Laserfiche WebLink
DUCT LINE EQUIVALENTS SYMBOLS GENERAL PIPING (CONTINUED) ABBREVIATIONS (CONTINUED) GENERAL NOTES (CONTINUED) <br /> N <br /> SINGLE LINE DOUBLE LINE DESCRIPTION SYMBOL ABBR DESCRIPTION 0 POC POINT of CONNECTION °o <br /> HC HEATING COIL <br /> �• 90' ELBOW UP(SUPPLY) ® PG PRESSURE GAUGE HORIZ HORIZONTAL 16. PROVIDE 1"THICK DUCT LINER IN RECTANGULAR RETURN DUCTWORK WITHIN <br /> AD ACCESS DOOR IN CEILING HP HORSEPOWER FIVE FEET OF AIR TERMINAL UNITS, PROVIDE 1"THICK DUCT LINER IN <br /> �e HT HEAT TRACE <br /> 90' ELBOW UP(RETURN/EXHAUST) ROLLING 45 DOWN HVAC HEATING,VENTILATING,AND AIR CONDITIONING RECTANGULAR TRANSFER AIR DUCTWORK, UNLESS NOTED OTHERWISE. <br /> AD ACCESS DOOR IN WALL EX HEAT EXCHANGER <br /> �-7 90' ELBOW DOWN(SUPPLY) REDUCER ID INDIRECT DRAIN/INSIDE DIAMETER 17. OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO PENETRATION OF ANY <br /> OP XX'-Xx' BOP BOTTOM OF PIPE ELEVATION REDUCING CONCENTRIC STRUCTURAL ELEMENT, IF PENETRATION IS NOT SHOWN ON STRUCTURAL <br /> �a 90' ELBOW DOWN(RETURN/EXHAUST) KW KILOWATT DRAWINGS. <br /> CENTERLINE REDUCING ECCENTRIC <br /> �-t RADIUS ELBOW UP(SUPPLY) L 18. PROVIDE SEISMIC RESTRAINTS AND ANCHORAGE PER SMACNA AND THE BUILDING <br /> CL-EL CENTERLINE OF PIPE ELEVATION � DRAWING NOTE DESIGNATION LB <br /> LEAVING AIR TEMPERATURE <br /> POUND CODE FOR MECHANICAL SYSTEMS, REFERENCE STRUCTURAL. MECHANICAL <br /> Z_ LLLj' RADIUS ELBOW UP(RETURN/EXHAUST) LWT LEAVING WATER TEMPERATURE CONTRACTOR SHALL INDICATE IF A DEFERRED SUBMITTAL FOR PERMITTING IS <br /> SLEEVE REQUESTED. <br /> RADIUS ELBOW DOWN SUPPLY X MBH THOUSAND BTU PER HOUR <br /> (SUPPLY) DETAIL oR ENLARGED PLAN, NUMBER FOR T� o <br /> TEE DOWN MECH MECHANICAL <br /> X-X DETAIL, LETTER FOR ENLARGED PLAN TAG MOD MOTOR OPERATED DAMPER 19. GENERAL CONTRACTOR SHALL PROVIDE CUTTING, FRAMING, PATCHING,SEALING <br /> RADIUS ELBOW DOWN (RETURN/EXHAUST) TEE MITI) MOUNTED AND PAINTING OF WALLS,CEILING AND FLOOR OPENINGS.THIS INCLUDES <br /> • ��• ROUND DUCT UP (S/R/E) NO NORMALLY CLOSED/NOISE CRITERIA OPENINGS THOUGH AREA SEPARATION WALLS. <br /> A TH THERMOMETER NIC NOT IN CONTRACT <br /> NO NORMALLY OPEN/NUMBER 20. WHEN SWITCHBOARDS, PANEL BOARDS,OR MOTOR CONTROL CENTERS ARE <br /> ' ROUND DUCT DOWN (S/R/E) X DETAIL/SECTION CALL-OUT NTS NOT TO SCALE LOCATED IN MECHANICAL ROOMS, PROVIDE A CLEAR ZONE OF 42 INCHES IN <br /> OBD