|
2 3 4 5 16
<br /> MECHANICAL SYSTEMS VENTILATION COMPLIANCE Project Prescriptive pg. 1 ENV-PRESCRIPTIVE
<br /> "
<br /> 2015 vV5�Cortpfance Forms for Commercial BwHkgs incWding R2,R3 8 R4 over 3 stories and all R1 '' -' 2015 Yl'SFL Cotryfence Forma for Commerical Buildings including R2.R3.&R4 over 3 stake and all RI
<br /> General Info Prajeet Tl"a: Hope orks Station 2 [Ate 12/1/2017 Project Title: Hopeworks Station 2 170te 12/01/2017
<br /> COMMISSIONING NOTES TWO OPTIONS ARE BEING CONSIDERED FOR PROVIDING VENTILATION FOR THE RESIDENTIAL UNITS: TNSPROJ.SLMfam Pro act street Address 3315 Broad.ay For Building Departmentu a Fenestration Area as%gross above-grade wall area 17.8a kax.Targs For BUMhg Depa meause
<br /> shalver as Reject CrY.County,Zp: Everett,WA 98201 M m Target . 4 THE BASE CASE INCLUDES THRU-WALL ERVs THAT OPERATE CONTINUOUSLY AT 35-70 CFM FOR ,hall,sh6effor a Skylight Area as%gross root area -
<br /> ALL UNITS.BATHROOM EXHAUST FANS WILL BE CONTROLLED BY A MANUAL SWITCH IN EACH c plience Tam Roject Owne-Falp: Itpew orks
<br /> I. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORDANCE WITH THE 2015 bminals.PnryeU Vertical Fenestration Alternates: None Selected on ENV-SUM
<br /> BATHROOM,VENTED HORIZONTALLY TO A WALL CAP AT THE PERIMETER WALL. T11*11Whesprojecr daindicnon: Everett
<br /> WASH11ZON STATE ENERGY CODE(WSEC)SECTION C408.THE MECHANICAL, an.nneblook Pmscripme compliance ofenvel°pe assemblies maybe accomplishedbypmWding maulaf R-values per Table C4027.3w1:lxlors/F-/actorsARCHITECTURE + DESIGN
<br /> ELECTRICAL,PLUMBING,AND CONTROL CONTRACTORS ARE REQUIRED TO PERFORM THE ALTERNATE CASE INCLUDES CENTRAL DUCTED ERVs THAT WILL CONTINUOUSLY SUPPLY AIR TO per Tables C-4021.4 and C-402.4.A single prgectmayoomply We R-valuesfa-sane envelope ex-bliesand LL/xror.F4.fors rot providedornate.
<br /> FUNCTIONAL PERFORMANCE TESTING OF ALL EQUIPMENT PRIOR TO TESTING BY THE Nomcanpbancamamodtakenfor-h assambyinspaces
<br /> ALL LIWNG SPACES,AND CONTINUOUSLY EXHAUST AIR FROM THE BATHROOMS. Project Description New Construction and Aadtkm
<br /> COMMISSIONING AGENT. CONTRACTORS SHALL PROVIDE THE NECESSARY LLFactor/FFector Method for
<br /> ASSISTANCE TO THE COMMISSIONING AGENT TO PERFORM COMMISSIONING DUTIES. THE KITCHEN RANGEHOOD SHALL BE 100 CFM(MIN).DUCT ALL EXHAUST HORIZONTALLY OUTDOORS. pro°tapprYro rl'a ❑r New Buw E]B.'e uM m irre Aeen ❑AdditionExisting trip Building Component R-Value Method for Prescriptive Coin line Prescriptive Compliance dylk.mar.net 1716 West Marine View Drive
