My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6504 HIGHLAND DR 2023 Plans 2025-03-27
>
Address Records
>
HIGHLAND DR
>
6504
>
Plans
>
6504 HIGHLAND DR 2023 Plans 2025-03-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 10:44:37 AM
Creation date
3/27/2025 10:43:35 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
6504
Permit
B2306-007
Year
2023
Notes
ATTACHED GARAGE CONVERTED TO ADU AND REMODEL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aa.o CRAWL SPACE VENTILATION CALCULATION <br /> 3 7 <br /> z <br /> A4.0 A4.0 <br /> NEW BEDROOM IN THE MAIN HOUSE: D E S I G N <br /> Y Y NEW CRAWL SPACE AREA=130 S.F. I�i� <br /> Dacsra®Illusl tee aioi <br /> REQUIRED VENTILATION AREA=130 S.F.1150=0.86 SF <br /> EXISTING ROOF FRAME TO PROPOSED VENTILATION AREA=(2)16"x8"VENTS=1.77 SF>0.86 SF THEREEQAE OK COPYRIGHT©M23 <br /> REMAIN i j,,, GEDIGGESIGx 011 RiGHTSRESERNED <br /> PROVIDE ACOUSTICAL /�.' THS DGOUMI AND THE iDErswD DESIGNS <br /> iINSULATION IN THE I INCDRPDMTED HEREIN,iS THE PROPERTY OF GEGG DESIGN, <br /> INSULATION <br /> IN THE BATHROOM PARTITION The-TiEN corRisiniaGOOD DDEESGR IN PonT,wrtHauT <br /> INSULATION IN THE i i T <br /> At BATHROOM PARTITION EXISTING ROOF FRAME TO WALLS <br /> PROVIDE 1-HR FIRE I WALLS REMAIN <br /> RETARDANT. <br /> TREATED i PROVIDE NEW <br /> WOOD UNDERSIDE OF CEILING WITH49B,B-AvT,T�f/� PROVIDE NEW <br /> THE PROJECTION i INSULATION `"-'" CEILING WI 49 BATT <br /> INSULATION <br /> IL <br /> WALL(1-HR RATED <br /> V P-8E05. - <br /> • EXTERIOR SIDING TO MATCH NEW WINDOW PER <br /> EXISTING SCHEDULE NEW WINDOW PER <br /> • 1/2x2 RAIN SCREEN BACKING \ W2 \ SCHEDULE <br /> BEHIND SIDING \ b EXISTING 2X AI FAME 16y11L11 "5 W3 <br /> • VAPROSHIELD ! B THROO •2 C7 WALL TO REMAIN,(PROVIDE J 0 \ <br /> • 5/8"GYPSUM BOARD TYPE"X" 1p O R-21BATT INSULATION IN THE <br /> • EXISTING WOOD FAME TO WALL CAVITY) _� BATHROOM-1 O INFILL OPENING w/NEW 2x <br /> REMAIN. ❑ WD FAME TO MATCH <br /> • R-21 BATT INSULATION i EXISTING CONCRETE BOG M1 EXISTING w/R-21 BATT <br /> • 5/"GYP U 0 T EN p ,'I1HLL AND FOOTING TO REMAIN CLOSET BATHROOM-2 o LIVING ROOM INSULATION IN THE CAVITY <br /> Main Floor ____ Main Floor <br /> - Floor FOOTING <br /> _ _.-- � <br /> EXISTING CONCRETE SOG :iJ TYP.EXT.STUD <br /> AND FOOTING TO REMAIN I I WALL CONSTR. <br /> FLOOR ASSEMBLY OVER SOG AINSCREEN MAT <br /> IN THE NEW CONDITION SPACE: SIDING PER <br /> -VAPOR BARRIER ELEVATIONS <br /> -P.T.WOOD FAME INSULATION <br /> 0 1 2 4 8 0 1 2 4 8 -RIGID INSULATION R-10 FOUNDATION WEEP BAFFLE <br /> �1 Section 2 14=+ ° n r•.