2 3 4 5 6 7 <br /> a: tt <br /> STANDARD NOTES ] <br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL(ESC)PLAN DOES NOT W�0 so <br /> CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN(E.G.SIZE W w d] <br /> A AND LOCATION OF ROADS,PIPES,RESTRICTORS,CHANNELS,RETENTION FACILITIES, w z <br /> UTILITIES). Ccn <br /> cnd H <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, — <br /> MAINTENANCE,REPLACEMENT,AND UPGRADING OF THESE ESC FACILITIES IS THE IX �N <br /> RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS ME <br /> w W <br /> COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. o w <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE ¢o m <br /> ffi <br /> CLEARLY FLAGGED IN THE THE FIELD PRIOR TO CONSTRUCTION.DURING THE �a 3 U <br /> CONSTRUCTION PERIOD,NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS <br /> SHALL BE PERMITTED.THE FLAGGING SHALL BE MAINTAINED BY THE <br /> APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br /> CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES,AND IN SUCH A 0 dd <br /> MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT <br /> ENTER THE DRAINAGE SYSTEM,ROADWAYS,OR VIOLATE APPLICABLE WATER <br /> QUALITY STANDARDS. <br /> Vj <br /> B 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br /> ANTICIPATED SITE CONDITIONS.DURING THE CONSTRUCTION PERIOD,THESE ESC e" Q <br /> FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS W '�1sls <br /> AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE < �4 <br /> THE SITE. z <br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br /> APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING,ESPECIALLY us <br /> AFTER STORM EVENTS. <br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A m ao 0o eo <br /> MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR <br /> STORM EVENT. b <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO N n n a <br /> ACCUMULATE WITHIN A TRAPPED CATCH BASIN.ALL CATCH BASINS AND <br /> CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.THE CLEANING <br /> OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM <br /> SYSTEM. <br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING <br /> C OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ��'• <br /> ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS z <br /> ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS o <br /> AND SEDIMENT TRACKED OFF THE SITE. i c� <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING <br /> SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. `'i W <br /> 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR > > m <br /> UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, F5 Q i c° <br /> AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. s c o <br /> PEDESTRIAN PROTECTION PLAN <br /> D CONTRACTOR SHALL SECURE THE SITE WITH AN 8'TEMPORARY CHAINUNK FENCE. N <br /> CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION IN ACCORDANCE WITH THE g <br /> 2012 IBC SECTION 3306.WHEN CONSTRUCTION IS OVERHEAD AND ADJACENT TO <br /> EXISTING PEDESTRIAN PATHWAYS,CONTRACTOR SHALL PROVIDE COVERED WALKWAYS CONTRACTOR TO NOTES: <br /> IN ACCORDANCE WITH IBC SECTION 3306.7. PROVIDE PIPE ROUTING ' o, <br /> &CONNECTION DETAILS O PUMP CLEAN WATER TO APPROVED DISCHARGE LOCATION. <br /> 55 GAL.PERORATED o� � � $ 9 •• � <br /> DRUM TEST TURBIDITY <br /> CONTRACTOR NOTE PRIOR TO O 10 GPM PUMP g v o o <br /> CLEAN WASHED DISCHARGE O WRAP DRUM OR CMP WITH GEOTEXTILE,MIRIFI 140N OR <br /> ALL EXISTING UTILITIES SHOWN ON PLANS ARE TO BE VERIFIED HORIZONTALLY AND GRAVEL CONE APPROVED EQUAL.PROVIDE 6"OVERLAP AT SEAMS.CLOSURE <br /> VERTICALLY PRIOR TO ANY CONSTRUCTION.ALL EXISTING FEATURES