<br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING CORRECTIVE ACTION IF ANY J Confnuous %Area of Metal
<br /> DEFICIENCIES ARE FOUND DURING COMMISSIONING. ALL AMENITY SPACES AND LEVEL 1 COMMERCIAL SPACES(EXCEPT THE KITCHEN)WILL BE CONTINUOUSLY SelecfAddinm+t!,a rpa Exklag Building Retrofit avty ins. ns.(G) p`7u iorw Assenbly
<br /> arerabon tExisfiw Tithe
<br /> VENTILATED BY DUCTED ERVs.THE COMMERCIAL KITCHEN WILL BE EQUIPPED WITH A TYPE I EXHAUST FAN exlsfr bwlan nae ❑Akeremn Auerelkn+Exk6 oe mndtkn Provide plarddeteP a of assembly and description R-VeWe R-Vake' in 0' uFactcr uFactor sources
<br /> E 2. COMMISSIONING PLAN TO INCLUDE AT A MINIMUM ITEMS 1-4 OF THE CX PLAN PE W/VFD AND DEDICATED MAKEUP AIR FANS W/VFD& c tined vim geaddinon ❑ °g ❑ °ga 1°fie Level roof-sheet A1.02:RM RDOF R-19 R-38 50.04% 0.02E Table 0102.1.3 E
<br /> C40812 aalferarlon ,S lit n au foo- Fidonc Building X Rlof deck-nhx1 A1.02:RVR RDOF R-19.30 R-38 50.04% 0.028 Table CA02.1.3
<br /> ppB.t-proe adman ❑ rgeo Pancy ❑ ig O - •
<br /> C502for C503.1. Roof deck-shed/A1.02:RC1 ROOF R-09 R-15 50.04% 0.028 Tebk G102.1.3
<br /> 3. A COMMISSIONING PROJECT REPORT OR COMPLIANCE CHECKLIST(C408.1.4.2) BuiHHg Elements Scope-Select all that apply m
<br /> SHALL BE COMPLETED BY THE VERIFIED CX AGENT AND PROVIDED TO THE OWNER ❑AN E]Bidding Envelope ❑Mechanical SystemsPRIOR TO FINAL MECHANICAL INSPECTION
<br /> ❑Service tot Water System ❑Lghting System E]Electrical System
<br /> 4. TESTING AND BALANCING:ALL HVAC SYSTEMS SHALL BE BALANCED BY A LICENSE
<br /> CONTRACTOR IN ACCORDANCE WITH ACCEPTED ENGINEERING STANDARDS AND .•
<br /> SPECIFICATIONS PRIOR TO COMMISSIONING. O All commercial 0 Group R-R2.R3.&Fit Mixed nixed the
<br /> Hopeworks Unit-by-Unit Heating Load Calculations over 3 slacks andaLRI
<br /> 5. OWNER TRAINING BY CONTRACTORS FOR EACH PIECE OF EQUIPMENT OR SYSTEM OccupancyMlxeduEs 58wlWng isgreaferfhan fhreesfories above grade snail has bolt Canmercial era GnoupR
<br /> SHALL INCLUDE:SYSTEM/EQUIPMENT OVERVIEW(WHAT IT IS,WHAT IT DOES,AND Type ocP
<br /> Volume Infiftm0an Mikad Ocw cY-&nloap tares raasaless above grade antl if lee beta Commencwantl Group
<br /> WHICH OTHER SYSTEMS OR EQUIPMENT DOES IT INTERFACE WITH).REVIEW OF THE Envelope UA a TomI UA R2 R3orRupanc'ies.5elecfAn Commerical to documenreanpliarKel me commarcialereas of
<br /> AVAILABLE 0&M MATERIALS.RENEW OF THE RECORD DRAWINGS ON THE SUBJECT J UA the building.TMres.den!Is/weesshalleanplywfheM WSECResidentialprodsims. 8
