Laserfiche WebLink
1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 110111 12 13 14 15 16 17 18 19 20 21122 1 23 24 1251261271281 29 1 30 31 32133 1 34135 1 36 371381 39 40 411421431441 45 1461471 481491 50 51 1 52153 1 54 1 55156 1 57158 1 591601 61 1 62 63 64 1 65166 1 67168169170 1 71 72 1 73174 1 75 761771781791 80181182 1 83184 1 851861871 88 89 90 91 92 <br />0 30 60 120 <br />1 inch = 60 feet <br />NO. DATE REVISION MCOB MAINTENANCE IMPROVEMENTS DRAWN: TLC PROJECT NO.: 20-002 <br />�� oa 1ASHMyo FACILITIES MASTERPLAN PHASE 3A <br />DESIGNED: CJM DATE: DECEMBER 22, 2020 <br />kpff 7100 HARDESON ROAD, EVERETT WA 98203 CHECKED: LAW PERMIT SUBMITTAL <br />1601 5th Avenue, Suite 1600 n 2a009 <br />Seattle, WA 96101 �o, Recrs7ene� �wro DRAWING NO.: ■ O O <br />SgSIONAL �LANDSCAPING OVERALL SITE PLAN <br />WO`8.622.5622 <br />vw.kpif.com 01/05/21 11 <br />