INCLUDING BURIED NTH STAPLES OR WIRE RING. <br /> UTILITIES ARE SHOWN AS INDICATED ON RECORD MAPS AND SURVEY FURNISHED BY j\\j\\ ° / PUMP ON <br /> OTHERS.WE ASSUME NO LIABILITY FOR THE ACCURACY OF THOSE RECORDS AND //\//\ ° ° /\// 4. CONTRACTOR TO PROVIDE CONCRETE BASE. <br /> o SURVEY,FOR THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL TO \\//\\/ //\\/ O <br /> CONSTRUCTION CONTACT THE UTILITY OWNER/AGENCY. PLACE PUMP AND APPURTENANCES IN CENTER OF SUMP. <br /> / <br /> TEMPORARY EROSION AND SEDIMENT CONTROL NOTES W <br /> V 4 <br /> x SUMP WITH PUMP <br /> 1. CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION CONTROL MEASURES AND A Q <br /> CONSTRUCTION STORM WATER AT ALL TIMES. SCALE: NONE ~ C } Q <br /> N 2. MAINTAIN EXISTING PAVEMENT TO THE EXTENT FEASIBLE,COVER EXISTING MATERIALS Q <br /> o STOCK PILES,AND MAINTAIN A CLEAN SITE. <br /> 3. AREAS DISTURBED FOR THE CONSTRUCTION OF SIDEWALKS AND LANDSCAPE ARE <br /> WITHIN THE SITE AND WITHIN THE RIGHT OF WAY SHALL INCLUDE STRAW WATTLE AND O <br /> OR PLASTIC COVERING TO PROTECT DISTURBED SOILS. Q LI..I <br /> v. 4. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE,THE EROSION PER PLAN O <br /> F CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED TO ENSURE CONTRACTOR TO PROVIDE PIPE W LLI <br /> CONTINUING EROSION/SEDIMENT CONTROL. ROUTING&CONNECTION DETAILS <br /> � 55 GAL.PERORATED AS APPROVED BY NOTES, <br /> � m <br /> 5. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN A DRUM CONSTRUCTION INSPECTION TEST TURBIDITY O PUMP CLEAN WATER TO APPROVED DISCHARGE LOCATION. O LLI <br /> SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS PRIOR TO <br /> i COMPLETED,PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL,AND THE POTENTIAL SEDIMENT CLEAN WASHED DISCHARGE 2• SIZE PER PLAN T <br /> FOR EROSION HAS PASSED. �� O + <br /> LADEN WATER GRAVEL CONE <br /> a 6. to <br /> AT A MINIMUM,EROSION AND SEDIMENT CONTROL FACILI7IES SHALL BE MAINTAINED •�//\\'�\\ ° ° PUMP ON '\�//\\j'�\ O WRAP DRUM OR CMP KITH GEOTEXTILE,MIRIFI 100X OR <br /> MONTHLY,OR FOLLOWING EACH RUNOFF-PRODUCING STORM,TO ENSURE PROPER \�� ih = �� \/x APPROVED EQUAL PROVIDE 6°OVERLAP AT SEAMS.CLOSURE <br /> OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. ° ° WITH STAPLES OR WIRE RING. <br /> 7. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN,SIZE,NOR 1.5'OF�a \\ �,\' ° ° �� O CONTRACTOR TO PROVIDE CONCRETE BASE. <br /> LOCATION OF PERMANENT PIPES,RESTRICTORS,OR DETENTION FACILITIES; BUT IS AN SEDIMENT %, - -�/' 3HaV MAX SLOPE <br /> APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. STORAGE O PLACE PUMP AND APPURTENANCES IN CENTER OF TRAP. <br /> age � 1 � <br /> TO <br /> G 8. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN.TRACKING OF MUD AND DEBRIS <br /> Z FROM E SIT WILL <br /> E` RESULT IN ALLL OT WORK NON THEASITE BEINGASTOPPED.ILURE COMPLY NTH THIS CONDI710N WILL SEDIMENT TRAP 4 <br /> e r B SHEET TITLE: <br /> 9. THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, VIABLE, T.E.$.C. & <br /> oEe AND REASONABLE MEANS OF CONTROWNG AIR POLLUTION,INCLUDING DUST.DUST CAN DEMOLITION NOTES <br /> BE CONTROLLED BY WETTING EXPOSED SOILS,WASHING TRUCK WHEELS BEFORE THE UNDERGROUND SERVICE ALERT AND DETAILS <br /> LEAVE THE SITE,AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES. <br /> CONSTRUCTION VEHICLE TRACKOUT IS A MAJOR SOURCE OF DUST AND ANY EVIDENCE ONE-CALL NUMBER <br /> OF TRACK-OUT CAN TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE <br /> PUGET SOUND AIR POLLUTION CONTROL AGENCY. <br /> _o (800)424-5555 SHEET N0. <br /> g E <br /> CALL TWO BUSINESS DAYS C 10 <br /> OBEFORE YOU DIG <br /> SECTION 29, TOWNSHIP 29 NORTH, RANGE 5 EAST, W.M. <br />