<br /> SYSTEM/EQUIPMENT.HANDS-ON DEMONSTRATION OF ALL NORMAL MAINTENANCE SNacfeu marappyro rw sic !react m
<br /> PROCEDURES,NORMAL OPERATING MODES,AND ALL EMERGENCY SHUTDOWN AND 2 2 b 1 201 542 69.3 5671.5 25.5 94.9 4,553 1,334 6,830 2,001 ss °�O p m
<br /> START-UP PROCEDURES. 2 Ob 1 202 309 27.1 3239.5 14.6 41.7 2002 587 3003 880 30 ❑�FullyCnrdebned ❑Seoaheatadl ❑RmtrgeratedWarehousa
<br /> z 1 b 1 203 398 34.4 4104.0 18.5 52.9 2,540 744 3 30 1126 30 Walk-n CookrlFreezer,
<br /> ❑Low Energy Space Categmyi Rafrgeraled a,gky Case' m �Wbod frame-sheet A1.01:WX611 R-21 50.04% 0.051 Table C902.1.3
<br /> 2 1 6 1 204 398 34.4 4304.0 ISS 51.9 2,540 744 3 810 111E 30 Space Conditioning P g S i hr Wood Frame-sheet A1.01:W 812R R-21 50.0/% 0.051 Table C402.1.3
<br /> 2 1b 1 205 398 34.4 4104.0 18.5 52.9 2,540 744 3,810 1,116 30 Categories Eligible LowEnergy Spaces $ $2hr Wood Frame-sheet A1.02:WA6.22R R-21 50.04% 0.051 TableCA02.1.3 •
<br /> 2 0 by 1 206 310 41.4 655.5 2.9 44.4 2,129 624 3,193 936 30 n 3
<br /> Unconditioned ❑Low energy heating/cooling capacity - 0000000%
<br /> ENERGY CODE NOTES 2 1 b 1 207 363 11.5 3885.5 17.5 19.0 1391 408 2,086 611 30 3 Concrete w ale-sheet Al.00:CXB(00) R-13 R-6 5 o.01% 0.057 Tabk 0102.1.3 00 N7 0/?°O
<br /> 2 2b 1 208 540 49.1 5491.0 24.7 73.9 354E 7039 5319 1558 55 Nhekss service Greenhouse' Equipment Concrete .11- heet AI.00:CX10(00) R-13 R-6 50.04% 0.057 Table 0102.1.3 O P`❑6luiprre g Volyy
<br /> 2 0 6 1 209 318 62.8 1558.0 7.0 69.8 3,351 982 5,026 1473 30 equiprrenl shaker g Concrete w all-sheet A1.00:CX10(00V) R-13 R-6 50 o4% 0.057 Tabk C402.1.3 00 GJ SOT\m N,,j, 0
<br /> O CMU..11-she.tAlol):MXA(00) R-13 R-6 10.04% 0.057 Table C402.I.3 p �
<br /> t. SEE MECHANICAL AND PLUMBING SCHEDULES FOR EQUIPMENT TYPE,CAPAGtt z ob 1 uo 33z 3s.9 1ssa.o 7.D az.9 z,os7 6D3 3,oa6 9oa 3o Floor Area and Fleas Above Bukf Gross Conditioned Floor Area Pro' t Gross Coidtiored Floor Area ❑ A
<br /> AND EFFICIENCY. 2 Ob 1 211 332 32.1 3505.5 15.8 47.9 2297 673 3446 1010 30 Grade P` CMUw all-aheatA1.00:M9(.8(W) R-13 R-6 90.04% 0.057 Tabk CA02.1.3 _ z
<br /> 2 0 by 1 212 372 27.1 3477.0 15.6 42.8 2,053 602 3,080 902 30 Stories 5 b1255 54265.0 p
<br /> 2. PROVIDE THERMOSTAT CONTROLS CAPABLE OF A FIVE(5)DEGREE DEADBAND z 1 by 1 213 448 17.2 3477.0 15.6 42.8 2,053 602 3080 902 30 G/S ER
<br /> •prescriptiveO O Total Build Pertorrrence
<br /> BETWEEN HEATING AND COOLING. 2 16 1 214 477 33.0 3914.0 17.E 50.E 2429 712 3643 1067 30 Q � rig �
