Laserfiche WebLink
wi WORK OUTSIDE WORK <br /> AREA LIMITS <br /> PEDESTRIAN ACCESS TO EX LEGEND <br /> FUEL FLOAT VIA GATE 1 <br /> SECURE DEBRIS BOOM <br /> TO EX BULKHEAD <br /> EXISTING BULKHEAD <br /> F <br /> d I i _ ~�� TESC DEBRIS BOOM ca.1 c5.1 <br /> d `q` GATE 1' <`" '�,a GATE 2 <br /> K a ce) I WORK AREA LIMIT <br /> �n <br /> d a EX YACHT EX BULKHEAD <br /> a 3 <br /> � M CLUB <br /> , N <br /> O <br /> w y N I CONTRACTOR SHALL <br /> c 3 � PROVIDE PEDESTRIAN I NOTES <br /> «_ '6 c ACCESS TO EX FUEL FLOAT ° <br /> U y I DURING CONSTRUCTION I 1. CONTRACTOR SHALL MODIFY BOOM LAYOUT TO PROVIDE ACCESS TO EXISTING <br /> 'J I FUEL FLOAT DURING INSTALL OF NEW FUELING SYSTEM. UPON COMPLETION OF <br /> W; NEW FUELING SYSTEM, CONTRACTOR SHALL ADJUST TESC MEASURES TO ALLOW <br /> w' I FOR EXISTING FUEL FLOAT MODIFICATIONS WHILE PROVIDING ACCESS TO NEW <br /> FUEL FLOAT FOR THE MARINA. <br /> WORK OUTSIDE <br /> z WORK AREA LIMITS 2. CONTRACTOR SHALL COORDINATE TIMING AND DURATION OF WORK OUTSIDE OF <br /> SEE NOTE 2 I WORK LIMITS WITHIN PORT. <br /> zA-WEST <br /> C z PARALLEL <br /> Of <br /> � ! <br /> > U CENTRAL <br /> GUEST DOCK 4 <br /> o w I � I <br /> 0 o J <br /> Q <br /> w <br /> o a <br /> o CONTRACTOR SHALL <br /> PHASE WORK TO <br /> w PROVIDE CONTINUOUS <br /> ¢I <br /> ACCESS TO FUELING FOR <br /> THE MARINA, SEE NOTE 1 <br /> �I I <br /> o <br /> 0 I <br /> I <br /> I <br /> c> I <br /> EX FINGERS TO BE <br /> REMOR BY <br /> OWNER. <br /> i <br /> o EX FUEL FLOAT <br /> 2 LOCATE TESC DEBRIS BOOM <br /> i WITHIN WORK LIMITS� - <br /> I I <br /> o, <br /> CENTRAL GUEST DOCK 3 I FLOAT A <br /> FLOAT B FLOAT C FLOAT D N <br /> 10 <br /> i <br /> 40' 0 40' 80' <br /> o �� 91' PHASE 1 WORK 20' 60' <br /> AREA LIMIT <br /> E SCALE: 1"-40' IF SHEET IS LESS THAN 22x34 <br /> v REDUCE SCALE ACCORDINGLY <br /> RN. WATSONENGINEER SCALE PORT OF EVERETT °W N G4 1 W <br /> - ���o>:*ess�gl� N. W AS SHOWN <br /> ti DESIGNED BY: DATE: <br /> Port of =g'~� �'� ES PETERsoN DATE 2023 CENTRAL MARINA FUEL DOCK CP NO. <br /> EVERETT1Tff 2-°-073-°' <br /> DRAWN BY: CHECKED BY: C <br /> 1601 5th Avenue,Suite 1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> TESC PLAN N W <br /> P.O. BOX 538 MR-CM-2023-01 <br /> c� Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11 APPROVED BY: <br /> EVERETT, WA 98206 <br /> °=� (206)382-0600 Fax(206)382-0500 q AA <br /> o/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION N0. DA7E BY REVISION PHASE 1 SHEET NO. 07 OF <br /> a <br />