OPPOSED BLADE DAMPER FRONT OF THE EQUIPMENT. NO MECHANICAL EQUIPMENT FROM FLOOR TO <br /> TURNING VANE ELBOW U UNION OC ON CENTER CEILING CAN BE LOCATED IN THIS CLEAR ZONE, OR ABOVE THE EQUIPMENT <br /> OD OUTSIDE DIMENSION OR DIAMETER FOOTPRINT. REFERENCE ELECTRICAL DRAWINGS FOR LOCATIONS. <br /> • VERTICAL SLEEVE OSA OUTSIDE AIR <br /> RADIUS ELBOW, RECT FEF--Xl EQUIPMENT MARK TYPE - (EC"EF FOR EXHAUST VALVE IN PIPE RISE OR DROP PD PRESSURE DROP/PUMPED DRAIN 21. CONTRACTOR SHALL COMPLY WITH TENANT GUIDELINES AND STANDARDS, ~ <br /> � <br /> FAN)THEN UNIQUE IDENTIFIER "X" + PIE PLENUM INCLUDING BUT NOT LIMITED T0: BUILDING MATERIALS, EQUIPMENT AND �. <br /> POD POINT OF CONNECTION FIXTURES. <br /> O DIFFUSER/GRILLE DESIGNATION -TYPE "-"TO RA RETURN AIR 22. PROVIDE 30-DEG BOOT OR CONICAL TEE FOR MEDIUM PRESSURE BRANCH DUCT O <br /> STIR WYE TYPE STRAINER PT POST-TENSION SLAB <br /> RADIUS ELBOW, ROUND XXX MATCH SCHEDULE THEN "XXX"FOR CFM WYE TYPE STRAINER WITH VALVE AND <br /> ry HOSE END REV REV SION INDICATED ON DRAWINGS. <br /> REF REFERENCE CONNECTIONS. A NOT USE STRAIGHT TEE FITTINGS UNLESS SPECIFICALLY LL <br /> WINGS. <br /> FLOW ARROW RE RELIEF FAN <br /> AAV AUTOMATIC AIR VENT PH RELATIVE HUMIDITY <br /> ( / IE xx'-xx' BFW BOILER FEED WATER RV REFRIGERANT VENT 23. PROVIDE AIR VENTS AT HIGH POINTS IN HYDRONIC PIPING IF EXISTING VENTS of aaaaaaa 11�2 TRANSITION ROUND To ROUND - z <br /> RECTANGULAR TO RECTANGULAR) 0 IE INVERT PIPE ELEVATION -BFW- DO NOT MEET THIS REQUIREMENT. PROVIDE DRAIN VALVES AT HYDRONIC PIPING <br /> p BUCKET STEAM TRAP SA SUPPLY AIR LOW POINTS <br /> ?T2 TRANSITION (RECTANGULAR TO ROUND) PITCH SENS SENSIBLE <br /> Z PITCH LEFT CA CA CONTROL AIR SF SUPPLY FAN SQUARE FOOT <br /> SL SOUND LINE INSIDE DUCT INSULATION 24. PROVIDE FLANGES OR UNIONS AT PIPING CONNECTIONS TO EQUIPMENT,COILS, <br /> ) <br /> RECT SPIN-IN TAKEOFF PILCH -CHR- CHR CHILLED WATER RETURN SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION TRAPS,CONTROL VALVES AND OTHER COMPONENTS TO ALLOW FOR <br /> ROUND-► PITCH RIGHT SP STATIC SS STAINLESS SSURE MAINTENANCE. <br /> CHS CHS CHILLED WATER SUPPLY ST SOUND TRAP <br /> DRAWING NOTE DESIGNATION -CR- CR CONDENSER WATER RETURN 25. PROVIDE DIELECTIC NIPPLES AT CONNECTIONS WITH DISSIMILAR MATERIALS. <br /> ROUND CONICAL TEE TCV TEMPERATURE CONTROL VALVE Y <br /> ROUND ► T=. -CS- CS CONDENSER WATER SUPPLY TDH TOTAL