<br /> 2 1 by 1 215 509 68.0 4617.0 20.8 88.8 1 4262 1 1,249 6393 1,873 45 Prescrlpstve-R'olecfscomplytnppas #R,y shalldemonstrafecomplience wmarlapplicablemandafory. it a O�FSSj�AL E '\000
<br /> 3. PROVIDE AUTOMATIC SETBACK CONTROLS WITH NIGHT SETBACK AND SEVEN 7 errd PescnictwrequlremaMsog de.Re le t1C9o1.2,rem l for more"Zin it_Campllance rermsro OOpp�pp00
<br /> () 2 Ob 1 216 395 58.4 4968.5 22.4 80.8 3878 1136 5 17 1704 30 General Compliance include mtha Prescriprnesubminar al applkableENV LTG,MECHandC406. �+
<br /> DIFFERENT DAY TYPES. 2 0 b 1 217 395 37.2 5196.5 23.4 60.6 2,908 852 4,362 1,278 30
<br /> D Path iota/ yof,gPafromainnlebuddlingwplyagdelpe SechgpedamashallogshallinclWea n. -• • • p
<br /> 4. PROVIDE DAMPERS FOR OUTSIDE AIR INTAKES AND EXHAUST FANS WHICH 2 lb It 218 298 171 4113.5 18.5 45.7 2,194 lies 3,292 964 30 s ryolreswrsnomawra/ebu0dirgenergymotlelpersecnonca07andsnandemwstrarecpmpnence '
<br /> 2 06 1 219 298 19.9 4113.5 18S 48.4 2,322 680 3 83 1021 30 'eh all applicable mardatayprods'o r this Dade.RererroBaction C4012,mein 2lormoreinrormatron
<br /> CLOSE AUTOMATICALLY WHEN THE SYSTEM IS OFF,EXCEPT FOR THOSE Campliars:e/amstoinclude wrma7FB submits/:PROD-SIM,G06SIM BC/0&DETaL,ENV-CHKLTG-
<br /> SYSTEMS WHICH OPERATE CONTINUOUSLY WITH LESS THAN 20 CFM/SF 2 2b 1 220 671 58.2 5500.5 24.8 82.9 3980 1166 5971 1749 55 Off,LTG-CHKandall MECHfams(except MECH-ECONO).
<br /> LEAKAGE FOR BAROMETRIC DAMPERS,AND LESS THAN 10 CFM/SF LEAKAGE 2 D b 1 221 306 26.9 3125.5 34A 41.0 1,967 576 1951 865 30 3 H O P E W O R K S
<br /> FOR MOTORIZED DAMPERS. 2 lb 1 222 400 71.2 6859.0 30.9 102.0 4898 1435 734E 2152 30
<br /> 5. PROVIDE MICROPROCESSOR-BASED THERMOSTAT FOR HEAT PUMP CONTROLS. 3 z by 1 301 sae 71.3 5970.0 26.9 98.1 4709.7 1379.9 7064.E 2069.9 ss §x o STATION 2
<br /> 3 0 b 1 302 309 27.8 3410.0 15.3 43.1 2071.0 606.8 3106.4 910.2 30 m O
<br /> 6. PROVIDE A MEANS OF BALANCING EVERY AIR SUPPLY OUTLET AND AIR OR 3hr concrete-sneer A1.o2:Fc1_FLOOR R-3e o.oz9 Table C402.1.4
<br /> 3 1 b 1 303 398 35.3 4320.0 19.4 54.7 2627.5 769.8 3941.2 1154.8 30 FOR
<br /> WATER TERMINAL DEVICE. 3hr Concrete-s beet Al.o2:FC2_FLOOR R-38 0.029 able CA02.1.4
<br /> 3 16 1 304 398 35.3 4310.0 19.4 54.7 2627.5 769,8 3941.2 1154.8 30
<br /> 7. SIMULTANEOUS HEATING AND COOLING IN A ZONE IS NOT PERMITTED. 3 1 b 1 305 398 35.3 4320.0 19.4 54.7 2627.5 7693 3941.2 1154.8 30 C 3hr Concrete-sheet A1.02:F03_FLOOR R-49 0.029 Table G702.1A
