My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8015 Broadway Everett LLC 3/20/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
8015 Broadway Everett LLC 3/20/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:12:27 PM
Creation date
3/28/2025 12:11:00 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
8015 Broadway Everett LLC
Approval Date
3/20/2025
End Date
4/15/2025
Department
Public Works
Department Project Manager
Anne Weech
Subject / Project Title
Voluntary Compliance Agreement (VCA)
Tracking Number
0004746
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Description of Date(s): 8/22/2024, a Notice of Violation and Order was issued on <br />Violation and codes 8/22/2024 with corrective action date 2/24/2025 for full abatement. <br />violated: (Notice(s) <br />A Violation and/or The parking of vehicles upon nonapproved surfaces, including gravel, <br />other enforcement dirt and grass, fails to meet City Parking Area Design & Surfacing <br />documents) issued Requirements, in violation of the following Everett Municipal Codes <br />are attached to this (EMC): <br />Agreement) <br />EMC Provision(s) Violated: <br />EMC 19.34.120 B.1, and EMC 19.41.020 B, <br />EMC 19.34.120 Parking area design and construction. <br />B. Surfacing. <br />1. All parking areas shall consist of durable surface materials approved <br />by the planning director and city engineer. Depending upon site and soil <br />conditions, low impact development (LID) stormwater management <br />facilities are encouraged, and may be required by the city's stormwater <br />management manual. <br />EMC 19.41.020 Enforcement, violation and penalties. <br />A. Enforcement. Enforcement of the provisions of this title and of any <br />permits or approvals issued pursuant thereto shall be performed in <br />accordance with the procedures established in this title and <br />Chapter 1.20 EMC. <br />8. Violation. No person, firm, association, corporation or any agent <br />thereof shall violate or fail to comply with any provisions of this title <br />or use any property, erect <br />any structure, occupy or use any structure or place any improvement on <br />property in violation of any provision of this ti <br />any tle. Each such person, <br />firm, association, corporation or agent thereof shall be deemed guilty <br />of a separate offense for each and every day during which any violation <br />of any provision of this title is committed, continued or permitted. <br />Corrective Actions) By 4/15/2025 <br />Required and • Cease parking upon the unpermitted parking areas. <br />Compliance <br />Schedule for <br />Corrective Action(s) <br />Page2of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.