Laserfiche WebLink
2 3 4 5 6 <br /> LAYOUT AND MATERIALS LEGEND <br /> TAG VISUAL DESCRIPTION DETAIL pA PLANTING AREA <br /> o CIP CONCRETE WALL ON STRUCTURE,6"WIDTH B5/L-501 <br /> UP � 2-PEDESTAL-SET PAVERS A3/L-501 <br /> 0 CIP CONCRETE WALL ON STRUCTURE,12'WIDTH B4/L-501 <br /> RD DECORATIVE ROCK B2/L501 DYKEMAN <br /> SS CIP CONCRETE SEAT WALL ON STRUCTURE,18'WIDTH B4/L-501 <br /> pg o PAVING BAND(SEE INTERIORS FOR TYPE AND FINISH) A2/L-501 ARCHITECTURE + DESIGN <br /> ® METAL PLANTER WALL G4/L-501 <br /> CB o CIP CURB ON STRUCTURE C2/L-501 <br /> CIP CONCRETE PAVING ON GRADE A6/L-501 CONTROL JOINT <br /> A4/L-501 <br /> E E <br /> pV CIP CONCRETE VEHICULAR PAVING ON GRADE A5/L501 — EJ— — EXPANSION JOINT <br /> — A4/L-501CONSULTANT: <br /> CIP CONCRETE PAVING ON GRADE WRH INTEGRAL COLOR <br /> G'1 AND FINISH) A6/L-501 <br /> Elm (SEE 1-121C FOR TYPE p a LANDSCAPE LIGHTING,SEE INTERIORS <br /> S1 ® CIPCONC( INTEGRAL SEE 12211CFORTYPEANDFNISH COLOR 6E4�1.02& GGLO2 <br /> NOTESz. <br /> 1.WATERPROOFING,PROTECTION BOARD,AND DRAIN MAT TO BE INSTALLED UNDER ALL PAVING,PLANTING,SITE WALLS,AND PLANTERS ON STRUCTURE.SEE BE002. <br /> 1301 First Avenue,Suite 301 <br /> Seattle,WA 98101 <br /> http:/Aaww.gglo.com <br /> F: n • <br /> ALLEY <br /> 2X2 SCORING / • <br /> BENCH,FURNISHED BY CONTRACTOR <br /> p G • • • p <br /> GAS 3Q METER EO EO it <br /> PROPERTY LINE <br /> TJ HOPEWORKS <br /> 'IF=-- -- PHASE 2 <br /> POB <br /> FOR <br /> Hopeworks & <br /> --- -- Housing Hope <br /> o' <br /> II ----------- i1iiiil <br /> 3315 Broadway <br /> Everett, WA <br /> 'TTTTTTTTTTIII it l <br /> h CONFORMED SET <br /> 05/14/2018 <br /> II II I I I I I I I I <br /> II <br /> This drawing is: <br /> C 1.Copyright 2017 Dykeman,Inc. C <br /> Arch <br /> r-I — \ _--- \ ---- — 2.Theen perms sInsfor any <br /> t er use Professional <br /> ITT 3.Far use on this project only.Obtain Architect's <br /> written permission for an other use or reproduction. <br /> PROJECT <br /> 2016033.00 <br /> 0 <br /> a ---- ---- MARK DATE DESCRIPTION <br /> 02I08/2018 Bid Set <br /> ---- ---- ADD 1 02/22/2018 Addendum#1 <br /> ADD 03/01/2018 Addendum#2 <br /> 0 1 1 1 1 1 1 1 1 <br /> 0 1 1 1 1 1 1 1 <br /> 0 <br /> B B <br /> • <br /> II PRINCIPAL IN IN CHARGE�M.SINDELLSINDELL <br /> u PROJECT PROJECT MANAGER�P.BENENATIBENENATI <br /> — PROJECTBCAPTAIN: <br /> D.BENENATI BENENATI <br /> a JOB CAPTAINED.JEONJEON <br /> d a ° <br /> d a <br /> I I <br /> a d rI <br /> ° <br /> e ° a <br /> t^1 d e g 4a a a a a a e <br /> a d d° O I <br /> II Tp'�'7 <br /> — — — — — — — — — — — 1 <br /> I I <br /> 1 1 <br /> ICB <br /> PROPERTY LINE <br /> DRAWING TITLE: <br /> A LAYOUT AND A <br /> MATERIALS PLAN - <br /> iz <br /> LEVEL P1 <br /> A B C E F G H I J K <br /> BROADWAY DRAWING NUMBER: <br /> LAYOUT AND MATERIALS - LEVEL P1 (ALLEY) 0. 4' 8' 16' PLAN / <br /> Al 8-1 <br /> NORTH <br /> 1 2 3 4 5 6 <br />