<br /> 3 Ob 1 306 310 42.8 3470.0 15.6 58.4 2805.3 821.9 4207.9 1232.9 30 1"Wooefremed-sheetA1.02:FW1 FLOOR R-30 0.025 Table C402.1.4 Hopeworks
<br /> 8. SEAL TRANSVERSE SEAMS OF ALL DUCTWORK. 3 1 b 1 307 363 11.8 690.0 3.1 14.9 713.7 209.1 1070.5 313.7 30
<br /> 3 2 by 1 308 540 50.6 4090.0 18.4 69.0 3311.3 970.2 4967.0 1455.3 55
<br /> 9. SEALING TO CONTROL BUILDING ENVELOPE AIR LEAKAGE AND AIR TIGHTNESS 3 0 by 1 309 318 64.7 5780.0 26.0 90.7 4353.8 1275.6 6530.7 1913.5 30 lPrescriptivea e
<br /> TESTING IS REQUIRED PER 2015 WSEC SECTIONS C402.5.1 THROUGH 3 0 by 1 1 320 332 1 36.8 1640.0 7.4 44.2 1 2222.3 1 6223 3183.5 1 932.8 30 'Envelope 2015 WSEC Compliance Fonm for Cormercal Bucings Including R2,R3.&R4 over 3 stories and all Rt
<br /> C402.5.8.PROVIDE BUILDING OWNER AND CODE OFFICIAL WITH REPORT 3 Ob 1 311 332 33.0 3690.0 16.6 49.6 2391.8 697.9 3572.7 1046.8 30 2015 WSEC Compliance Forms for Commercial Buildings including R2,RT,&R4 over 3 storks and IN R7 Protect Tnk: Hopeworks orks Station ate 1z/o1/2017
<br /> INCLUDING TESTED SURFACE AREA,FLOOR AREA,AIR BY VOLUME,STORIES P p AT
<br /> 3 0 b 1 312 372 17.8 3660.0 16.5 44.3 2125.0 622.6 3187.4 933.9 30 Project Info Project Title: Hopeworks Station 2 Date 12/01/2017 17.8aor Buildin De t t Use
<br /> ABOVE GRADE AND LEAKAGE RATES. 1 Fenestration Areas,%gross above-graaewan area Max.Mkx target: g aar men
<br /> 3 ih 1 313 448 27.8 3660.0 16.5 44.3 2125.0 622.6 3187.4 933.9 30 Compllencelorms "dto� ui�'if F im""ca¢e7r� mafionidv�ahocan For Building Department use SkylightAredas%groasroofarea nkx.rergel: 3315 Broadway
<br /> 10. DUCTWORK AND PLENUMS SHALL BE THERMALLY INSULATED IN ACCORDANCE 3 Sb 1 314 477 34.0 4120.0 18.5 52.5 2520.3 738A 3780.5 1107.7 30 d...... pp° q 11°�°
<br /> WITH 2015 WSEC SECTION C403.2.8. 3 ib 1 315 509 69.9 4860.0 21.9 93.7 4403.1 1290.1 6604.7 1935.1 45 4a arouse. Company Dykeman Ifwicalfanestra6'maskyliydareaexceedsmaximumallo edperC40241.Nantheprgecrmustcomp/y Everett, WA
<br /> buctionallls Company Address: 1716 W Marine View Or,Everett,WA 98201 We Component Pedormamceard de ENV-UAaM ENV-SHGCMrms.
<br /> 3 06 1 316 395 60.4 5130.0 13.5 84.0 4029.7 1180.7 6044.E 1771.0 30 calcularirg cells are pr°w
<br /> 11. ALL PIPING SHALL BE THERMALLY INSULATED IN ACCORDANCE WITH TABLE wits-protected. Applicant Name: Doug Hoflus aue 1 or actor/-actor 1
<br /> 3 0 b 1 318 395 27.9 4330.0 14.E 61.7 2273.8 666.2 3410.3 1322.1 30 2 Building Component Rescrptiv,a"pk roe Prescriptive Corm44anoe a
