My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
306 88TH ST SE 2023 Plans 2025-03-28
>
Address Records
>
88TH ST SE
>
306
>
Plans
>
306 88TH ST SE 2023 Plans 2025-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:17:57 AM
Creation date
3/28/2025 11:17:31 AM
Metadata
Fields
Template:
Address Document
Street Name
88TH ST SE
Street Number
306
Permit
B2307-055
Year
2023
Notes
REPAIR SFR DUE TO FIRE DAMAGE, GUT TO STUDS, REPLACE TRUSSES
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> gF <br /> N + <br /> N O <br /> O fp <br /> � O <br /> T O <br /> m � <br /> 1.EVERY ATTEMPT HAD BEEN MADE TO INSURE THE ACCURACY <br /> OF THESE DOCUMENTS,51TE CONDITIONS,PRODUCT AVAILABILITY, <br /> ETC.ALL INFORMATION LISTED ABOVE MUST BE VERIFIED PRIOR TO �'"� <br /> CONSTRUCTION AND FABRICATION.ANY CHANGES OR DEFICIENCIES <br /> ON OR TO THE PLANS MUST BE TRANSMITTED TO WOODWAY HOMES <br /> FOR WRITTEN APPROVAL. <br /> 2.INDICATED HARDWARE TO BE SIMPSON PRODUCTS,OR EQUALS. 6dR RE.I.�TEED3.THESE DRAWINGS ARE"AS-BUILT"DRAWINGS AND MAY NOT REFLECT <br /> EXACT MEASUREMENTS.CONTRACTORS AND SUBS TO FIELD VERIFY. <br /> ALL FASTENING: <br /> ALL FASTENING TO COMPLY WITH SCHEDULE -T_N oANlonfi <br /> 6TATE OF WA6HINOTON <br /> ON SHT.GC-2.0 AND CURRENT IRC&IBG <br /> -.-.-.- FRAMING: <br /> 1.FIRE AND DRAFT STOPS SHALL BE INSTALLED TO CUT OFF OPENINGS,HORIZONTAL <br /> AND VERTICAL,BETWEEN FLOORS,ATTICS,ETC. <br /> OVERFRAME i 2.NAILING SHALL COMPLY WITH LATERAL SPEC.&TABLE R602.3(1) SEE SHT GC-2.0 <br /> 2z6 HF#2#24"o.c. 3.FOUNDATION CRIPPLE WALLS SHALL BE FRAMED OF STUDS NOT LE55 THAN THE <br /> DOWN TO FLAT LAID O <br /> 2z6 h4#2 ON I ____ ____ ____ ___ ___ __J=- = STUD 51ZE ABOVE AND BE MIN.LENGTH OF 14",OR FRAMED STUD BLOCKING. <br /> ROOF 5HTG. I i WALLS GREATER IN HEIGHT THAN 4'SHALL BE FRAMED TO THE STUD SIZE <br /> REQUIREMENT OF AN ADDITIONAL STORY. U d <br /> �V• � ____ ___ _ ____ 4.END BEARING OF WOOD MEMBERS SHALL HAVE SUFFICIENT BEARING AREA C <br /> BASED ON ALLOWABLE VALUES FOR COMPRESSION PERPINDICULAR TO GRAIN. <br /> 5.PROVIDE SOLID BLOCKING OVER LOAD BEARING PARTITIONS,WALLS AND BEAMS. U <br /> 6.ANCHOR COLUMNS AND POSTS AT TOP AND BOTTOM WITH A POSITIVE AND M .N <br /> DIRECT CONNECTION FOR UPLIFT AND LATERAL FORCES. N r .