My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
226 80TH PL SW 2025-08-20
>
Address Records
>
80TH PL SW
>
226
>
226 80TH PL SW 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 2:55:14 PM
Creation date
3/24/2025 11:17:12 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH PL SW
Street Number
226
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cindy Bergsma <br /> From: Cal Bearman <br /> Sent: Tuesday,June 25, 2024 2:08 PM <br /> To: Cindy Bergsma; elenalitov@yahoo.com <br /> Cc: Anita Chen; Ben Monk; Scott Schreffler;Yin Lu <br /> Subject: RE: [EXTERNAL] Subject: 226 80TH PL SW----new permit <br /> Category 2:Sensitive information <br /> Elena, <br /> What you provided on the floor plan and roof plan should be used as a starting point for what we need for a building <br /> permit. It appears(IMG_8578)that the roof trusses are new and are now vaulted.With new roof framing, a drywall only <br /> permit is not sufficient.A Building Permit is applicable. <br /> The proposed project may involve work including but not limited to modifying the roof.All proposed work should be <br /> clearly shown in the drawings.The drawings should clearly delineate between existing and new work using established <br /> drafting standards.All demolition should be shown on the existing floor plans.All new construction should be shown on <br /> the new floor plan.Where the proposed project includes modifications to existing building components(e.g.,gypsum <br /> wall board, insulation, etc.),these components should be similarly delineated from existing component that are not <br /> being altered. <br /> For new vaulted roof trusses the drawings should include a note specifying the following: <br /> The truss construction drawings and calculations should bear the seal and signature of the professional <br /> engineer, licensed in the state of Washington, performing the design. <br /> The truss design should be reviewed for conformance with the approved construction drawings and referenced <br /> building codes,and approved for construction by the designer-of-record for the approved drawings, prior to fabrication <br /> and erection. <br /> Thank you, <br /> Cal <br /> Cal Bearman, P.E. <br /> LI <br /> 1.1 Associate Engineer—Building Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m. & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> Category 2:For official use only/disclosure permissible by law. <br /> From:Cindy Bergsma<CBergsma@everettwa.gov> <br /> Sent:Tuesday,June 25, 2024 6:43 AM <br /> To: elenalitov@yahoo.com <br /> Cc:Cindy Bergsma <CBergsma@everettwa.gov>;Anita Chen<AChen@everettwa.gov>; Ben Monk <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.