<br /> C403.2.9 OF THE 2015 WSEC ENERGY CODE. ; 1 b 1 316 484 27.9 4330.0 19.5 47.4 2273.8 666.2 3430.7 999.3 30 Applicant Phone: Q6-259-3161 Perm hs. Full Skb O
<br /> 3 Ob 1 319 298 30.5 4330.0 19.5 50.0 2401.5 703.E 3602.3 1055.5 30 Applicant sough@eykeman.net Provide I W&u,laofassenb end! R-Value RValue FFector F-FmtorSource10 CONFORMED SET
<br /> 12. ALL ELECTRIC MOTORS GREATER THAN 1.0 HP SHALL MEET THE P a y a P ion
<br /> 3 2 b 1 320 671 59.5 5790.0 26.1 85.5 4205.2 1202S 6157.9 1804.2 55 a $Stab-sheet A1.C2:FC4-FLOOR 0.540 Table C402.1.4
<br /> REQUIREMENTS OF 2015 WSEC TABLE Ca05.8(t)-(a). Project Description ❑+NewBuidtg E]Addition ❑Akertlkn _ 5/14/2018
<br /> 3 0 6 1 321 soli 27.4 3190.0 14.8 42.3 2028.1 594.2 3042.1 891.3 30 w Slab-sheet A1.02:FC5 FLOOR R-30 0-540 Table 0402.1.4
<br /> 13. WATER HEATING EQUIPMENT AND STORAGE TANKS SHALL MEET THE MINIMUM 3 1 b 1 322 400 72.8 7220.0 32.5 105.3 5052.0 14802 7578.0 2220.3 30 Occupancy Type AD CommercialGroup R.Al R7 and p2,R3,R4 ova 3storks Q Mked the w
<br /> REQUIREMENTS OF TABLE C404.2 OF THE 2015 WSEC. Selectionrequiredtoenablefor- `
<br /> 4 2 by 1 401 542 91.5 4973.0 22.4 113.8 5464.8 1601.2 8197.1 2401.7 55 s $
<br /> 14. IDENTIFICATION MARK SHALL A APPLIED TO ALL ERVA13TK)N MATERIALS AND Envelope Compliance Path O Component in
<br /> 4 0 b 1 402 309 37.1 2840.5 12.8 49.9 2396.3 702.1 3594.4 1053.1 30 �Reccrpnva Ca t Pertormance This drawing is:
<br /> INSTALLED SUCH THAT THE MARK IS READILY OBSERVABLE DURING INSPECTION se/eceonrequiredroerwblerorms. 9
<br /> 4 1 b 1 403 398 47.1 3598.E 16.1 63.3 3039.E 890.E 4559.4 1335.9 30
<br /> C PER 2015 WSEC C303.1.1 AND C303.1.2. ins. Axe-bly
<br /> ctor 1.Copyright 2017 Dykeman,Inc. C
<br /> / 1 b 1 404 398 53.5 3598.E 16.1 69.E 3343.0 979.5 5014.4 1469.2 30 Component Performance Provide ID from door schedule and deserpeon 'Value LLFactor LLFactor Source" 2.The Architect's Instrument of Professional Service.
<br /> ®Standard Q Change of Occupancy/Cardtionag QSami-heeled ' le..mg teat Air%WOO.Hfi101 0.370 Tables CA02.1 4
<br /> 15. FENESTRATION PRODUCTS SHALL BE LABELED WITH RATED U-FACTOR,SHGC, 4 1 b 1 405 398 49.9 3598.E 13.0 69.E 3017.7 884.2 4526.6 1326.2 30 Calculation Type is
<br /> ere g-s 3.For use er this project only.Obtain Architect's
<br /> VT AND LEAKAGE RATING PER 2015 WSEC C303.1.3&C402.2.1. 4 0 b 1 406 330 49.9 1890.5 13.0 62.9 3017.7 884.2 4526.E 1326.3 30 Duubk sw ing-sheetA7.10:HM00,F&401 0370 Tebk CA02.tA written permission for any other use Or reproduction.
