Laserfiche WebLink
DEMO EX 2" FUEL <br /> LINES IN TRENCH <br /> DEMOLITION NOTES <br /> D _ E <br /> 1. CONTRACTOR TO LOCATE ALL EXISTING <br /> TRENCH LIMITS, SEE SAWCUTTING LIMITS UTILITY LINES PRIOR DEMOLITION, SEE <br /> 3= NOTE 3 — C7.4 FOR PROFILE DETET AILS. <br /> d I F EX UPLAND 2. DEMOLITION OF EX GAS AND DIESEL LINES <br /> IL DEMOLISH CURB 0 TRANSITION SUMP SHALL ° OCCUR UNTIL PROPOSEDEL <br /> _3-3-3-3 <br /> FLOAT IS CONSTRUCTED AND NEW FUEL <br /> w N E E E E E LINES ARE IN PLACE AND OPERATIONAL. <br /> H <br /> a 3 PROTECT—IN—PLACE CAP EX FUEL FLOAT DECK 4x8 RUB BOARD <br /> .. N co O— o o LINES AT TRENCH —E E 3. SEE SHEETS C7.3 AND C7.4 FOR <br /> •5 N EX UTILITY LINES, 2' <br /> TRENCHING, FUEL LINE INSTALLATION AND <br /> LIMITS /f RESURFACING DETAILS. <br /> w� � Evr <br /> 1 ff �N " <br /> O 7 C) <br /> y� o <br /> U y 3/4" x 4 1/2" GALV. STUD <br /> 'Jc FCS I VS T W/P.W., L.W., & H.N. <br /> PROTECT—IN—PLACE B C O LEGEND <br /> EX ABOVE 1*1 <br /> GROUND FUEL c c �c <br /> CONTROLS <br /> I DEMOLITION ITEM <br /> 14 <br /> E E E E E E E E E PROTECT—IN—PLACE E <br /> EX UTILITY DEMOLISH FULL LINE <br /> C _ "' VAULTS, TYP DEMOLISH RUB <br /> CONCRETE SIDEWALK LIMITS <br /> u \ I 3/4" S.S. LOOP INSERT BOARD ——— UTILITY TRENCH LIMITS <br /> L INCLUDING 1' OFFSET FOR \ <br /> REINFORCED CONCRETE J ASPHALT CONCRETE SAWCUT LIMITS <br /> Z_INTEGRATION, SEE DEMO L n < <br /> PHOTOS AND STRUCTURAL u ABANDON EX GAS AND PHOTO ORIENTATION AND LOCATION, <br /> A P�PETE DIESEL LINES BETWEEN L Px SEE DEMO PHOTOS ON SHEETS <br /> L L UTILITY CAPS D2.1—D2.3 <br /> 3 <br /> P15 <br /> 0 <br /> 0 <br /> SHEET PILE PILE CAF RUB BOARD DEMOLITION <br /> oI P18 <br /> DEMO EX 2" FUEL I BULKHEAD D1.1 D3.1 SCALE: NTS <br /> �I <br /> s LINES • w • CAP EX 2" FUEL <br /> o LINES AT PILE 3731 <br /> °' ACCESS CAP PENETRATION <br /> w GATE 1 <br /> 1 UPLAND TRENCHING AND DEMOLITION <br /> D1.1 D3.1 SCALE: 1"=5' <br /> w <br /> 0 <br /> � 5' 6_0���' 10, <br /> PAVEMENT CONTROL PUNTS 2" MINIMUM <br /> o z.5' 7.5' <br /> o; POINT # NORTHING FASTING ELEVATION <br /> SCALE: 1" = 5' <br /> OA 367551.4945 1300384.64 FG— <br /> 0 A <br /> -Ef <br /> O 367566.5706 1300385.175 FG= F <br /> �`_, © 367566.3533 1300391.171 FG= <br /> i <br /> 3 <br /> OD 367587.3926 1300391.915 FG= <br /> o OE 367586.8405 1300409.519 FG= FILL END OF EXISTING <br /> �2 PIPE WITH GROUT <br /> o O 367582.5152 1300409.375 FG= CUT PIPE WHERE <br /> o © 367582.9314 1300397.605 FG= INDICATED ON PLANS <br /> c_ <br /> OH 367581.1567 1300395.699 FG— <br /> O 367559.63 1300394.929 FG— 2 PIPE PLUG <br /> D3.1,D1.1 D3.1 SCALE: NTS <br /> E OJ 367559.8477 1300388.946 FG= <br /> OK 367551.3544 1300388.644 FG= IF SHEET IS LESS THAN 22x34 <br /> E <br /> v REDUCE SCALE ACCORDINGLY <br /> c�w PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. D3 1 — <br /> - � 04*ess�gl N. WATSON AS SHOWN <br /> ti DESIGNED BY: DATE: <br /> Port of =g'~� �'� H. PETERSON 04/11/2023 CENTRAL MARINA FUEL DOCK CIP NO. <br /> 1qEVERETT 2-0-073-01 <br /> DRAWN BY: CHECKED BY: C <br /> 1601 5th Avenue,Suite 1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> N P.O. BOX 538 Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11 APPROVED BY: DEMOLITION DETAILS N MR—CM-2023-01 <br /> EVERETT, WA 98206 <br /> °= (206)382-0600 Fax(206)382-0500 LA <br /> o/ (425) 259-3164 W <br /> PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 15 OF <br /> a <br />