My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 10:44:58 AM
Creation date
3/24/2025 11:22:06 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 4 5 6 <br /> DYKEMAN <br /> ARCHITECTURE + DESIGN <br /> E E <br /> CONSULTANT: <br /> GGLOz. <br /> 1301 First Avenue,Suite 301 <br /> Seattle,WA 98101 <br /> httpJAaww.gglo.com <br /> • <br /> p PROJECT IDENTIFICATION: D <br /> HOPEWORKS <br /> PHASE 2 <br /> FOR <br /> Hopeworks & <br /> Housing Hope <br /> AT <br /> 3315 Broadway <br /> Everett, WA <br /> CONFORMED SET <br /> 05/14/2018 <br /> NOTES: <br /> 1.DRAWING IS FOR REFERENCE ONLY. This drawing is: <br /> C <br /> 1.Copyright 2017 Dykeman,Inc. <br /> 2.The Architect's Instrument of Professional Service. <br /> 3.For use on this project only.Obtain Architect's <br /> written permission for any other use or reproduction. <br /> PROJECT <br /> 2016033.00 <br /> MARK DATE DESCRIPTION <br /> 02/08/2018 Bid Set <br /> ADD 1 02/22/2018 Addendum#1 <br /> ADD 2 03/01/2018 Addendum#2 <br /> B B <br /> • <br /> _ - PRINCIPAL IN CHARGE: M.SINDELL <br /> PROJECTMANAGER: P.BENENATI <br /> _ PROJECT ARCHITECT: P.BENENATI <br /> JOB CAPTAIN: D.JEO---------------- <br /> r <br /> ARTISTIC DOWNSPOUT <br /> DRAWING TITLE. <br /> DECORATIVE ROCK <br /> 0 40� ,,� CONCRETE CURB <br /> A 4&OOP PLANTING AREA A <br /> SECTIONS <br /> CIP CONCRETE SEATWALL <br /> 7 <br /> BIORETENTION PLANTER PINNED TO SLAB, <br /> SEE ARCH DRAWING NUMBER: <br /> A4 BIORETENTION PLANTER PERSPECTIVE <br /> NTS <br /> 1 2 3 4 5 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.