<br /> 4 ib 1 407 363 24.5 574.8 2.6 27.2 1299.8 380.8 1949.7 571.3 30 Selactionreeqq Yedrnenable,ENV-114 ❑AddBkrel Elfre erc y Pee kage Opfun.GO6.8 chanced EnvelopeMENV-SHGCremms. Tocan 116. SUBMETERING EQUIPMENT SHALL BE PROVIDED IN ACCORDANCE TO THE 4 2b 1 408 540 64.6 3407.0 15.3 80.0 3839.0 1124.8 5758.5 1687.2 55 py.demonsberebuildkgmermawe Wopeperrormaasis l5%losarthantheTargetU4. Amenity Garage Doom-sleet A7.10 0340 Tabk C402A.4 PROJECT NUMBER:REQUIREMENTS OF SECTION C409. 4 0b 1 409 318 75A 4814.7 21.7 96.8 4645.3 1361.0 6967.9 2041.E 30
<br /> Airbarrkrtesengper Section G02.5.12 qa barrkrtasa t d
<br /> 4 06 1 430 332 31.2 1366.1 6.1 38.3 1839.5 539.0 2759.3 808.5 30 ❑ ❑ rig no require
<br /> mcWded n projeclscope sokr H4a<Gan C.eniciem(srlcc) LLFactor for Rescrpeve G Qlknce 2016-025
<br /> 4 0 b 1 411 332 48.8 3073.8 13.8 62.E 3004.3 880.2 4506.4 1320.4 30 Projection OrkMaeon
<br /> 4 0b u'1 422 372 44.3 3048.8 13.7 58.0 2785.4 826.1 4278.1 2224.2 30 A Barrier Testing ❑Additional Elfciers:y Package Option 6.9 n-C40 Reduced Air Infiltration Factor(Ffl (Nor Assenbly Assenbly
<br /> 4 1b 1 413 448 38.0 3048.8 13.7 51.7 2492.0 727.2 3723.0 1090.8 30 11covidelDfrmn,vindow scheduleanddescripbon it applicable" SE)', SHGC" LLFactor LLFacWr Source"
<br /> 4 1 by 1 414 477 51.0 3432.0 15.4 66.5 3189.8 934.6 4784.7 1401.9 30 c6MP(a barrieraude.area)under restpresaueaf0.3mch w.g. Vnyl Window s-sheet A7.20:VN1-VN11 N 0.53 0.26 Tabk 0402.4 •
<br /> 4 1h 1 415 509 80.2 4048.4 18.1 98.4 4724.8 1384A 7087.2 2076.5 45 1 Vinyl Wndaw s-sheet Air 20:VN1-VN11 SEW 0.40 0.26 Tebk C402.4
<br /> Vertical Fenestration and Total Vertical Gross Exterior MARK DATE DESCRIPTION
<br /> 4 2b 1 416 798 77S 4356.E 19.E 97.1 4659.E 1365.2 6989.3 2047.9 55 Vinyl A7.20:VN1-VN11 0.85 SEW 0.40 0.2E Table CA02.4
<br /> 4 1 b 1 417 484 53Z 4556.5 20.5 74.3 3565.8 1044S 5348.6 1567.1 30 Skylight Area Calculation Fenestration Above Grade %Vertical 2
<br /> SECTION C406 COMPLIANCE °Pghopening) divided by War Area ti�a,00 eq°ale Peeatraa°° _ N 0.31 Table 01024
<br /> 4 Ob 1 418 298 87.3 7113.8 32-5 119.8 5749.6 1684.E 8624.5 2526.9 30 PrescripavePath.Eme-alues for p g,Storefront-sheer A7.20:SFseriea 0.53
<br /> 4 2b 1 419 671 74.8 4823.1 11.7 96.5 4633.1 1357.5 6949.7 2036.2 ss vicar n baem,skylpnfa r nee 7579.E - 42470.9 X100= 17.8% °Storefront-sheet AT20:SFseriea SEW 0.40 0.31 Table CA02.4
<br /> d moron mils ENV-SLM1i xcrksMef. - b
<br /> 4 Ob 1 420 soli 36.9 2740.6 12.3 492 2362.3 692.1 3543.4 1038.2 30 ComponantParfamance-Enterwlues Gross Ecterior W
<br /> THIS BUILDING SHALL COMPLY WITH SECTION C406 OF THE 2015 WSEC BY ENV-!N mNa ENV-U4-GROLP-R Total Skylight divided b Roof Area tines,100 equals %Skylight
<br /> r_Y
<br /> 4 ib 1 421 404 92.0 6014.3 27.1 119.I 5714.7 1674.4 8572.0 2511.E 30 worksheel.Thesevalussauto-fillfrom SkYtg Y Yg
<br /> COMPLYING WITH THE FOLLOWING TWO OPTIONS: ENV-Lla ardarewrie-pmrectedm ENv- o SYorefronl-sneer A7.20:SF series N 0.53 0.3g Table CAo2.4
<br /> TOTALS 26,997A 3,031.0 258,917 7,165.1 4,19E 201,413 59A33 302,119 88,520 0.0 - 13054.E Xt00= 0.0$ -Storefront-sheet A7.20'SF series SBN 0.40 0.38 Table C402.4
<br /> 1)PROVISION OF A DEDICATED OUTDOOR AIR SYSTEM(DOAS)IN ACCORDANCE
<br /> WITH SECTION C406.6-AT LEAST 90%OF THE BUILDING CONDITIONED FLOOR Vertical
<br /> =Storefront Entry-sheet A7.20.SF series SEW 0.40 0.60 Table C4024
<br /> AREA(EXCLUDING UNOCCUPIED SPACES THAT DO NOT REQUIRE VENTILATION PER Area w
<br /> THE MECHANICAL CODE)SHALL BE SERVED BY DOAS EQUIPMENT THAT MEETS Fenestration Area Compliance
<br /> THE APPLICABLE REQUIREMENTS OF SECTION C403.6.