DYNAMIC HEAD 26. PROVIDE PRESSURE AND TEMPERATURE TEST PORTS AT SUPPLY AND RETURN <br /> TOP OF DUCT, BOTTOM OF DUCT TOD TOP OF DUCT PIPING CONNECTIONS TO EQUIPMENT. <br /> B=� TOS TOP OF STEEL <br /> FLANGE Y <br /> TEE WITH TURNING VANES TP TOTAL PRESSUREcc <br /> FLEX TSP TOTAL STATIC PRESSURE 27. SIZE BALANCING/MEASURING VALVES IN ACCORDANCE WITH MANUFACTURER'S Y IH Q <br /> TOP TOP OF PIPE ELEVATION TYP TYPICAL INSTRUCTIONS. DO NOT PROVIDE VALVES LARGER THAN LINE SIZE. LU Z EL <br /> FLOAT AND THERMOSTATIC STEAM TRAP LED UPBLAST DISCHARGE W W Y M <br /> BRANCH TAKEOFF, RECT -FOR- FOR FUEL OIL RETURN UH UNIT HEATER c> LU W O <br /> -FOS- FOS FUEL OIL SUPPLY UNO UNLESS NOTED OTHERWISE g (� V 00) <br /> 0 Co <br /> VA VALVE <br /> CONTROLS -FQV_ FQV FUEL OIL VENT VAV VARIABLE AIR VOLUME Eo J J JQ <br /> VD VOLUME DAMPER VICINITY MAP <br /> RECT BRANCH TAKEOFF, ROUND -G- G NATURAL GAS VENT VENTILATION/VENTILATOR II <br /> ROUND CC <br /> -►,�F (J PI PRESSURE INDICATOR VEL VELOCITY d � W <br /> -HCR- NOR HIGH PRESSURE CONDENSATE RETURN W Ifr I. <br /> W INSULATED DUCT WATT WIDE LEGAL DESCRIPTION W I. <br /> it TI TEMPERATURE INDICATOR / / r2 0 W <br /> RECT HG HG HOT GAS WB WET BULB (TEMPERATURE) SEC 02 TWP 28 RGE 04LOT 7 OF INTRACORP-SEAWAY ESP REC AF NO 9607305004 o C..� Q bu <br /> BRANCH TEE, RECT © TS TEMPERATURE SENSOR WG WATER GAUGE CORR PER AF NO 9610040439 BEING A PTN OF W1 2 SE1 4 TGW EQUAL&UND INT C Q W <br /> -HPS- HPS HIGH PRESSURE STEAM WT WEIGHT / / N = "a W <br /> 6 IN TRA&TRB mWW <br /> T a T WALL MOUNTED TSTAT WITH CONTROL LINE -HWR- HWR HEATING WATER RETURN ° r = .o <br /> RECT CONICAL SPIN-IN TAKEOFF -HWS- HWS HEATING WATER SUPPLY PARCEL NUMBER o_ a <br /> 28040200401100 <br /> ROUND ABBREVIATIONS GENERAL NOTES o <br /> BOOT TEE PIPING z <br /> ROUND-► AC AIR CONDITIONING UNIT 1. THE MECHANICAL SCOPE OF WORK SHALL INCLUDE WORK INDICATED ON DRAWINGS. g <br /> SYMBOL ABBR DESCRIPTION ARE ABOVE FINISHED FLOOR <br /> AHU AIR HANDLING UNIT 2. VERIFY EXISTING CONDITIONS BEFORE COMMENCING WORK ON AN EXISTING V <br /> o 45' LATERAL 45'ELBOW AMS AIRFLOW MEASURING UNIT MECHANICAL SYSTEM. <br /> 2� c 45'DOWN B BOILER m 3. VERIFY LOCATIONS AND DIMENSIONS OF EQUIPMENT AND COORDINATE WORK PRIOR TO b 45'CONICAL LATERAL BOD B FT DAMPER d <br /> 90'ELBOW BOD BOTTOM <br /> of DUCT START OF CONSTRUCTION. <br /> o UP ROT BOTTOM AREA OF WORK <br /> q 4. COORDINATE MECHANICAL WORK WITH OTHER TRADES TO INSURE PROPER AND "!