUSTING AND CLEANING <br /> A.Proper and complete preparation of the operable wall system A.The operable wall panels and track system shall be adjusted and <br /> opening shall be by others in accordance with the architectural cleaned in accordance with KWIK-WALL's written instructions. <br /> drawings,KWIK-WALL's shop drawings and ASTM E 557•Any <br /> deviation of the actual opening from these specifications shall be 3.04 PROTECTION <br /> called to the attention of the architect prior to the installation of the A.The operable wall panels shall be stored in the stacked(retracted) <br /> operable wall. position prior to acceptance by the owner's representative. <br /> B.Deficiencies in the operable wall opening shall be corrected <br /> by others prior to installation of the operable wall. 3.05 DEMONSTRATION <br /> 3.02 INSTALLATION A.KWIK-WALL's authorized distributor shall demonstrate <br /> proper operation and explain proper and necessary <br /> A.The operable wall system shall be installed by KWIK-WALL's maintenance requirements of the operable wall system to <br /> authorized distributor. the owner's representative. <br /> B.The operable wall shall be installed in accordance with <br /> KWIK-WALL's written instructions,shop drawings and <br /> 6 <br /> Dimensions in[I are millimeters.Contact your local distributor for additional assistance or visit www.kwik-wall.com 04-23 <br />