Laserfiche WebLink
° NOTES <br /> 1. SEE SHEETS 31.2 AND G5.1 FOR TESC NOTES. <br /> 2. CONTRACTOR TO LOCATE LAYDOWN AND STOCKPILE AREAS <br /> 3= WITHIN PROJECT WORK AREA LIMITS AS NEEDED TO <br /> E 2 ACCOMPLISH WORK. <br /> (L <br /> a �n B 3. CONTRACTOR SHALL PLACE TEMP FENCING AND LIGHTED <br /> w N BARRELS ALONG ALL TRENCHING OUTSIDE WORK LIMITS. <br /> d� <br /> a 3 4. CONTRACTOR SHALL COORDINATE TIMING AND DURATION OF <br /> m•� N LL WORK OUTSIDE OF WORK LIMITS WITH PORT. CONTRACTOR <br /> CID SHALL MINIMIZE UPLAND DISTURBANCE. <br /> W N <br /> 0 3 m 5. CONTRACTOR TO LOCATE ALL STORM DRAINS WITHIN 100' <br /> a m C) OF TEMPORARY CONSTRUCTION FENCE AND PROVIDE INLET <br /> C1 W PROTECTION. <br /> 6. CONTRACTOR TO PROVIDE TRAFFIC DETOUR SIGNAGE AS <br /> W O NLET PROTECTION, O NECESSARY WHILE WORKING IN THE DRIVE AISLE.= L <br /> k TEMPORARY <br /> SEE NOTE 5, TYP <br /> CONSTRUCTION FENCE, <br /> L SEE NOTE 4 <br /> k L ® CHANNELIZING DEVICE, <br /> 79' TYP LEGEND <br /> 3 L <br /> SEE N TE 6 EHIC E REROU E, m m m m PROJECT WORK LIMITS <br /> S <br /> L <br /> k WORK OUTSIDE TEMPORARY CONSTRUCTION FENCE rJ <br /> WORK AREA LIMITS, SAWCUT LIMITS, SEE c4.3 c5.1 <br /> s SEE NOTE 4 ® 2 <br /> SHEET D3.1 FOR <br /> HORIZONTAL CONTROL ° INLET PROTECTION ca.3 c5.1 <br /> r———————— SEDIMENT 3 <br /> L\ I BARRIER, CONTRACTOR TO —�g��g` SEDIMENT BARRIER <br /> L <br /> r--- TYR LOCATE 64.3 G5.1 <br /> 3- 3 3 3 3 CONSTRUCTION <br /> E E E ACC SS GATE TEMPORARY CONSTRUCTION ACCESS <br /> 0 O 0 E E GATE <br /> M VP I ® o <br /> FCS 3 I VS T N -------- SAWCUTTING LIMITS <br /> _—J I ALKWAY <br /> L kL\ I cc 6' N.O �D PEDESTRIAN REROUTE WALKWAY <br /> °' L E E <br /> LL <br /> v 21 L PEDESTRIAN,REROUTE <br /> k LL k. k k\ k L L� ° L: L L PAT k WHEN ` k F VEHICLE REROUTE <br /> k k L d L <br /> a NECESSARY,�l P °\ Q <br /> w L Q L Q \ Q L \ L Q L L \ Q L �J L L L \ L L\ QO: <br /> CHANNELIZING DEVICE <br /> G4.3 G5.1 <br /> w <br /> 0 <br /> w <br /> 12 1 <br /> o • • CONTRACTOR TO <br /> CONTRACTOR SHALL 4 <br /> LOCATE STOCKPILE <br /> i PROVIDE PEDESTRIAN Ga.3 G5.1 <br /> ACCESS TO EX FUEL FLOAT AREA WITHIN FENCE <br /> DURING CONSTRUCTION LIMITS 1 <br /> � w 1 <br /> AA NF�AA <br /> 0 <br /> j E E E E E E E E E E--f—E E E E <br /> FW <br /> N <br /> o <br /> 1 WORK OUTSDIE OF WORK AREA LIMITS <br /> G4.1 G4.3 SCALE: 1" = 10' <br /> 10' 0 20' 40' <br /> EaMEMO II <br /> 10' 20' <br /> E` SCALE: 1`10' IF SHEET IS LESS THAN 22x34 <br /> REDUCE SCALE ACCORDINGLY <br /> RN. WATSONENGINEER SCALE PORT OF EVERETT °W N G4 3 W= - � o>:*ess�gl� N. W AS SHOWN <br /> ti DESIGNED BY: DATE: <br /> Port of =g'~� �'� ES PETERsoN 04/11/2023 CENTRAL MARINA FUEL DOCK GIP NO. <br /> EVERETT1Tff 2-°-073-°' <br /> DRAWN BY: CHECKED BY: C <br /> 1601 5th Avenue,Suite 1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> / P.O. BOX 538 TESC PLAN IN TEMPORARY NO. MR—CM-2023-01 <br /> c� Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11 APPROVED BY: <br /> °= <br /> EVERETT, WA 98206� (206)382-0600 Fax(206)382-0500 LLI <br /> p/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION UPLAND WORK ZONE SHEET NO. 09 OF a <br /> a <br />