��" > <br /> _ STUB BRITISH THERMAL UNIT PER HOUR E <br /> = R � ELEVATION CHANGE C ON DOWN ADEQUATE INTERFACE OF THEIR WORK WITH THE WORK OF THIS CONTRACTOR. p <br /> P R RISE(R)OR DROP (D) CC COOLING COIL INSTALL MECHANICAL WORK AS HIGH AS POSSIBLE,TIGHT TO STRUCTURE ABOVE. Z <br /> ALIGNMENT GUIDE CFM CUBIC FEET PER MINUTE <br /> Ii AIR FLOW DIRECTION -SUPPLY CHLR CHILLER 5. ELEVATIONS ARE REFERENCED FROM FINISHED FLOOR, UNLESS NOTED OTHERWISE. 5 E <br /> X ANCHOR CLG CEILING <br /> AI RETURN OR EXHAUST R FLOW DIRECTION - CNTFGL CENTRIFUGAL 6. THE MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT ATTEMPT To `. <br /> COND CONDENSER/CONDENSATE SHOW ALL REQUIRED OFFSETS. REFER To ARCHITECTURAL AND STRUCTURAL <br /> AUTOMATIC CONTOL VALVE(3-WAY) CP CIRCULATING PUMP C.7 <br /> a-� DUCT END CAP CT COOLING TOWER DRAWINGS FOR CONSTRUCTION DETAILS. <br /> AUTOMATIC CONTROL VALVE 2 WAY Cu CONDENSING UNIT/CUBIC 7. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR <br /> FLEXIBLE DUCTWORK (- ) CV CONSTANT VOLUME ELECTRICAL PANELS AND EQUIPMENT. OFFSET MECHANICAL WORK AS REQUIRED. - �p <br /> 1 MANUAL VOLUME DAMPER CWP CHILLED WATER PUMP NORTH ARROW <br /> BALANCING VALVE D DRAIN 8. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING <br /> c R DB DRY BULB/DECIBEL CONSTRUCTION. <br /> 1 2 REMOTE VOLUME DAMPER �l� BV BALL VALVE DEG DEGREE FSID <br /> FSD DIA DIAMETER 9. DUCTWORK SIZES SHOWN ARE INSIDE CLEAR. ADD APPROPRIATE DIMENSION FOR - <br /> m BFV BUTTERFLY VALVE D DAMPER "FIRE/SMOKE DAMPER - PROVIDE ACCESS DIN MECHANICAL INDEX OF DRAWINGS <br /> FIRE N DOWN INSULATION OR DUCT LINER TO OBTAIN 'TOTAL DUCT SIZE. <br /> FD FID CHK CHECK VALVE EA EXHAUST AIR 10. INSTALL COMBINATION FIRE/SMOKE DAMPERS AT LOCATIONS WHERE DUCTS PENETRATE $HEFT DESCRIPTION r <br /> ?Td FIRE DAMPER - PROVIDE ACCESS GAS COCK EAT ENTERING AIR TEMPERATURE FIRE/SMOKE RATED WALLS. DAMPER FIRE RATING SHALL BE 1-1/2 HOUR UNLESS <br /> MOD ECONO ECONOMIZER NOTED OTHERWISE. COORDINATE DAMPER ACCESS WITH GENERAL CONTRACTOR AND Additional Permits Are Required <br /> /--�-�� EDH ELECTRIC DUCT HEATER ELECTRICAL CONNECTIONS WITH ELECTRICAL CONTRACTOR. MO.01 LEGEND,DRAWING INDEX AND GENERAL NOTES FOr This PfOjeCt TO Include: <br /> MOTOR OPERATED DAMPER GLOBE VALVE EER ENERGY EFFICIENCY RATIO MO.02 SCOPE OF WORK AND CODE