Laserfiche WebLink
Note: The City does not generally accept stormwater pumps. However, if allowed, <br /> provide information to describe how the pumps meet the Flow Control <br /> Performance Standard and requirements in the DCSS. <br /> Frontage improvements are considered to be part of the project hard <br /> surfaces, and MR #7 requirements should be addressed for frontage <br /> effective impervious surface. <br /> MINIMUM REQUIREMENT #8 <br /> • Summarize the wetland characteristics, describe the project's wetland protection <br /> level requirements, and attach supporting wetland studies. <br /> • Describe the General Protection and Protection from Pollutant measures that will <br /> be applied to the project. <br /> • Where required, the project shall attempt to meet both the Minimum Requirement <br /> #7 Flow Control Performance Standard and the Minimum Requirement #8 Wetland <br /> Hydroperiod Protection requirements. If the project cannot meet both requirements, <br /> maintaining the wetland hydroperiod takes precedence. The SSP shall clearly <br /> document why the project cannot meet both requirements and provide supporting <br /> iterative modeling data. <br /> For Method 1 project: clearly describe all monitoring and evaluation procedures used <br /> according to the Manual I-C.5. This should include the following: <br /> • Describe how wetland bathymetry was determined and provide a figure of the <br /> contours or other relevant data or calculations. <br /> • Provide a map indicating hydroperiod and flow monitoring locations. Describe why <br /> these locations were selected and the type of equipment used. Describe the flow <br /> monitoring approach. Provide all monitoring data. <br /> • Indicate if groundwater flow is a significant characteristic. Provide information on <br /> groundwater influence, if applicable. <br /> • Describe how the SSD table was developed and include any supporting information. <br /> • Provide modeling results and the completed Ecology Excel sheet as referenced in <br /> the online interactive Ecology Manual. Include a figure showing all modeling inputs <br /> as well as the entire contributing area to the wetland vs. the project contributing <br /> area. Verify compliance with the Method 1 Hydroperiod Protection Criteria. <br /> For Method 2 projects provide modeling results and verify compliance with the Method <br /> 2 Hydroperiod Protection Criteria. Provide a figure indicating all modeling inputs. <br /> Note: Minimum Requirement #8 applies to TDAs whose stormwater discharges to <br /> a wetland, either directly or indirectly through a conveyance system. <br /> Minimum Requirement #1-9 Supplemental Guidance City of Everett <br /> Page 18 Aug 2022 <br />