Laserfiche WebLink
SECTION 4 & 5, TOWNSHIP 29 NORTH, RANGE 5 EAST, W.M. <br /> d� <br /> du <br /> W Z M = <br /> O <br /> U <br /> '6 O � <br /> d N <br /> � � ¢ <br /> 0 30 60 d NU <br /> eec •' O M z <br /> i Q O <br /> W N N O <br /> O ate.. o w <br /> 1 w <br /> LEGEND <br /> W <br /> FOUND MONUMENT IN CASE TRANSFORMER PAD x GROUND SHOT <br /> N <br /> DEMO THE EXISTING // \\ OO FOUND IRON PIPE AS NOTED o MAILBOX FENCE LINE <br /> PAVEMENT <br /> THAT IS <br /> \\ O FOUND REBAR AS NOTED SIGN POST —c— GAS LINE <br /> 50 LF CONSTRUCTION ENTRANCE / \ l b,...`� \\\ 11 FROM CENTRLNE I FOUND PLAT MONUMENT SEWER MANHOLE —v— POWER LINE REVISIONS <br /> PER BMP C105&STD DTL 201 . <br /> \\ ® O <br /> . . \ \\ `�° \\\ BENCH MARK ❑T TELEPHONE PEDESTAL —uv— POWER LINE(UNDERGROUND) co co <br /> Mo M <br /> \ \ ' ' ' ' _ J \\ -;3 4• CONTROL POINT JUNCTION BOX —ss— SEWER LINE cc cc n¢N m <br /> 0 CATCH BASIN POWER POLE W/U.G.FEED —so— STORM DRAIN LINE W O n <br /> W WATER VALVE o POWER POLE —r— TELEPHONE LINE Z W o o <br /> GAS VALVE 1(�- FIRE HYDRANT —UT— TELEPHONE LINE(UNDERGROUND) /rt `✓N <br /> O—�.ELUMINAIRE ® WATER METER WATER LINE VZ Q <br /> \ \\ \ I \\ rr TEMPORARY INLET PROTECTION W a <br /> CLEARING LIMITS(BMP C101) (BMP C220) <br /> 11 FILTER FABRIC FENCE(BMP C233) <br /> CLEARING LIMITS I /3 \ 1 `\ 1 0 11 \ EXISTING ASPHALT TO BE REMOVED Z ao <br /> PER BMP C103 1 ' STOCKPILE <br /> SILT FENCE 1 ; / PER BMP C123 <br /> PER BMP C223& p11 <br /> WSDOT DETAIL I-30.10-02 I 1 1 I' I e l I W <br /> STABILIZATION NOTES <br /> g TEMPORARY04 <br /> N <br /> STABILIZE PAVED AREAS WITH CRUSHED ROCK Cn to <br /> / / \ 9 11 / /� O PER PAVING SECTION � Q m Q <br /> STABILIZE ALL FUTURE LANDSCAPE AREAS WITH 2 n 3 <br /> 22 JV SEEDING&4"STRAW MULCH =/ N X W GAS MAIN EASEMENT 11 I I / / Q 00 <br /> m <br /> REC.NO.1259430 1 1 I /� W 2 <br /> NOTE a <br /> 1. SITE WILL USE CEMENT TREATED BASE TO STABILIZE <br /> ON-SITE SOILS DURING GRADING.FOLLOW GEOTECHNICAL <br /> RECOMMENDATIONS IN THE MEMORANDUM EN <br /> TO. <br /> BMP LIST " <br /> d o <br /> R.O.W. 30' '1 1 I ELEMENT#1-MARK CLEARING LIMITS Vs �� <br /> BMP\ 101 PRESERVING NATURAL VEGETATION R.O.W.ROW 1 11I / BMP C103 HIGH VISIBILITY PLASTIC OR METAL FENCE PRO <br /> ELEMENT#2-ESTABLISH CONSTRUCTION ACCESS <br /> BMP C105 STABILIZED CONSTRUCTION ACCESS Z <br /> \\ 1 L\\ �// / I1pp�� BMP C107 CONSTRUCTION ROAD/PARKING AREA STABILIZATION Q <br /> pw \ L_ — L J l ELEMENT#3-CONTROL FLOW RATES a <br /> I,y\ � 'x __ - / II I I ELEMENT#4-INSTALL SEDIMENT CONTROLS O <br /> / w�\ _roE= ��\\ / N / ' BMP C233 SILT FENCE V F KWua <br /> � � � � I I �' _ ELEMENT#5-STABILIZE SOILS J Z <br /> \ H'\ �A __ BMPC120 TEMPORARY AND PERMANENT SEEDING J LU <br /> . . . . . .\. �� w\ v� / �.( ' I I-- L _ r°°— BMP C121 MULCHING (n W N W <br /> . . / --_ I'1' T °� _/ I�_ 1\ - --_ '°'� BMP C125 TOPSOILING Z <br /> BMP C100 Er <br /> W 40 DUST CONTROL J Op a <br /> \1\ BMP C107 CONSTRUCTION ROAD/PARKING AREA STABILIZATION cc Q Z <br /> RIM=6.05 / ,l n —— — - ELEMENT#6-PROTECT SLOPES Lu a= O <br /> IE IS)=i.zo' / 9 \ — — ——— — BMP C130 SURFACE ROUGHENING d oo F <br /> --_ _--- — _ '°E— SEE STABILIZATION BMPS UNDER ELEMENT#5 n LU J <br /> _ o <br /> �\ cc <br /> . . . . . . . / F ' ' . . \\\�—=-1-= � ELEMENT#7-PROTECT DRAIN INLETS d 00 LU <br /> _ '°° BMP C220 STORM DRAIN INLET PROTECTION IL <br /> . . . . . . _______, Q W <br /> SDCB . . . . I' —= -=--- ELEMENT#B-STABILIZE CHANNELS AND OUTLETS Z W <br /> RIM=6.35 <br /> IE(N)=1.30 \ <br /> Si ( ELEMENT#9-CONTROL POLLUTANTS <br /> yy Q <br /> \ BMP C151 CONCRETE HANDLING <br /> RIM-6.T1 'I �' W— BMP C152 SAWCUTTING <br /> \\ IE(S)=2.36 W 1 <br /> \\\lam ' ' �IW— f'✓� T)#10153 MATERIAL DELIVERY,CONTROL DEWATERING STORAGE,&CONTAINMENT O <br /> ELEMENT <br /> to <br /> ELEMENT#11-MAINTAIN BMP'S <br /> BMP C150 MATERIALS ON-HAND DATE: <br /> BMP C160 CESCL 9/14/23 <br /> ELEMENT#12-MANAGE THE PROJECT <br /> BMP C150 MATERIALS ON-HAND JOB#: <br /> BMP C160 CESCL 21-1 62 <br /> BMP C162 SCHEDULING <br /> ELEMENT#13-PROTECT LOW IMPACT DEVELOPMENT <br /> BMP C120 TEMPORARY AND PERMANENT SEEDING , <br /> BMP C121 MULCHING <br /> Know what's below. <br /> Call before you dig. <br /> C2.0 <br /> PAWORMPROJECTS\2021I21-162 SEA COMCE\DWG\SHEETW2.0 SWPPP SMALL.DWG 9/14/2023 <br />