� Section 1 1/4"=1'-0" F1 �� -PLYWOOD SCREED BY FRY <br /> 1/4"=1'-0" -FINISH FLOOR REGLET T.O.SUBFLR. Q <br /> ta�� OR APPROVED EQ. Q <br /> GA FILE 1 41'0 l,J J <br /> WP 9105 FIRE', 3ENERIC FIRE 7 � � o w <br /> GYPSUM WALLBOARD,GYPSUM SHEATHING,WOOD STUDS O Of O <br /> Fire Design: mi Q 0 m <br /> EX7ERpR SIUf,:One layer48"wise 6'6"type X gyps,lm sheamirq Uj C) O <br /> applied parallel to 2 x 4 wood studs 24'a.c with 1-3r4"galvanized I CAWLSPACE VENT I� Z Z Q <br /> roofing nails 4"o.c.at vertical johns and 7"mc.at intermediate I WITH INSECT q Q <br /> studs and tap and bottom plates. Joints DI gypsum sheathing I SCREEN,TYP. Q fY _1 <br /> may be lag untreated. Exterkx cladding t0 be attached t rough 17n EXISTING ROOF FAME TO FDTN WALL Q Q = � <br /> sheathing to studs. REMAIN (n C7 <br /> INTERIOR SIDE.One layer WS'type X gypsum wallboard,walar• moc�10 <br /> Z O = W <br /> CRAWL SPACE W/ <br /> 10-MIL VAPOR J <br /> resistant gypsum backing board,or gypsum veneer base applied ThiGmeee: 13W'welxxa daoWg{Fire] PROVIDE NEW BARRIER GROUND Q W <br /> N for In hl 11 1 w+th n i 1-7, 1 am a a a es De U 6d elect a S Dn.db m Is <br /> P 9 n9 9 CEILING WITH -09 A � O <br /> 0.0915'shank.114"head8,7"oC.(LOAD-BEARING) Approx.VYleWBpd MloAWtldhg(Flre) INSULATION COVER <br /> FkeTest: See WP351D Q U c�0 W <br /> (UL R3501.47,48.91765. CRAWLSPACE VENT @ PATIO <br /> UL Design U309. 6 1 1/2'=l'-0" z <br /> UL R1319.129,7-22-70, Qj NEW WINDOW PER O <br /> UL Design U314) SCHEDULE NEW WINDOW PER LLJ <br /> \ SCHEDULE UJ <br /> EXISTING 2X WD.FAME IS <br /> TYP.EXT.STUD O Z O <br /> WALL TO REMAIN,(PROVIDE WALL CONSTR. AINSCREEN MAT d O Op <br /> R-21BATT INSULATION IN THE p FIN.FLR SIDING PER <br /> WALL CAVITY) INFILL OPENING w/NEW 2x T.0._SUBFLR. ELEVATIONS <br /> WD FAME TO MATCH — 6"MIN.BETWEEN <br /> EXISTING CONCRETE SOG EXISTING w/R-21 BATT 2X P.T.SILL PLATE-- FINISHED GRADE& <br /> AND FOOTING TO REMAIN ,�BE R OM KIT DINING OOM Z INSULATION IN THE CAVITY W/A.B.&PLATE ii �woGO CONSTR. PERMIT SET <br /> _—_—___ __Main Flo WASHERS PER , <br /> 435'-4" STRUCT. = FILTER FABRIC <br /> MUD SILL SEALER& FINISHED GRADE <br /> CAPILLARY BREAK <br /> BARRIER�R _ — — <br /> IIIJ IN THE NEW CONDITION SPACE III WASHED PEA GAVEL 08/03123 <br /> OR ASSEMBLY <br /> •VAPOR BARRIER <br /> Section 3 1/4„=�,°„ 0 1 2 4 8 PO WOOD FRAME OVER SOG OVERLAP J —III REVISIONS: <br /> CAWLSPACE, <br /> F� _ 4"PERFORATED PVC <br /> 3 -PLYWOOD ID CATION R-10 —III NO. DESCRIPTION DATE <br /> ;. FTG.DRAIN,CONNECT <br /> 1/4"=1'-0" ` � JOINTS&HOLES� - i TO STORM DRAINAGE <br /> ,FINISH FLOOR FOUNDATION WALL \� — I_ YSTEM,TYP. I PERMIT COMMENTS 08/02/23 <br /> PER STRUCT. 