My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
610 14TH ST 2023 Plans 2025-03-28
>
Address Records
>
14TH ST
>
610
>
Plans
>
610 14TH ST 2023 Plans 2025-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:32:29 AM
Creation date
3/28/2025 9:29:23 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
610
Permit
PW2305-004
Year
2023
Notes
REPLACE EXTG FUEL DOCK WITH NEW, ADD ON-DOCK KIOSK, RESTROOM
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EX GANGWAY 4 <br /> j EX STEEL PILE, TYP „t <br /> GATE 1 { #a " GATE 2 <br /> �.� <br /> CLUB <br /> YACHT EX BULKHEAD <br /> I CLUB <br /> E rLi <br /> a <br /> a ACCESS PIER I ACCESS PIER <br /> d N M <br /> y N CD ° <br /> w� 00 <br /> c 3 I EX MARGINAL <br /> y m A—WEST EX TIMBER FLOATS 1 AND 2 <br /> U y I I PARALLEL PILE, TYP <br /> W <br /> z I <br /> W� z <br /> IJ Q <br /> CENTRAL <br /> w oz IGUEST DOCK 4 <br /> W I I <br /> o w I I LEGEND: <br /> 0 <br /> I I N I EXISTING FUEL FILL DISPENSER <br /> o I 24' EXISTING POTABLE WATER SPIGOT <br /> EXISTING LIGHT POLE <br /> X I FDC, TYP R EXISTING FIRE DEPARTMENT CONNECTION <br /> I I <br /> EXISTING POWER METER <br /> o Q I I i 21' I _ EXISTING SEWER PUMP STATION <br /> I I I I CENTRAL MARINA EXISTING BULKHEAD <br /> U <br /> 21 <br /> N I EXISTING STEEL PILE <br /> y I <br /> NI I I EXISTING TIMBER PILE <br /> I I I WORK AREA LIMITS (PHASE 1 AND 2) <br /> I I <br /> " I <br /> �I <br /> II � <br /> 0 <br /> o I32' <br /> o I 00 <br /> N I <br /> I <br /> 94' 108' <br /> 41' I EX FUEL FLOAT0 PARCEL N I N N <br /> N <br /> BOUNDARY,P — — —I 24' I ,24' 24' <br /> o I <br /> I <br /> I <br /> 22' <br /> CENTRAL GUEST DOCK 3 I FLOAT A 35' <br /> FLOAT B I ° FLOAT C FLOAT D <br /> PHASE 1 AND PHASE 2 <br /> o COMBINED WORK LIMITS, SEE <br /> 2 SHEETS G4.1 AND G4.2 FOR <br /> o, I PHASED LIMITS OF WORK <br /> L _ <br /> o — - - _ <br /> o— <br /> EXISTING CONDITIONS SITE PLAN 40' ° 40' 80' <br /> G2 1 G2.2 SCALE: 1" = 40' 20' 60' <br /> E SCALE: 1`40' IF SHEET IS LESS THAN 22x34 <br /> v REDUCE SCALE ACCORDINGLY <br /> c�w PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. N0. G2 2 — <br /> I � o>:*ess�gl� N. WATSON AS SHOWN � <br /> ti DESIGNED BY: DATE: <br /> Port of ig'~� �'� ES PETERsoN DATE 2023 CENTRAL MARINA FUEL DOCK CP NO. <br /> 1TffEVERETT 2-0-073-01 <br /> DRAWN BY: CHECKED BY: C <br /> 1601 5th Avenue,Suite 1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> EXISTING CONDITIONS SITE PLAN N° W <br /> N P.O. BOX 538 Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11 APPROVED BY: MR-GM-2023-°1 <br /> EVERETT, WA 98206 <br /> °=� (206)382-0600 Fax(206)382-0500 A <br /> o/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 05 OF A <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.