Laserfiche WebLink
TBLOCK TBLOCK-ec PTN. OF SW 1/4,SE 1/4 OF SEC 14,Till28 N, R4E W.M. <br /> Q 2 <br /> N <br /> m HI <br /> n 2' 2' <br /> N <br /> N <br /> w D; 18"MIN. 12"COMPACT <br /> No DEPTH QUARRY SPALLS o <br /> 40 ROCK LINED Ft�y o 2 1 <br /> � <br /> N - NOTES: \� _ TYPE 11 QUARRY SPALLS zo w <br /> CI'm 1.EARTH OR GRASS LINED DITCHES MAY ONLY BE USED WITH PRIOR APPROVAL OF THE \\ A B h y <br /> <• COUNTY INSPECTOR AND WHERE LONGITUDINAL SLOPES OF 6%OR LESS AND A MAXIMUM /�/\//\//\/\ \ L e w <br /> FLOW VELOCITY OF 5FPS EXISTS. \'�\��\//��/\//\// / APPROX LIMIT OF GRADING a, <br /> )RK AREA <br /> 2 ROCK GREATER 3% SHALL BE USED IN EARTH OR GRASS LINED DITCHES FOR SLOPES ��VA�AA����\//� ROADWAY IMPROVEMENTS WVARIES <br /> ? a m <br /> CHECK DAM SPACING <br /> J.ROCK LINED DITCHES SHALL BE USED WHEN SLOPES EXCEED 6%OR FOR FLOW VELOCITY PER PLAN <br /> GREATER THAN 5FPS. L=THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION IW z m <br /> MAINTENANCE STANDARDS: a CONTINUOUS ORANGE <br /> o CONSTRUCTION FENCING(ORANGE <br /> CONSTRUCTION FENCE, <br /> ANY SEDIMENT mEPOS1T10N OF MORE THAN 0.5 FEET SHALL BE REMOVED SO THAT THE CHANNEL a PLASTIC)AT EXIST. GRADE UPSLOPE AND TENSAR DR EQUAL <br /> IS RESTORED TO ITS DESIGN CAPACITY. TEMP. DITCH OR DOWNSLOPE OF DISTURBED AREAS AND s I. <br /> SCALE, PER PLAN LEVEL AREAS ADJACENT TO SENSITIVE el a <br /> IF THE CHTHE PROBLEM ITY IS INSUFFICIENT FOR THE DESIGN STORM, R MUST A DETERMINED THE II TOMQUARRYAN SPILLS MUST COMPLETELY COVER ROUGH OR AREA TRACT BUFFER <br /> WHETHER THE PROBLEM IS LOCAL(E.G., A CONSTRICTION OR BEND)OR THE CHANNEL IS THE BOTTOM AND SIDES OF THE DITCH FINISHED GRADE <br /> UNDEROESIGNED. IF THE PROBLEM IS LOCAL, THE CHANNEL CAPACITY MUST BE INCREASED _ Z� 'v <br /> THROUGH CONSTRUCTION OF A BERM(S)OR BY EXCAVATION. IF THE PROBLEM IS UNDERDESIGN, \\ e 6"MAX. T EXIST. GRADE <br /> THE DESIGN ENGINEER SHALL BE NOTIFIED AND THE CHANNEL REDESIGNED TO A MORE \//\ /// ?,•� P <br /> CONSERVATIVE STANDARD TO BE APPROVED BY SNOHOMISH COUNTY. 4"MIN. Mqr c FFs TE\ \ \\// III III— ONAL Orl�7 <br /> THE CHANNEL SBALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND \/\\/ /\\/% FINISHED SLOPE, I`Y <br /> BANKS. IF SCOURING OR EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY \\\\\\\\\\\\\\\\\\\\\\\\\\\ \ice PER PLAN CLEARING LIMITS <br /> RIP-RAP OR AN EROSION CONTROL BLANKET OR NET. / /////,�///,�///,�///�///�///�///.� N01E <br /> ROCK CHECK DAM TIP. SILT FENCE AT EXIST. SEE NOTES ON ESC PLAN(SHEET C7.00) <br /> CROSS SECTION GRADE DOWNSLOPE OF FOR ADDITIONAL LIMITS FOR SILT FENCE METAL FENCE POSTS <br /> DISTURBED AREAS(SEE NOTE) LOCATION/PHASING. I_ 10'MAX _ OR WOOD STAKE <br /> TEMPORARY INTERCEPTOR DITCH ROCK CHECK DAM TYPICAL CLEARING LIMITS CONSTRUCTION FENCE (TIP.) <br /> NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE <br /> z <br /> Figure 11-3.30:Sediment Pond Riser Detail <br /> 3 <br /> 0 <br /> 0 <br /> Prwme aaegaate o <br /> Po"hylene cap slrepping =O <br /> Perforated Corrugated <br /> polyethylene drainage _____ metal riser <br /> tubing,diameter min. _==- LIJ <br /> 2'largerthan ___- r\/ <br /> dewatean9 or'flce. 3.5 