1 <br /> 4 5 <br /> F <br /> ROOF CONSTRUCTION, Q <br /> ROOF CONSTRUCTION' <br /> CRAWLSPACE <br /> -ASPHALT SHINGLES i <br /> -30#BUILDING PAPER 30#BUILDING N APR <br /> -PLYWOOD PER STRUCTURAL <br /> -PLYWOOD PER STRUCTURAL <br /> -WOOD FRAMING PER STRUCTURAL -WOOD FRAMING PER STRUCTURAL <br /> I I I PROVIDE NE Q I <br /> EXISTING WOOD SLOPE SLOPE CEILING AN R49 BA I - - - <br /> FAMEROOFTO 1112 ++�-0° q INSULATIONI lrt7 <br /> OPE SLOPE q <br /> REMAIN RAZZ BATHROOM AREA 2"/r.o" A2.2 7 TYP FDTN CRAWLSPACE <br /> 1 1/2"=1'.0" Pmjed Manager: MTBG <br /> EXISTING WOOD �\ _ _ _ Dew by: MG <br /> FAME ROOF TO TO WALL30 <br /> ROOOF CRICKET REMAIN 44T-1 3/4" Jobe: z indicated <br /> ' Scale: As Indicated <br /> PROVIDE NE <br /> INSULATION A.ON -09 BATT PROVIDE NEVt(�yW <br /> CRO ID AN g9 <br /> INSULATION 0 <br /> WB NEW WINDOW PER EXISTING WOOD NEW WINDOW PER <br /> SCHEDULE <br /> SCHEDULE FAME WALL TO <br /> REMAIN <br /> ® _ W 7 J W8 <br /> NEW 2x6 WD FAME PER EXISTING WOOD C7 a O NEW 2x6 WD FAME PER <br /> EXISTING WOOD FLOOR STRUCTURAL w/R-21 BATT FLOOR ASSEMBLY U STRUCTURAL w/R-21 BATT - <br /> ASSEMBLY TO REMAIN '� INSULATION IN THE CAVITY TO REMAIN <br /> SPACE TO REMAIN -—'-- I 7 INSULATION IN THE CAVITY <br /> SAW-CUT EXISTING FOOTING (E)LIVING ROOM MASTER BEDROOM 7 Aa.o <br /> TO ALLOW PASS-THROUGHT A4.0 - 435'-4" <br /> TO NEW CRAWL SPACE, ---- ----- - - --- \ EXISTING IEl BEDROOM 2 BATHROOM MASTER BEDROOM _Main Floor \ <br /> EXISTING CRAWL <br /> REFER TO STRUCTURAL <br /> FLOOR CONSTRUCTION: b SHEET NAME: <br /> EXISTING CRAWL I CONCRETE FOOTING I FLOOR CONSTRUCTION: <br /> j -INTERIOR FINISH MATERIAL TO REMAIN ix •INTERIOR FINISH MATERIAL <br /> SPACE TO REMAIN -3/4"PLYWD PER STRUCTURAL _ BUILDING SECTIONS <br /> __ -FLOOR JOIST PER STRUCTURAL —I -3/4"PLYWD PER STRUCTURAL <br /> -FLOOR JOIST PER STRUCTURAL <br /> _ -R-38"BATT INSULATION(CAVITY) -R38"BATT INSULATION(CAVITY) <br /> EXISTING MIN,CRAWL SPACE MIN.CRAWL SPAC <br /> CONCRETE FOOTING NEW CONCRETE FOOTING <br /> TO REMAIN PER STRUCTURAL NEW CONCRETE FOOTING <br /> PER STRUCTURAL <br /> $ SHEET ND.: <br /> Section 7 +/<"_+,-°° ° ' 2 4 6 r; 2 4 6 <br /> Section 4 A4.o <br /> 1/4"=1'-0" 1/4"RR 1'-0" `�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.