<br /> Skylight Area SKYLIGHT AREA COMPLIES r
<br /> 2)REDUCED AIR INFILTRATION IN ACCORDANCE WITH SECTION C406.9-AIR a
<br /> INFILTRATION MUST BE VERIFIED BY WHOLE BUILDING PRESSURIZATION TESTING Vertical Fenestration
<br /> CONDUCTED IN ACCORDANCE WITH ASTM E779.AIR LEAKAGE RATE SHALL NOT Q High pertormmncefenesiretcn LLfacWeand SHGC per G/02.4.1.3
<br /> EXCEED 0.25 CFM/SF UNDER PRESSURE DIFFERENTIAL OF 0.3 IN WATER.A Alternates 0 Dedicated outdoor as system per 0102.4.1.4 and C403.6
<br /> REPORT THAT INCLUDES THE TESTED SURFACE AREA,FLOOR AREA,AIR BY Show locations ofqusliyirgdayfigdzone C)In buidirigs z 3 stores,25%or more of NET floor area is n daylight zones par C402.4.1.1
<br /> VOLUME,STORIES ABOVE GRADE,AND LEAKAGE RATES SHALL BE SUBMITTED TO areasard ft1-p1gectp1ans.
<br /> THE CODE OFFICIAL AND THE BUILDING OWNER C,In building,<3,tmi3,.50%,rmca cf OONDTDNED fboraree is thindaylightzons,per
<br /> B For DayfightZone Area Calculations- 0402,4.1.1 B
<br /> a)SidW,gheraas includeprmsrya Daylight Zone Calculations
<br /> ecord.ryda)4gN zoneareas. Daylight Zore Fenastratcn Alternate Sidelight Daylght Topkght Daylight Percent Daylight -•
<br /> b)lncludeowrlapping toplig`rt and Not Selected,No Calculations Required Zone Area Zone Area Zone Area
<br /> T opi,g M da ylighr zone areas uMer
<br /> 7oplighr PRINCIPAL IN CHARGE:
<br /> c)Re/erro Chapter 2 corner fl-area PROJECT MANAGER: I
<br /> PROJECT ARCHITECT:
<br /> Spaces in Single Story Ustellenclosedspemsthatexcead2,5gO8;h-ailinghsightgreaterman158,andarespace JOB CAPTAIN:
<br /> Building Requiring Skylights M-requiredrocompywtmmisprovisiw.
<br /> Codemquire3aminimumd50%ofthe floor Space Area(fF) DLZAreatt?) SRtor ApereWre Exception
<br /> ce to be vAtivna skyfigMdeyligMzonefor
<br /> specific specetypes.Relerro C402.9.2ror
<br /> requirements.
<br /> DLZ=Daylight zone,
<br /> SRR=SkNigMW roohetio indicate aiter,ure w th"AP prefix(AP 1.1%)
<br /> DRAWING TITLE:
<br /> A ENERGY CODE A
<br /> COMPLIANCE - A
<br /> DRAWING
<br /> 2 3 4 5 6
<br />
|