m'n. LL <br /> Tubing shall comply = Watertight I D—hniing oaf e. <br /> Wit,ASTM F667 and _-_-_-_ -upling schedule 40 steel W <br /> AASHTO M294. Tack weld stub min.diiameler <br /> per celwlatbns <br /> 6'MIN. <br /> 6•m1n. 12"MIN. (J J <br /> f---" 12"MIN. J <br /> 18'min. T TACK <br /> T _ 12"MIN.Conmete base llernat ely,metl 'slakes andremaybe M / Wacedmpre"antnmatonNATIVE SOI 2"TO 4"ROCKaser dia.min. COMPACTEDL J U U+ <br /> 3/a"TO 1Y2"WASHED GRAVEL z m W <br /> GEOTEXTILE LI..I a ~ <br /> OUTLET m L <br /> U <br /> STABILIZE EXPOSED SIDE <br /> SLOPES WITH VEGETATION <br /> OR EQUIVALENT MEASURES CLIENT <br /> 12"MIN. OVERFLOW 4'MIN. TOP OF BERM PACIFIC RIDGE HOMES <br /> DEPTH(TYP.) SEDIMENT TRAP SUMMARY TABLE <br /> o NOT TO SCALE <br /> QUARRY SPILL PROTECTION 1792160THELL-EVERETT HWY <br /> AT OVERFLOW MINIMUM WATER <br /> W,S. ELEV. FACILITY NO. IMPERVIOUS(AC.) PERVIOUS(AC.) TOTAL(AC.) DESIGN Q,(CFS)+ SURFACE AREA W.S. ELEV. (FT.) BOT. ELEV. (FT.) SUITE 100 <br /> BOTHELL,WA 95012 <br /> (SF) PHONE:(425)438-6444 <br /> Sediment Pond Riser Detail �q i SED. TRAP <br /> po Revered June 2016 "�__ _ _ 12"MIN. 0.70 0.26 0.96 0.315 656 SEE PLAN SEE PLAN <br /> 3 DEPARTMENT OF �, ,�. 12"MIN' (NORTH) <br /> 2"TO 4"ROCK SED. TRAP <br /> ECOLOGY P��a�hrcpiwwwecywa.go pyagm.nmarnr opydgntnm ainolaaingparmisson:, J/"TO 1Y2"WASHED GRAVEL SOUTH 0.15 0.08 0.23 0.070 146 SEE PLAN SEE PLAN C P H <br /> State of Washington rmitation ofliability,and disclaimer. NON-WOVEN (SOUTH) <br /> ) <br /> " FILTER FABRIC <br /> '1 •Q2 FLOW RATE ARE THE 2-YEAR, 24-HOUR PEAK FLOWS DETERMINED BY USING WWHM 2012 MODELING. <br /> DISCHARGE TO STABILIZED .*THE DETENTION VAULT SHALL BE USED AFTER IT IS CONSTRUCTED AND THE STRUCTURAL ELEMENTS HAVE BEEN INSPECTED AND APPROVED FOR OPERATION. ONCE <br /> CONVEYANCE PATH OR OPERATIONAL, BOTH SEDIMENT TRAPS CAN BE REMOVED. CONSULTANTS <br /> APPROVED OUTLET PIPE i Site g g 2019 Stormwater Management Manual for Western Washington g•Civil Pn ineenn <br /> Lo�tlscapeA <br /> Volume 11-Chapter 3-Page 394 SECTION 1321B E IMt �Conwlting <br /> Skeet <br /> 90 <br /> TEMPORARY SEDIMENT TRAP IO Y 0hW�t&ea•A,2en'�85�;ta 3 <br /> s TEMPORARY EROSION CONTROL IS DESIGNED TO MEET FLOW CONTROL UTILIZING A SEDIMENT wenotonee.wa seeon lsosl2van3l <br /> ~ NOT TO SCALE <br /> f°lw TRAP, WHICH DOES NOT REQUIRE A RISER. ULTIMATELY, THE SEDIMENT AND FLOW CONTROL www.�pn�ooratranr:.�om <br /> WILL BE MITIGATED BY THE PROPOSED PERMANENT DETENTION VAULT. SIZING FOR PROTECT NO. <br /> a DEWATERING ORIFICE, PRINCIPAL SPILLWAY, EMERGENCY SPILLWAY, AND MINIMUM SEDIMENT 0132-21-026 <br /> N FLOW CONTROL SIZING ARE PROVIDED ON THIS SHT. THEY ARE PROVIDED FOR THE FINAL <br /> CONFIGURATION USING THE PERMANENT STORMWATER SYSTEM AND FOR THE TEMPORARY TRAP DRAWING <br /> iN IF A RISER IS REQUIRED DURING CONSTRUCTION DUE TO FIELD CONDITIONS. C1.101 <br /> v • CONTRACTOR/CESCL ARE RESPONSIBLE FOR DETERMINING APPROPRIATE EROSION CONTROL <br /> o� BMPS MODIFICATION AS NEED TO MEET ECOLOGY NPDES PERMIT REQUIREMENT.. <br /> a� 8h amers below. SHEET 6 OF 14 <br /> oG611 belOre ou tli. Copy Ot®] 3 CPH Consultants,LLC.All Rlghts ReserveE. <br />