SUMMARY <br /> �l EF EXHAUST FAN 11. PROVIDE REMOTE ACTUATED DAMPERS FOR VOLUME DAMPERS OVER INACCESSIBLE M1.01 MECHANICAL SCHEDULES AND DESIGN CRITERIA []Plumbing <br /> n BDD pgpp GV GATE VALVE ELEC ELECTRIC CEILINGS AND SOFFITS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. E] Sprinkler <br /> BACKDRAFT DAMPER ELEV ELEVATION M1.02 MATERIALS (]Mechanical <br /> � ESP EXTERNAL STATIC PRESSURE <br /> PRV PRESSURE REDUCING VALVE 12. PROVIDE TRANSITIONS AS REQUIRED TO CONNECT DUCTWORK TO AIR TERMINAL UNITS, M2.RF ROOF-MECHANICAL PLAN E] Fire Alarm <br /> i EWT ENTERING WATER TEMPERATURE M4.01 MECHANICAL DETAILS ❑X Electrical <br /> - 2 � 2 HUMIDIFIER � EXH EXHAUST FANS,AND OTHER MECHANICAL EQUIPMENT. <br /> RV RELIEF VALVE EXT EXTERIOR/EXTERNAL Permit#: M2403-037 <br /> a 13. COORDINATE EXACT LOCATIONS OF ROOM THERMOSTATS AND/OR ROOM TEMPERATURE Site Address: 1920 Merrill Creek Pkwy <br /> ® FCU FAN COIL UNIT SENSORS WITH ARCHITECT PRIOR TO INSTALLATION. MOUNT WALL THERMOSTATS AT 48" <br /> SV SOLENOID VALVE FD FIRE DAMPER FLOOR DRAIN Owner: BPP PACIFIC INDUSTRIAL WA REIT Drawn B UMC <br /> SUPPLY GRILLE OR DIFFUSER / AFT PER MOST RECENT VERSION OF ADA. y <br /> _ w^ FLTR FILTER OWNER 1 <br /> NEEDLE ISOLATION VALVE <br /> RETURN EXHAUST GRILLE FPM FEET PER MINUTE 14. PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN,AND EXHAUST OPENING ADD.Date: 3/13/2024 Checked By RVK <br /> / FSD FIRE SMOKE DAMPER Description:AUTOMATIC INTERLOCKED ET FEET AND C BRANCHES WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE _------ Replacing(7)---- And(--Mau_ <br /> 0 ROUND DUCT 11 T 2-WAY BUTTERFLY VALVE FTU FAN TERMINAL UNIT BRANCH AND ELSEWHERE AS NOTED ON THE DRAWINGS. -- __ _ _ _ ___ ___ ________ Original Issue Date 09/29/2023 <br /> FV FACE VELOCITY Review Status: Approved by Building,C.Bearman Job No. 9120 <br /> BREAK 15, PROVIDE N THICK DUCT LINER IN RECTANGULAR SUPPLY AIR OTHERWISE. <br /> WITHIN FIVE Review Date: 6/14/2024 <br /> GALV GALVANIZED FEET DOWNSTREAM OF AIR TERMINAL UNITS UNLESS NOTED OTHERWISE. <br /> Office of Community,Planning& Development L CAP GPM GALLONS PER MINUTE Scale NONE <br /> OWE GYPSUM WALLBOARD <br /> City of Everett Permit Review <br /> PLANNING DEPARTMENT F- PLUG Sheet No. <br /> NAME: Jessica Jarvi EVERETT Status:Reviewed for Permit <br /> DATE: 06/26/2024 "•,""'," A O.0 1 <br /> 1 <br /> 06/14/2024 3:24:34 PM <br />