My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 6/22/2023 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2306-015 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: REV1123-011 <br /> everettwa.gov/permits Public Works Fee: $9,159.44 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MINA PROPERTIES III LLC DAVID HARMSEN <br /> 1418 MARKET ST <br /> KIRKLAND,WA 98033 <br /> PHONE: 2067833100 PHONE: <br /> SITE ADDRESS:2801 35TH AVE NE TAX PARCEL ID#:29050500401000 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITE GRADING FOR ACCESS FROM 35TH AVE NE,PAVING,DRAINAGE <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8. As-builts of water,sanitary sewer,and storm systems are required to be submitted to the PW Inspector per City"Design and Construction <br /> Standards and Specifications for Development" prior to the utilities being brought online.Water,sewer,and storm as-builts may be <br /> submitted separately as they become available.Water as-builts MUST be submitted prior to the Water Department making connection to <br /> the public water system and putting the new water main in service. It is encouraged for the water system to be surveyed prior to cover. <br /> 9. A Declaration of Covenant for Stormwater BMPs shall be submitted to the City prior to final approval/close out of the permit. <br /> 10. A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City <br /> prior to final approval/close out of the permit. <br /> 11. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.To schedule a planning <br /> inspection,contact Planning@everettwa.gov and request an inspection with the permit number,site address,and inspection type listed. <br /> Please allow up to one week for the inspection to be scheduled. <br /> 12. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 13. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this <br /> permit. <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control..........................................................................$200.00 <br /> Driveway(No C/G).......................................................................$25.00 <br /> Grade/Fill/Excavate(2,100 CY)..................................................$260.00 <br /> Paving(31,620 SF)......................................................................$158.10 <br /> PW Plan Review...........................................................................$20.00 <br /> PW Site Inspection.......................................................................$20.00 <br /> Stormwater System Development Fee(31,620 SF)................$8,476.34 <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.