My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Evergreen Recovery Centers 3/12/2025 (2)
>
Contracts
>
6 Years Then Destroy
>
2025
>
Evergreen Recovery Centers 3/12/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 11:41:58 AM
Creation date
3/25/2025 11:39:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Evergreen Recovery Centers
Approval Date
3/12/2025
Council Approval Date
2/26/2025
End Date
9/30/2025
Department
Finance
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Competency Diversion Services
Tracking Number
0004737
Total Compensation
$447,724.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 17 of 28 <br />SECTION 4 – PROPOSAL SUBMITTAL REQUIREMENTS <br />4.1 SUBMITTAL REQUIREMENTS <br />Suppliers must provide a proposal that must demonstrate an understanding of the project requirements <br />as stated throughout this Request for Proposal. <br />Proposals in response to this RFP must be submitted in the order specified below. Proposals must include <br />the following forms which are included as part of the solicitation: <br />1. Supplier Commitment and Information <br />2. Price Sheet <br />3. Narrative responses to the questions asked. Suppliers should re-type the heading, question <br />identifier, and question. Then, answer the questions and provide in the same order requested below. <br />Suppliers may emphasize in their narrative any areas of their proposal that they believe exceed our <br />requirements. <br />4. Certificate of Non-Debarment/Suspension <br />5. Certification Regarding Lobbying by Contractor <br />6. Disclosure of Lobbying Activities <br />7. Signed SAMSHA Clauses <br />4.2 SUGGESTED RESPONSE FORMAT <br /> Standard 8 1/2" x 11" paper. <br /> Single or double-sided, numbered pages. <br /> Typed with a minimum of 12-point font. <br /> Form 4.03 – re-type the question before responding. <br /> <br />Exhibit C
The URL can be used to link to this page
Your browser does not support the video tag.