My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 10:44:58 AM
Creation date
3/24/2025 11:22:06 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 4 5 6 <br /> IRRIGATION-SCHEDULE <br /> SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY , 4 <br /> ® AREA RECEIVE DRIPLINE <br /> RAIN BIRD XFS-04-12 7.0 L.F. ARCHITECTURE + DESIGN <br /> XFS SUB-SURFACE PRESSURE COMPENSATING DRIPLINE <br /> W/COPPER SHIELD TECHNOLOGY.0.4 GPH EMITTERS AT 12"O.C. <br /> LATERALS SPACED AT 12"APART,WITH EMITTERS OFFSET FOR <br /> TRIANGULAR PATTERN.UV RESISTANT.SPECIFY XF INSERT 425.259.3161 <br /> FITTINGS. <br /> E Vol"callout E <br /> /y Valve Number <br /> }/ Valve Flow CONSULTANT: <br /> # Valve Size <br /> G G LO z, <br /> 1301 First Avenue,Suite 301 <br /> Seattle,WA 98101 <br /> http://www.gglo.com <br /> • <br /> p 7=7--- PROJECT IDENTIFICATION: D <br /> F <br /> HOPEWORKS <br /> 771 PHASE 2 <br /> All <br /> O FOR <br /> Hopeworks & <br /> Housing Hope <br /> ® AT <br /> CONNECTED TO LEVEL4 DOMESTIC WATER 3315 Broadway <br /> Everett, WA <br /> CONFORMED SET <br /> 05/14/2018 <br /> This drawing is: <br /> C 1.Copyright 2017 Dykeman,Inc. C <br /> 2.The Architect's Instrument of Professional Service, <br /> 3.For use on this project only.Obtain Architect's <br /> written permission for any other use or reproduction. <br /> Lai- 2016033.00 <br /> H <br /> • <br /> MARK DATE DESCRIPTION <br /> 02/08/2018 Bid Set <br /> ADD 1 02/22/2018 Addendum#1 <br /> ZLA2F P FT-1 <br /> ADD 2 03/01/2018 Addendum#2 <br /> � <br /> 0 <br /> e e <br /> PRINCIPAL IN CHARGE: M.0 SINDELL PROJECT MANAGER: P.BENENATI <br /> PROJECT ARCHITECT: P.BENENATI <br /> l O JOB CAPTAIN: D.JEON <br /> O <br /> O o <br /> a — <br /> DRAWING <br /> A IRRIGATION PLAN - A <br /> LEVEL 3 <br /> D E G H I J DRAWING <br /> IRRIGATION PLAN - LEVEL 3 0. 4 11 16 PLAN , <br /> 1/8"-1'-0" <br /> NORTH <br /> 1 2 3 4 5 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.