Laserfiche WebLink
Category 2: For official use only/disclosure permissible by law. <br /> From:Jon Gebow<lon@westrockcon.com> <br /> Sent: Friday,June 28, 2024 4:36 PM <br /> To: Ben Monk<BMonk@everettwa.gov> <br /> Cc: Georgia Gebow<georgia@westrockcon.com>; Ruka Wolf<RukaWolf@housinghope.org>; Anita Chen <br /> <AChen@everettwa.gov>; Cal Bearman <CBearman@everettwa.gov>; Scott Schreffler<SSchreffler@everettwa.gov>; <br /> Yin Lu <YLu@everettwa.gov>; Cindy Bergsma <CBergsma@everettwa.gov> <br /> Subject: Re: [EXTERNAL] Re: FW: Hopeworks, UNIT 407 sheetrock only repair at 3315 Broadway <br /> Hi Ben, <br /> Thank you for your feedback. <br /> I understand your feeling about this matter being you're the plans examiner, however it feels we are creating a <br /> mountain out of a molehill. <br /> This building is only about 4 years old and I know we are in a new building code cycle, but I can't imagine the wall and <br /> ceiling drywall assemblies have changed too much for a unit like this. <br /> I know that in the past Tony Lee has worked with me on achieving a "repair project" for Everett Housing Authority <br /> using the original building plans for the repair, due to the damage being less than 25%of the overall building footprint. <br /> If we have to involve an Architect to get all of the required documents and information to the COE planning this will <br /> severely delay the project and add more cost impacts to a nonprofit organization. <br /> I'm not trying to side step building inspections,just trying to expedite the process to help get another homeless <br /> person into housing., <br /> Thanks and have a good weekend! <br /> On Fri,Jun 28, 2024 at 3:13 PM Ben Monk<BMonk@everettwa.gov>wrote: <br /> Category 2:Sensitive information <br /> Hello Jon, <br /> Repairs should be done under a new building permit. Per section 116.5 of the 2021 IBC repairs are subject to the <br /> requirements of Chapter 4 of the International Existing Building Code. Many(but not all) of the provisions require the <br /> repairs to be completed in a manner which maintains the initially permitted and constructed conditions. However, <br /> 4 <br />