� O Q <br /> U 7.ALL WOOD EXPOSED TO THE WEATHER SHALL BE PRESSURE TREATED,OR CEDAR. E U7 <br /> 8.PROVIDE GUARDRAILS 36"H.MIN.,WHEN DECKS AND PORCHES ARE MORE THAN d <br /> 30"ABOVE GRADE.SPACE INTERMEDIATE SUPPORTS SO A SPHERE 4"IN <br /> REMOVE AND REPLACE 6 TRUSSES & I I DIAMETER CANNOT PASS THROUGH.TOP RAIL SHALL WITHSTAND A HORIZONTAL <br /> pj N FORCE OF 20 PI.F APPLIED AT RIGHT ANGLES TO THE RAIL. <br /> ANY NECESSARY OVER FRAMING I I ® 9.ATTACH JOISTS TO FLUSH HEADERS OR BEAMS WITH SIMPSON'U'5ERIE5 OR �� o <br /> APPROVED EQUAL.. cc <br /> W 3 <br /> 5 LUMBER 'o <br /> c0 1.STUDS,JOISTS AND RAFTERS: C cp co <br /> HEM-FIR#2,BASE VALUE 75Fv,&50Fb,1.300,000 E �l <br /> �1 I 2.BEAM5 AND HEADERS: <br /> 1 I 4"-OF#2,BA5E VALUE 95Fv,875F6,1.600,000 E 2 <br /> 6"-OF#1,BASE VALUE 85Fv,1350Fb,1,600.00 E ,r <br /> ac I 5.POSTS AND TIMBER: b <br /> DF#1,4x 1450Fc,1,700.00 E <br /> OF#1,6x 1000Fc,1,600,00 E <br /> OVERFRAME 4.GLUE LAMINATED TIMBER: <br /> 2 6 H TO 0 24i.nioc 24F V4 DF/DF 165Fv 2400Fb 1,800,000 E <br /> w 2z h4#2 ON ROOF TRUSSES: <br /> ROOF 5HTG. 1.TRUSS DESIGN SHALL BE STAMPED BY A WASHINGTON STATE <br /> (1�1w1 I 5 I STRUCTURAL ENGINEER.EACH TRUSS SHALL BEAR QUALITY CONTROL STAMP, <br /> MFG PLANT,O ` 1St1 , 2.THE�TRUS5 LIVE LOAD NGIGN D HALL BE PER AND MAX. LING, <br /> VERFRAME _lZ <br /> u <br /> x <br /> IRC DEC.501.5 AND TABLE 301.5.ESPECIALLY <br /> _ <br /> 2z6 HF#2 0 24"DOWN TO FLAT LAID NOTING FOOTNOTES b AND <br /> 2z6 hP#2 ON I N I x 9' <br /> ROOF SHTG. ___ ____ _________ _ __ 3 THE TRUSS$NOW LOADING SHALL 15E PER <br /> WAS INGTON A550 IIATION OF BUILDING OFFICIALS <br /> WHITE PAPER 8-2010.OR BY IRC DEC.501.2.3 <br /> 4.THE TRUSS DESIGN SHALL BE PER IRC SEC.502.11.1 <br /> AND 802.10.2,ESPECIALLY INDICATING THE TRUSS <br /> DESIGN AND MNFG.SHALL BE PER AN51/TPI 1. <br /> 5.THE TRUSS TEMPORARY AND PERMANENT BRACING <br /> SHALL BE PER IBC SEC.502.11.2 AND 602.10.3 AS WELL A5 <br /> THE TRUSS PLATE INSTITUTE'5 BUILDING COMPONENT <br /> SAFETY INFORMATION. <br /> 6.TRUSS ALTERATIONS SHALL NOT OCCUR UNLESS UNDER THE 7 <br /> APPROVAL OF A DESIGN PROFESSIONAL AS INDICATED IN L <br /> IRC SEC.502.11.3 AND 802.10.4. <br /> 7.TRUSS DRAWINGS SHALL BE 5UBMITTED TO THE SLOG.OFFICIAL WITH TRUSS SHIPMENT <br /> AND APPROVED PRIOR TO INSTALLATION,PER 2018 IRC.502.11.4 AND 802.10.1 <br /> �Yd-TkUi (Nl fip�(,c p T6 (� I✓AL roP PlA% OR- 3E►v, T�� w <br /> SShtc,� <br /> CIA cW �No �✓ PO'Lifo1✓ tD TArrEp ,•6 Pfk rc �aLE z w <br /> _'--_----- C Li <br /> G J <br /> ao � <br /> L � � <br /> Low <br /> oz00 <br /> ROOF FRAMING FLAN � Ico <br /> P, R <br /> A-3.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.