My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7100 HARDESON RD 2025-06-09
>
Address Records
>
HARDESON RD
>
7100
>
7100 HARDESON RD 2025-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2025 1:12:42 PM
Creation date
3/31/2025 9:45:47 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7100
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2587
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B022FCCE-7A16-41E4-BD3F-5C1AEBF60AF1 <br />DETERMINATION OF NONSIGNIFICANCE <br />Project Name: MCOB Maintenance Improvements <br />Description of Proposal: Community Transit is proposing a project that includes expansion of the <br />existing Maintenance and Operations (MCOB) building to install new vehicle maintenance bays and <br />increased body repair shop capacity. The project also includes re -roofing the existing bus wash <br />building, resurfacing existing paved areas for bus parking and installation of a new below -ground <br />stormwater detention vault. <br />The project area is approximately 7 acres; no additional footprint will be added to the previously <br />developed area. <br />Project Proponent: <br />Snohomish County Public Transportation Benefit Area <br />Corporation (Community Transit) <br />Location of Proposal: <br />Everett, Washington <br />Lead Agency: <br />Community Transit <br />The lead agency has determined that the proposal does not have a probable significant adverse <br />environmental impact on the environment. An environmental impact statement (EIS) is not required <br />under RCW 43.21 C.030(2)(c). This decision was made after a review of the completed environmental <br />checklist and other information on file with Community Transit. This information is available to the <br />public on their website at www.communitytransit.org/mcobSEPA. <br />This Determination of Nonsignificance (DNS) is issued under WAC 197-11-340(2) and Community <br />Transit's SEPA rules (Resolution 3-05). The lead agency will not act on this proposal for 21 days from <br />the date of issue. Comments must be submitted no later than 14 days after date of issue, by 5:00 p.m., <br />December 30, 2020. Comments should be submitted to the responsible official at the address given <br />below. The responsible official will reconsider the DNS based on timely comments and may retain, <br />modify, or, if significant adverse impacts are likely, withdraw the DNS. If the DNS is retained, it will <br />be final after the expiration of the comment deadline. <br />Responsible Official: <br />Roland Behee <br />Position/Title: <br />Director of Planning and Development, Community Transit <br />Telephone: <br />(425) 348-7100 <br />Address: <br />7100 Hardeson Road, Everett, WA 98203 <br />Website, Email: <br />www.communitytransit.org, riders@commtrans.org <br />Appeals to this determination may be made to the above responsible official no later than 21 calendar <br />days from the date of issuance of this DNS, by 5:00 p.m., January 6, 2021, by submitting a written <br />statement requesting an appeal, setting forth the information required by Community Transit's SEPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.