My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish Public Utility District 3/12/2025
>
Contracts
>
Agreement
>
Other Agreements
>
Snohomish Public Utility District 3/12/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:31:00 PM
Creation date
3/25/2025 12:30:46 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish Public Utility District
Approval Date
3/12/2025
End Date
6/10/2025
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
Installation of LED Lighting in Service Center 1 Warehouse
Tracking Number
0004743
Total Compensation
$2,089.46
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PUD Staff: <br />Form Completed By: <br /> Date: <br />City of Everett City of Evt Service Cntr 2024-11 L <br />Facility Type:Commercial - Medium Office 5K-50K SQ FT Facility Sq Ft: <br />Line <br /># <br />Heat <br />Source <br />Hours/ <br />Year <br />Existing/ <br />Proposed <br />Fixture <br />ID <br /># of <br />Fixtures Fixture Type <br /># of <br />Lamps / <br />Fixture <br />Lamp <br />Wattage <br />Ballast <br />Type <br />Watts / <br />Fixture <br />Qualified <br />(Yes/No) <br />Control Type <br />---------- <br /># of Sensors <br />Rebate / <br />(Fixt.) or <br />(Lamp) <br />Exist: <br />Prop: <br />Exist:T-8-32W 23 High-Bay 6 32W NBF 165.0 Occ <br />Prop:UFO 100 23 High-Bay 100.0 22 P <br />Existing Energy Use as a % of Facility Total Electrical Use: Total Rebate (100% Cost): <br />OR <br />Version December 2024 - Effective Date December 1st, 2024 <br />Existing: Notes / Other <br />Proposed: Mfg / Model # <br />Energy Services ● eebiz@snopud.com ● www.snopud.com <br />57,071 <br />Rob Marks <br />3/5/2025 <br />RLM <br />Lighting Input Form <br />For Energy Efficiency Projects in Commercial & Industrial Facilities. <br />3200 Cedar St Everett, WA 98201 <br />1 <br />Lighting Technology Maximum Rebate <br />Amount <br />Location <br />(Area/Room) <br />2 Yes2,600 PLTSolutions PLT- <br />13130 w/PIR sensor <br />$92/ea <br />(Fixt.) <br />$15.7/Sen <br />Warehouse Electric <br />Linear Fluor - 4' T8 <br />LED Fixture <br /> Notes: <br />Cost Information: <br />Fixture Material Cost <br />$1,901.23 -9.8%$2,089.46 <br />Labor Cost Misc. Cost (permit, etc.)Subtotal Tax Rate Total Bid Cost (incl. sales tax) <br />- <br />Total Material Cost <br />$2,089.46 <br />$2,461 <br />1% <br />PUD APPROVED <br />By RLM on 3/11/25 9:36AM <br />City of Evt Service Cntr 2024-11 L 2 of 3 3/11/2025
The URL can be used to link to this page
Your browser does not support the video tag.